1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese...
-
Upload
joslyn-garney -
Category
Documents
-
view
218 -
download
1
Transcript of 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese...
![Page 1: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/1.jpg)
1
![Page 2: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/2.jpg)
2
CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION
RUNOFF ON-SITE
Primo L. AcerneseTerraGroup CorporationTECWAR® SystemsAllentown, PA
Originally Presented atUSSOCOM CBRN CONFERENCE
Tampa, FL6-8 December 2005
![Page 3: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/3.jpg)
3
OBJECTIVES
• Consider the logistical and practical challenges that face federal, state and local agencies concerned with mass casualty decontamination, and subsequent decontamination runoff issues
• A quick look at current methods, mind sets and mistakes
• Explore alternatives and a new approach
![Page 4: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/4.jpg)
4
BACKGROUND
• Mass decontamination operations require water and subsequent handling and treatment of contaminated runoff
• Current mind set: EPA has stated, that, in accordance with liability in CERCLA, the run-off is not a primary concern????
![Page 5: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/5.jpg)
5
EPA First Responders Liability Guidelines Statement:
• “Once any imminent threats to human health and life are addressed, first responders should immediately take all reasonable efforts to contain the contamination and avoid or mitigate environmental consequences.”
• “First responders would not be protected under CERCLA from intentional contamination such as washing hazardous materials down the storm-sewer during a response action as an alternative to costly and problematic disposal or in order to avoid extra effort.” USEPA Chemical Safety Alert
Office of Solid Waste and Emergency Response EPA 550-F-00-009July 2000 www.epa.gov/ceppo/
![Page 6: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/6.jpg)
6
THE PROBLEM
• Current decontamination procedures do not address the safe, secure and economic handling of decontamination runoff.
• Lack of preparation and training potentially allows perpetrators the windfall of poisoned land, water and economic disruption.
• Traditional mind set views saving human life and environmental protection as mutually exclusive concepts
![Page 7: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/7.jpg)
7
THE PROBLEM II
REALITY CHECK – Water Usage for Victim Decon
MASS CASUALTY VICTIMS VS GALLONS
5000 casualties X 8 GPP = 40,000 gallons
20,000 casualties x 8 GPP = 160,000 gallons
35,000 casualties x 8 GPP = 280,000 gallons
100,000 casualties x 8 GPP = 800,000 gallons
Military Tanker Truck Capacity – 5000 gallons
GPP = gallons per person
![Page 8: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/8.jpg)
8
Current Decon Runoff Options
1. Raw Discharge – unacceptable environmental impact
2. Dilution of contaminated runoff
3. Haul Away – potential spread of contamination outside the hot/warm zone – coordination logistics with mass casualty incident decon problematic
![Page 9: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/9.jpg)
9
Decon Runoff - Option 1
Raw Discharge
• Perpetrator Windfall
• Potential Spread of Contamination During Procedure
• Unknown Ramifications Downstream of Decon Site
• Long Term Effects Potential
![Page 10: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/10.jpg)
10
Decon Runoff - Option 2
Dilution of Runoff
• Determining Correct Cut: 2:1 5:1 20:1?
• Where is it coming from? 2:1 with 40K = 80K needed
• How will it get to Decon Site? Tanker; Hydrant; Garden Hose? Logistics Meltdown
• Where and When Will it be Done – DECON INTERRUPTION
• Unrealistic Approach
![Page 11: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/11.jpg)
11
Decon Runoff - Option 3
Haul Away
• Mass Casualty Quantities = Lots of Tanker Trucks
• Security Issues = What Tanker?; Who’s Driving?; Was Tanker Checked?
• DECON INTERRUPTION – Transfer of Contaminated Runoff
• Where is it going?
• Potential Contamination Outside Hot Zone
• HOW MUCH WILL THIS COST? (industrial waste can cost over $8.00/gallon)
![Page 12: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/12.jpg)
12
![Page 13: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/13.jpg)
13
![Page 14: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/14.jpg)
14
![Page 15: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/15.jpg)
15
RECOMMEND SOLUTION
Capture, Contain, Treat and Dispose On-Site
• Minimizes First Responders Liability
• Mitigates Adverse Environmental Impact,
• Avoids Risk of Spreading Contamination During Procedure and Transport
• Allows Uninterrupted Decontamination of Victims.
• Complete Decon Procedure Under the Control of First Responders.
![Page 16: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/16.jpg)
16
DRED™ System ProfileDecontamination Runoff Environmental Defense™ System
• Portable
• Modular
• Scalable
• User Friendly/Minimal Technical-Operational Training
• Disposable Components
• Adaptable to any Decontamination Corridor
![Page 17: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/17.jpg)
17
Decontamination runoff treatment system components
![Page 18: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/18.jpg)
18
Decontamination corridor footprint
![Page 19: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/19.jpg)
19
Decon Runoff Treatment Process Flow
STAGE VII
POLISHER BANK II
1 MICRONFINAL FILTRATION
Organic Contaminants
STAGE VII
POLISHER BANK II
1 MICRONFINAL FILTRATION
Organic Contaminants
STAGE II
PRE-FILTRATION
Tri-Flow Pre-Filtration
50-25-5 MICRONSOLIDS
PARTICULATESTSS
STAGE II
PRE-FILTRATION
Tri-Flow Pre-Filtration
50-25-5 MICRONSOLIDS
PARTICULATESTSS
STAGE V
POLISHER BANK I
5 MICRONFILTRATION
Organic Contaminants
STAGE V
POLISHER BANK I
5 MICRONFILTRATION
Organic Contaminants
STAGE IV
MMFFSTM
CONTACTORS
Chemical Radiological
Nuclear
Inorganic / Organic Contaminants
STAGE IV
MMFFSTM
CONTACTORS
Chemical Radiological
Nuclear
Inorganic / Organic Contaminants
STAGE III
RECOR® REACTOR
Neutralize HTH
Heavy metals Adsorption
Microorganisms inactivated
STAGE III
RECOR® REACTOR
Neutralize HTH
Heavy metals Adsorption
Microorganisms inactivated
STAGE I
CONTAINMENT BAGWITH CONTAMINATED
DECON SOLUTION
Calcium Hypochlorite HTH
.5% topical application
STAGE I
CONTAINMENT BAGWITH CONTAMINATED
DECON SOLUTION
Calcium Hypochlorite HTH
.5% topical application
STAGE VI
LIFE® REACTOR
(Liquid Internal Filtration Effect)
(CONTACTOR SUPPORT)
STAGE VI
LIFE® REACTOR
(Liquid Internal Filtration Effect)
(CONTACTOR SUPPORT)
![Page 20: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/20.jpg)
20
Complete Decon Corridor
![Page 21: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/21.jpg)
21
Conclusion
• How prepared is the organization to respond to a strike scenario involving a mass casualty CBRN incident and subsequent decontamination operation?
• An effective response requires a coordinated plan for first responders and support personnel that is based upon pre-positioned assets.
• Training strategy must include realistic mass casualty drills and environmental impact of response operations
• Budgets / Assets must include a disaster response plan addressing all of the above
• Procurement Strategy must be streamlined to support mass casualty incidents
![Page 22: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/22.jpg)
22
?Are we ready
![Page 23: 1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.](https://reader036.fdocuments.net/reader036/viewer/2022081515/55168e3e550346f0208b45aa/html5/thumbnails/23.jpg)
23