Joint Base San Antonio 502nd Air Wing
Operational Energy Management Plan
Version July 7, 2011
1
2
Agenda
Section
I. Project Background / Charter Review
II. OEMP Summary
III. Lessons Learned / Critical Success Factors
IV. Next Steps
3
• Anthony Matinez – USAF CIV (US) OEMP Project Lead
• John Kain - HQ AETC
• Garland Scott - HQ AETC
• Bruce Nadler - HQ AETC
• Joe Haltaman - Randolph AFB Energy Manager
• Ruben Ramos - Randolph AFB Utility Engineer
• Bruce Dschuden - Randolph AFB Resource Efficiency
Manager
• Andres Hinojosa - Lackland AFB Energy Manager
• Elias Abdulahad - Lackland AFB Utility Engineer
• Dennis Seegar - Lackland AFB Resource Efficiency Manager
• Monico Luna - Energy and Utilities Chief Lackland AFB
• John Gonzales - Fort Sam Houston Utility Engineer
• Frank Thomas - Randolph AFB Resource Efficiency Manager
• Erik Hanson - BAH Engineer
• David Pratt - BAH Engineer
JBSA Energy Working Team
Objective: Provide project management support to JBSA to facilitate an environment of open dialogue and information exchange whereby the following commitments can be met:
1. Construct an Energy Strategic Management Plan that ties all of the JBSA activity to EO, legislation, QDR, OSD policy, etc. down to the objectives, activities and metrics being reported:
a. Strategic Energy Management Plan will incorporate and show clear linkages to DOD Leadership guidance and include Goals, Objectives, Projects/Tasks planned to achieve plan
b. Construction of Energy metrics that are reported by month (as lagging indicators) to serve as leading indicators by quarter.
c. Ensure submission of AFCESA-funded project cases present solid business cases complimenting the overarching strategic energy management plan of JBSA
2. Construct JBSA -wide project plans that will connect the vast amount of SEMP activity, enable visibility and drive execution.
Meter Installation Plan, Metrics/Measures and Reporting, Asset Identification & Replacement Mgt, Capital/Savings Investment Ratio Analysis, New Construction/Renovation Project Planning, Marketing and Education Plan
Project Charter Summary
4
4Q /1Q Working Sessions
1Q Working Sessions &SEMP Development
2Q Working Sessions &OEMP Development
Define Measure Analyze Improve Control
2Q + Working Sessions &
OEMP Implementation
Performance Improvement Milestones
OEMP Milestone Summary
Lessons Learned
5
• Accurate and consolidated Baseline Models are critical
• Leverage best practices for JBSA , Military Services and Private Sector for OEMP
• Utilize pilots and beta projects to increase first hand knowledge and scalability
• Provide JBSA standards for SIR determination and funding sources/acquisition
• Implement metering and closed loop control systems for consumption visibility
• Implement productivity projects to optimize the overall efficiency of energy conservation
• Standardize governance model and resource infrastructure for speed of implementation
• Utilize standard operational model with roadmap for continuous process improvement
Joint Base San Antonio 502nd Air Wing
Operational Energy Management Plan
Version July 7, 2011
OEMP Summary
6
7
Contents of the OEMP
Table of Contents
1. Introduction ....................................................................................................3
2. Executive Summary ....................................................................................... 5
3. Key Drivers for Energy Conservation Target Attainment ................................ 6
4. Productivity Initiatives................................................................................... 12
5. JBSA Energy Conservation Governance Model Guidelines ......................... 17
6. Process Used to Develop the Operations Methodology ............................... 22
7. Roadmap Implementation Steps for Energy Mgt Plan Target Attainment.....23
8. Summary of Consumption, Targets, and Gaps (Gap Analysis) .................... 31
9. Energy Project Scoring Model......................................................................33
10. Initial Rank Order and Implementation Status of Projects .......................... 36
11. Project Pipeline Analysis – Initial Status..................................................... 37
12. Alternative Strategies to Meet the Targets ................................................. 39
13. Stakeholder Information Action Plan Analysis (SIAPA) .............................. 41
14. Awareness Campaign ................................................................................ 43
15. Issues, Risks, and Opportunities ................................................................ 44
16. Planning for Energy Security and Energy Independence ........................... 46
Appendix A: Legislation, Orders and Directives ............................................... 47
Appendix B: Baseline and Conservation Targets Section: ............................... 49
Appendix C: Current Projects:.......................................................................... 50
Appendix D: Proposed Projects: ......................................................................55
Appendix E. High Square Footage...................................................................60
The Joint Base San Antonio - Operational Energy Management Plan (OEMP) is designed to align with legislative goals and targets and simultaneously focus on the current dynamic requirements of our mission. The OEMP ties all of our energy management activity to executive and legislative authorities while adhering to the spirit and intent of the Department of Defense Strategic Management Plan, the Air Force Energy Plan 2010 and The US Army Energy Strategy for Installations. It links these laws, directives and instructions from the National level, Department of Defense (DOD) and Military Departments to our goals, objectives and tasks. As the Vision of the Air Force Energy Plan 2010 states, “Making Energy a Consideration in All We Do” succinctly encompasses the practicality of the energy management effort locally here at JBSA.
Explore and Deploy New Technology Beta Projects
Introduction
8
A six step operational model is used to determine the best way forward for JBSA to attain its energy goals. The model is based on best practices from leading constructs in Energy Management, LSS, Decision Theory and Risk Management.
OEMP Framework9
OEMP Framework for CPI
Key Drivers for Energy Conservation Target Attainment
Implement Tier 1 High Energy Conservation Return HVAC projects across all JBSA facilities. Buckets included: No Cost Constraints
Target MBTUs saved = 325,112 Estimated Project Amount = $34,000,000 (20 year cost) Estimated Annual Return = $3,200,000
The initial HVAC project was successfully implemented in 2009. Key lessons learned from the implementation of these systems include: Studying chilled water connections, physically or virtually connect units to eliminate smaller units and make larger units more efficient. Compliance in this area provides for closed loop control over major energy consumption equipment.
Implement Tier 2 Energy Conservation projects across all JBSA facilities using scoring model priorities. Buckets included: Next Best Tier of High Energy Projects Strategy and Metering
These projects include: envelop/insulation, lighting and individual room energy savings devices
Target MBTUs = 436,939* Estimated Project Amount = $31,168,000 Estimated Return = TBD (* PA data missing for some projects)*Additional 878,701 MBTUs can be saved in Tier 2 that currently lack project amount estimates
These projects are consistent with the Dept of Energy guidelines and Air Force Best Practices. Compliance in this area yields conservation benefits in new construction as well as historic preservation.
High $$ Project Amount Low
High
MBTUsSaved
Low
Individual Unit Solutions
Solar
HVAC & Controls
StandardsDeployment
Teams
Utility BillScorecards
Insulation / Envelops
Governance
Relative Return of Energy Conservation Strategies
MeteringSystems
10
Implement Level 3 Low Cost – High Impact Conservation projects and methods across all JBSA facilities using scoring model priorities. Buckets included: Technology, Incentives and Awareness, MBTU Calculations, and Alternative Work Methods
These projects include: single room usage detection devices and focus on individual soldier and civilian behavior that reside and work in JBSA.
Target MBTUs = 1,246,025* Estimated Project Amount = $7,000 Estimated Return = TBD (* PA data missing for some projects)
*Additional 36,900 MBTUs can be saved in Tier 3 that currently lack project amount estimate
As these projects focus on behavior and culture change, they can provide significant MBTU reduction for minimal cost Implement Closed-Loop Metering Systems that Enable Policy & Contingency Compliance
Enhance the current metering plan and investments to account for all major energy systems in JBSA and ensure closed loop control capability exist. Resources trained to properly operate equipment and program controls will also be required.
11
Key Drivers for Energy Conservation Target Attainment
Utilize Rapid Deployment Teams to Drive Standardization & Rapid Continuous Improvement
Tiger Teams that specialize in SIR Proposals, project implementation areas and equipment installation and maintenance are recommended to implement / replicate projects across all bases vs. base specific teams. This best practice will accelerate implementation learning and overall savings.
Once implemented, formal recognition systems will be implemented to highlight best practices among individual and team contributors.
Project Best Practices & Replication
ActivityCostScheduleEnergyResourcesStd Methods
Prioritize, Measure, Replicate and Reward
=
Streamline & Optimize Project ID, Funding, Contract Award & Implementation
Current Funding Steps may take up to 33 months and cover 30 steps across multiple stakeholders.
One of the key requirements of the JBSA energy conservation effort will be to provide the data required to identify projects that will help meet the energy conservation goals, have available capable resources for full implementation and provide data to begin to count actual energy conservation in a timely manner.
IdentifyBeing
Validated
Approved and
FundedAwarded Complete
From
To
Streamline & Optimize Project ID, Funding, Contract Award & Implementation
Current Project Implementation
Streamlined Project
Implementation
time
IdentifyBeing
ValidatedComplete
Approved, Funded, and
Awarded
12
Key Drivers for Energy Conservation Target Attainment
Alter the assumption/rule that projects must be in place
for a full year prior to the actual realization of MBTU
savings. This is not a best practice in industry and
essentially reflects a notion that when one turns off power in
an unused building, that building must be turned off for a full
year before the conservation savings can be counted. The
alternative and more accurate way to account for these
savings would be to collect verification data on a real
time, monthly or quarterly basis. Bases are encouraged to
conduct in-depth discussions regarding conservation savings
in this regard as it will result in a more realistic and favorable
indication of the timeliness of actions taken and achieve
targets faster.13
Key Drivers for Energy Conservation Target Attainment
Explore and Deploy New Technology Beta Projects
Several new and best practice ideas are introduced for beta projects for JBSA energy conservation analysis to include:
• Solar panels for large scale fields
• Solar based materials for windows
• Electric cars
• Individual room detection devices
• Other
Explore and Deploy New Technology Beta Projects
14
Key Drivers for Energy Conservation Target Attainment
Adopt Disciplined Use of Asset Management & Work Order Systems and Methods
Analysis of current asset & maintenance management systems (AMMS) indicate that several hundred structures are maintained in JBSA. An updated AMMS will assist stakeholders to indentify key areas of square footage, use, age, energy consumption, energy standard, and overall audit/LEED status. • Standardized Work Order Systems should be utilized to track equipment reliability and identify opportunities for predictive maintenance, spare part contracts and preferred supplier data.
• Additional data fields, user friendly reporting capabilities should be added to maximize visibility of all assets related to the JBSA Energy Conservation Program.
15
Key Drivers for Energy Conservation Target Attainment
Implement Conservation Communications for All Stakeholders
Analysis reveals that approximately 12 stakeholder groups exist with JBSA and DOD that can positively influence the direction of energy conservation at JBSA.
Best practices in large scale transformation indicate that success is achieved when all key stakeholders are involved in the target changes and that they understand their respective roles in the change.
Assign Energy Conservation Targets to All Stakeholders
Once all stakeholders are identified for the energy conservation effort, it is imperative that specific targets be identified and tracked. An example for this area would be the exclusion of Wilford Hall Hospital.
Although plans currently exist to transition out of this facility, until the full transition occurs the approximately 878,700* MBTUs are being consumed annually in this structure.*based on 2010 data
16
Key Drivers for Energy Conservation Target Attainment
Productivity Initiatives
E-billing - move from hardcopy and individual bills provided by the utility company that require manual signature to electronic individual billing with electronic signature verification and data analysis capability.
This process improvement project will save approximately 1 -2 days per month for each energy manager per base, postage, facilitate more timely payables and enable user friendly visibility to data captured via meters.
Individual bills from home and businesses would also be generated from this project. The visibility provided to base command relative to high consumption energy users is a cornerstone of the awareness campaign underway at JBSA. Estimated implementation time is 2-3 months depending on reporting complexity.
E-Workflow tools – transition from manual paper flow to allow for near real-time monitoring of project transaction status. Process dashboards can be established to provide multi-level status reports on billing, project funding and energy life cycle implementation. “Electronic Triggers” and business rules can be established within the workflow tools for reminders, alarms and user math based decisions and business rules. Estimated implementation time is 2-3 months depending on complexity. Figure 4.1: Example of Workflow Tool to Collect Project Status,
Measure Results, and Status Reporting
17
Project identification, Funding, Award and Implementation Cycle Analysis – Transition from up to 33 month cycle time to 50% improvement
Leverage industry best practices in the JBSA environment to further streamline the overall project life cycle to include the following: review all contracts for standard terms and conditions as well as unique requirements to streamline the overall contract and related processing cycle.
Revisit/Change current accounting rules that require 1 full year of implementation prior to counting energy savings. Implement meter based savings verification.
Contract Terms and Condition Rationalization and Standardization
Contract Allocation and Volume, Rate Table and Pricing Analysis
18
Productivity Initiatives
Temperature and Thermostat Analysis and Setting Controls
Utilize data analysis of JBSA temperature trends to identify thermostat settings and establish related guidelines for temperature control systems.
Utilize data analysis of JBSA temperature trends to identify thermostat settings and establish related guidelines for temperature control systems.
From the charts below, the following initial observations were made by the Energy Working Team:
Data analysis indicates that climate has not historically changed for the JBSA region. However, climate could be a factor in affecting how individuals, business owners and command CEs should align thermostat settings in line with recommended government setting for various seasons during the year.
Investigation should be conducted to minimize extreme temperature adjustments while actual temperatures fluctuate by month. Specific control systems, such as EMCS, would reduce the temperature fluctuations and therefore lower stress on HVAC systems and related O&M costs.
Awareness campaigns should align with these thermostat guidelines and should include alternative approaches for personal comfort level.
Temperature in San Antonio
0
10
20
30
40
50
60
70
80
90
100
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Month
Ave
rage
Tem
pera
ture
20062007200820092010
Trend Analysis of Temperature Differences to Recommended Thermostat Settings
-25
-20
-15
-10
-5
0
5
10
15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Month
Diffe
renc
e Be
twee
n th
e G
over
nmen
t Sta
ndar
d Th
erm
osta
t Set
ting
and
Actu
al T
empe
ratu
re
2006
2007
2008
2009
2010
Average Temperature in San Antonio
19
Productivity Initiatives
Energy Conservation Continuous Process Improvement
Disciplined use of best practice project and program management techniques will be practiced to fully realize the target conservation reductions identified in the JBSA OEMP.
The diagram to the right illustrates the full life cycle of the DMAIC process that focuses on the disciplined use of data, measurements and project management to help guide priority project selection, resource utilization and ensure actual benefits are realized.
The overall goal of the JBSA framework, operating model and governance structure is to ensure that all target projects reach a control phase of implementation.
It is the Control Phase of the continuous process improvement effort that will provide the project outcome reliability to justify project replication, training, resource allocations and overall audit ability to meet 2015 energy conservation targets.
Define
Measure
Analyze
Improve
Control
Legislative & Executive Order Targets
JBSA Mission Goals and Objectives
Consumption Baselines
Aggregate Projects across all Bases
Actual Savings vs. Annual targets
Implementation & Replication Opportunities
Air Force / Services and Dept of Energy - Best Practices
Measures
New Project Implementation Opportunities
Rapid Deployment Teams
Integrated Energy Conservation Governance Model
Measures and Scorecards
OEMP Implementation
Energy Conservation Continuous Process Improvement using LSS
20
Productivity Initiatives
The Energy Conservation Governance model will provide for:
Identification of an Energy Executive Board to set strategic guidance and provide active project support
Systematic integration of external technologies and expertise to leverage market and technology breakthroughs
Centralized project tracking and support to provide a single POC for all the activities held at Enterprise JBSA level
Functionally aligned Rapid Deployment Teams that make use of project replication opportunities within JBSA to ensure project benefits are leveraged to the fullest extent
Independent SIR/Proposal Teams that make use of statistical analysis and project delivery best practices to further leverage project benefits
Standardize project benefit calculations to include energy as well as operations related benefits thus boosting SIR competitiveness edge
Create an updated project and benefits repository that allow a continuous project progress and results information
Validate and aggregate results by applying standardized metrics
Creation and standardization of End-to-End processes that define the operations model
Integrate benchmarking information provided by industry databases
Involve external providers in Energy Conservation trends monitoring
Ensure continuous improvement by maintaining a closed performance monitoring loop that can sustain a permanent and concerted Energy Conservation effort
Develop and coordinate an overall Awareness Campaign
DOD Strategic Energy Management Guidelines
JBSA Energy Council Planning, Policy and Governance
Project Management, Audit Compliance and Reporting
Rapid Deployment
Teams
SIR Development / Contract Award
Coordination
Energy Subject Matter Experts and
Strategic Alliances
Energy Sources
& Delivery
Contracts &
Billing
Metering, Consumption
& Controls
Asset Tracking, Modernization and
Maintenance
Process Standardization
Technology Assessment
Environmental and Contingency Plan Integration
Awareness and Communications
Guiding Principles
& Methods
Resources
Macro Processes
FoundationElements
21
JBSA Energy Conservation Governance Model
Monthly Management Review Agenda Items
1) Review Performance Scorecard Project Status and Metrics
2) Consolidated JBSA Overall Trend of Actual Conservation attainment vs. Target
3) Project Identification and Implementation Pipeline Status and Cycle Time
4) Current Project that must be completed in current month and related issues
5) Deployment Team Replication Status
a. Actual vs. Target Implementation, b. Cycle Time Trendingc. Lessons Learned
6) Actual Project $Amount vs. Target, Projected Project Amount and Sources
7) % Stakeholder Analysis Action Plan Implemented
8) % Communications and Awareness Plan Implemented
9) Best Practice project identification for replication
10) Recognition and Awards
11) Commission New Projects
a. SIR and Scoring Model Analysis
12) Training Required
a. SOPsb. Whoc. Status % Complete
13) Contract $ Allocations and Preferred Status
14) Action Item Register status review / Next Steps & Owners / Next Meeting Date22
JBSA Energy Conservation Governance Model
Quarterly Management Review Agenda Items
On a quarterly basis, the Management Review will be expanded to focus on forecast for the upcoming 2-3 quarters. The additional agenda topics for the quarterly review will include:
1) Long term view of projects in the Project ID and Implementation pipeline
2) New projects for SIR and Scoring Model Assessment
3) Asset Audit Schedules and Compliance Status
4) Identification of Energy Hogs and Conservation Compliance Status
5) Energy Consumption Scorecards by structure
6) Equipment record /reliability Trend Analysis
7) Metering Deployment Schedule Compliance
8) Metering Reliability and Records Utilization
9) Productivity Project Status
10) Actual vs. Target Deployment and related Productivity Realization
11) New Projects and Priorities23
Figure 5.3: Consolidated Energy Conservation Scorecard
JBSA OEMP – MBTU Energy Actual Consumption vs. Standard Scorecard Example
JBSA Overall
• Largest Structure• …• …• Smallest structure
Fort Houston
• Largest Structure• …• …• Smallest structure
Lackland
• Largest Structure• …• …• Smallest structure
Randolph
• Largest Structure• …• …• Smallest Structure
Loc. Asset No. Sqr .Ft Category Baseline MBTUs Target MBTUs Actual MBTUs Metering Stage Owner
Figure 5.4: High Energy Consumption Scorecard
JBSA Energy Conservation Governance Model
A six step methodology will be used to help JBSA attain specific energy conservation goals in a timely and effective manner. The steps utilize a continuous process improvement framework to ensure JBSA actions are aligned with energy legislation, help enable and ensure the mission of JBSA and maintain a ongoing focus of rapid and effective project implementation.
The six steps of the methodology include:
1) Align Goals with Energy Conservation Legislation
2) Define Consumption Drivers and Measures
3) Define, Prioritize and Implement Conservation Reduction Opportunities
Utilize best practice tools and methods including SIR Analysis, Project Energy Scoring Models, Lean Six Sigma and Business Process Management to identify breakthrough projects
4) Implement Metering and Controls Infrastructure
5) Define and Implement Energy Contingency Plans
6) Implement Overarching Awareness and Environmental Integration Campaign
24
Roadmap Implementation Steps for Energy Mgt Plan Target Attainment
Define, Prioritize and Implement Conservation Reduction Opportunities - identify and evaluate Energy Improvement Projects (EIPS) based on SIR and other selection criteria in the Energy Project Scoring Model to attain 2015 Targets
Key tasks in this step include: define, document, train and maintain dedicated subject matter resource expertise in SIR analysis and business case preparation best practices.
Develop and deliver standard training modules to ensure that all energy managers (EMs) are current on funding sources and application guidelines.
Implementation of SIR / BIR Prep / Best Practice Teams
Utilize the Energy Project Scoring Model to evaluate the relative return of the projects based on actual and expected performance Define and maintain an aggregate listing of all projects by base, Savings Investment Ratio (SIR) intensity, project amount capital cost, implementation duration and resources as required in Form 1391.
Implement priority energy conservation projects using Rapid Deployment Teams to optimize lessons learned and implementation best practices for key project categories
25
Roadmap Implementation Steps for Energy Mgt Plan Target Attainment (S1-S3)
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
2003 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Axis Title
Axis Title
Cumulative Energy Savings Targets
Consumption Goal (MBTUs) Consumption (Actual or Projected)
Reduced Consumption (Two Year Cycle) Reduced Consumption (One Year Cycle)
26
Overview of Consumption, Targets and Gaps(modeling assumptions provided by JBSA EMs)
Define and Implement Metering Infrastructure Plan
Metering for high energy demand and/or critical energy grid security nodes is recommended. To gain full benefits of central control and feedback, meters should be configured to collect and send data to Energy Management Control Systems (EMCS), as well as receive commands through feedback loops (manual and automated) that enable energy conservation.
Key steps in the implementation plan include:
a) Define high consumption structures and critical security structures that require metering for electric, water and gas
b) Define connectivity standards and protocols
c) Define JBSA-wide contracts for connectivity, interoperability and volume based fees
d) Define properly skilled resources to be used for deployment
e) Finalize schedule and track deployment, testing and training
f) Verify controls are in place and in use via operational audits
g) Obtain timely billing verification of actual energy reduction from utility companies
27
Roadmap Implementation Steps for Energy Mgt Plan Target Attainment (S4)
Define and Implement Energy Contingency Plans
- Stand-up/ Integrate Security Planning and Energy Coordination
a) Key tasks with this step include:
a) Define contingency/back-up emergency energy requirements
b) Define sources of emergency capacity
c) Conduct supplier reviews to define energy and security operating procedures
d) Conduct Readiness Drills and Audits
28
Roadmap Implementation Steps for Energy Mgt Plan Target Attainment (S5)
Implement Overarching Awareness Campaigns – Conduct Stakeholder Information and Communication Plan Analysis.
Build Change Management into the overall Energy Conservation Project Plan consistent with the scale and scope of the Energy Program Transformation
A robust and comprehensive awareness program is recommended to ensure energy plan target attainment.
Items to consider when designing the plan include:
Determination of core messages, expectations and results
Stakeholder analysis and value propositions
Communication plans targeted for each stakeholder group
Recognition and incentives for compliance and exceptional attainment
Visibility of goals, and progress towards goals
29
Roadmap Implementation Steps for Energy Mgt Plan Target Attainment (S6)
Audience Medium PurposeTopics of discussion /
key messages Owner Frequency Notes/statusAggregate Base Command Viedo
Scorecard
SIAPRA Communication plan
“JBSA Saving Energy All Year Around”JBSA will be instituting a new energy conservation awareness campaign aimed at making all focus on energy and water conservation. JBSA will change by adjusting daily habits in small ways and conservation moves at the larger level.
Savings resulting from items as simple as turning off lights in rooms not occupied. Specifically, ways that will create savings include:
•Setting thermostats to 68°F in the winter and 76°F in the summer
•Identify and correct inordinate after-hours building energy consumption
•Each building set a 10 hour comfort time window
•Consolidate appliances like microwaves, refrigerators and coffee pots to central break room
•Prohibit space heaters
•Control exterior lighting to go off by 2200 hrs
•Follow year-round water conservation restrictions
•Repair leaky faucets
•Buy equipment that is Energy Star compliant
•Participate in the JBSA Recycling Programs
30
Roadmap Implementation Steps for Energy Mgt Plan Target Attainment (S6)
Energy Project Scoring Model
Energy Savings Unit of measure = MBTsCriteria Weight Value (CWV) = 35 of 100
Time to implement the energy project Unit of measure = monthsCWV = 5 of 100
Savings Investment Ratio (i.e. Return on Investment Ratio)Unit of measure = % of ROI / intensity value (note: intensity = MBTUs /square feet)CWV = 20 of 100
Environmental Impact Unit of measure = relative performance value for electrical, water and gas projectsCWV = 5 of 100
Cultural AwarenessUnit of measure = estimated number of individuals impacted directly by the projectsCWV = 10 of 100
Equipment MaintainabilityUnit of measure = relative performance value base reliability and ease of repair upon breakdownCWV = 10 of 100
Capability to Produce or Enable Renewable EnergyUnit of measure = relative performance value based on the projects ability to produce or enable energy production vs. renewable vs. non renewable or production capabilityCWV = 10 of 100
Rebates and Incentives that are associated with project implementationUnit of measure = relative performance value based on the projects ability to generate a range of tangible rebates. CWV = 5 of 100
Scoring Model Overview
Electric
Water
Gas
31
An example calculation of how the overall project score is calculated Duration (months) Energy Reduction SIR Environment Impact
Threshold Points Threshold Points Threshold Points Threshold Points
Assorted -Lighting, Controls,
Renewables, Water & HVAC
ESPC Projects 21 5 162,556 35 1 8 5 5
% 6% % 42% % 10% % 6%
Cultural Awareness MaintainabilityRenewable
Energy/Energy Production
Rebates and Incentives
Threshold Points Threshold Points Threshold Points Threshold Points Final Score
Assorted -Lighting, Controls,
Renewables, Water & HVAC
ESPC Projects 5000 10 10 10 5 5 5 5 83
% 12% % 12% % 6% % 6% 100%
Benefits of using the Energy Scoring Model
Compares projects based on a wide range of costs, schedule and performance criteria
Rank orders projects based on expected performance to enable priority selection
Helps users define the full expected impact of the project during its life cycle
Helps users focus on those projects that excel in any one of the selection criteria
Helps users identify potential gaps in project deployment capability, training and or scope definition.
32
Energy Project Scoring Model
Project Name ScoreAssorted - Lighting, Controls, Renewables, Water & HVAC 83
HVAC Modifications 83EMCS Control Upgrades 72
Motor System Modifications 64Repair EMCS System 63
Upgrade HVAC / HW lines, B 1415 62AFSO21 B395 Chilled Water Plant 61Repair Central Chiller Plant B991 60
Install Thermal Storage Energy Tank 59Reflective Roofs 56
Repair Chiller/ Lighting / DDC 55Repair Windows, Improve Energy Efficiency (Bldg 2000) 55Repair Heating Efficiency, Water, & HVAC multi-facilities 55
B498 CP/TES 55Repair HVAC Systems Multi Facilities 54
Randolph Photovoltaic Hangar 3 (SOLAR) 52Repair Chiller/ Cooling Tower 51
Repair HVAC, B 5725 51Install TES B395 51
Central Energy Plant Upgrade B1377 49Repair Energy Lighting and Envelope Multi-facilities 47
Rpr HVAC system, Tech Training, B 9225 47Repair (Retrofit) Warehouse lighting 47
Con B100 to Chilled Water Plant B395 47Replace High Bay Lighting Hangars 3,4,5,7,16,40,41, and B241 46
Project Name ScoreCooling System Modification 46Energy Improvements B144 46
Fire House bldg Net Zero (21 KW PV array) 46Lighting retrofit for B-4055 45
Re-Lamp Admin B3, 241, 75, 76 45Heating System Modification 45
Install Thermal Storage Energy Tank 45Repair Energy Chillers and HVAC Multi-facilities 44
Rpr/Mnt Base Chilled Water Loop 42Roadway and Parking Lot Lighting 40
Replace Boilers/ Lighting various Faculties 40Repair/ Replace Fan Coil Units In Chapel, B 10338 40
Radiant Barrier Windows 39Repair (Retrofit) Lighting 38
LED Airfield Lighting 38Repair Chilled Water System (B498) 38
Rpl 19 AF (B661) to Chill Water Sys (B498) 38Connect B663, B66, H62, H63 and H64 to Chiller Plant (B498) 38
Expand EMCS Base Wide 38Install Thermal Storage Energy Tank 37Install Thermal Storage Energy Tank 37Install Thermal Storage Energy Tank 37
Expand Recycled Water Ph 1 16Expand Recycled Water Ph 2 16
Sub-soil irrigation 14
33
Energy Project Scoring Model – Initial Rank Order
Project Pipeline Analysis – Initial StatusThe steps below represent the different phases in the implementation process:
Stage 1: Identified: Concept documented on a spreadsheet or in ACES—JBSA
Stage 2: Being Validated—AETC
Stage 3: Validated--AFCESAPlus Up List: If it shows up on the list, rename to “Validated”.
Stage 4a: Approved: Ready to Advertise—AFCESA
Stage 4b: Not Selected: Move between validated and approved. Add “Return to Installation”—AFCESA
Stage 5: Funded: Authority to Advertise—Air Force Headquarters (HAF)
Stage 6: Awarded to Contractor:--JBSA/Installation/Contracting Agent
Stage 7: Completed—Installation/Contractor/QAE
The graph below illustrates the current progress of slated projects through the implementation pipeline, as of the May Working Session at JBSA:
0
2
4
6
8
10
12
14
Identified NOT SELECTED
Being Validated
Approved Funded Awarded Completed
Num
ber o
f Pro
ject
s
Project Stage
Project Status for Energy Implementation
34
Distribution of projects in “Selection, Approval and Implementation Pipeline”
35
Projects highlighted in red have high MBTU savings potential and should be accelerated
Project Pipeline Analysis – Initial Status
To help determine the estimated times when intensity savings would be realized, per year, and based on the 12 to 24 month lead time identified in Table 1, we projected when JBSA would actually realize intensity savings for the current list of 54 projects.
Category Est Work Dur (month)
Est Work Dur + 6 Months (as per 5/10 meeting) Est Work Dur + 12 Months
Interior Lighting 3 9 21
Envelops / Insulation 6 12 24
Distribution 6 12 24
HVAC / Controls 9 15 27
Plumbing 9 15 27
Water Systems 9 15 27
Efficient Vehicles 3 9 27
TES 12 18 30
Metering 12 18 30
Central Plants 12 18 30
Recommissioning 12 18 30
Solar 15 21 33
Figure 11.1: Estimated Total Cycle Time from Project Identification to Completion by Project Categories
Project Pipeline Analysis – Current Cycle Times
Strategy Set Outline
Alternative Work Methods
Improve energy maintenance practices to include proper
systems and training. Potential TAMU training.
Standardize the structure and number of resources for rapid
deployment teams across all bases
Change Chain of
Command for Energy
and/or Outsource /
Shared Services
Operations Rapid
Deployment Team.
Include checklist from DoE
CD.
JBSA CPS Energy Strategy
Partnership
Technical Rapid
Deployment Team
Schedule CPU shutdowns at designated intervals (ie: 4x per
week)
Alternative work schedule (telework, etc)
Incentives and Awareness
Reinforce energy incentives for managers at all levels
(horizontal chain of command and tenants). Include energy in
command performance appraisal to contribute or take
away from annual pay.
Demand reduction for entire year. Shut down
during peak times to reduce load at times
when power is the most expensive.
Implement quarterly energy
conservation awards program
Recirculateproject
savings, incentives, and rebates back
into the energy savings project
pool
Establish bonus pool at the end of the
year
Next Best Tier of High Energy
Projects Strategy
Define and Implement Individual Room Energy Saving Devices (ie: devices against vampire
energy)
Implement inflector window insulating material across all
bases to target buildings (historical buildings in
particular)
Add projects that are non-electric and
non-photovoltaic
Chill Water Plant Energy
Reduction
Implement Phase One of Photovoltaic
Farm
Utilize occupancy
sensors strips for peripheral
devices
MBTU Calculations
Must account for all new construction square feet and
include temporary square feet/Real Property Scrub/Trailers estimated to be 62,000 sq feet in
Randolph
Include all building new construction and major
renovations.
Benchmark biomass
energy savings for JBSA
Technology
Eliminate Total Energy Plant (Gas) from Wilford Hall and
replace with energy or invest in minimizing that occurs in gas system (estimated to be 50%)
Cool roofs as part of standard roof repair projects. Roof IDIQ.
ContractsConduct review of contracts from ESPC COR program
MeteringInstall Controls Across All Major
SystemsNo Cost
ConstraintsReplicate Best Energy Across All
Bases
37
Alternative Strategies to Meet Energy Conservation Goals
Land
Solar x
ELECTRICGRID
Internal Consumption
MBTUsTo GRID
MBTUs
JBSA DEMAND
Lackland
Randolph
FSH
x
% MBTUs
MBTUs Returned
Rebates,Incentives& Other
CPSExternal Customers
Implementation Process Overview
LandUse
Strategy/Ts & Cs
Contractor Selection
Construction Turn-on Production Consumption Payment& Billing
Sunset
Operations & Maintenance
Supplier Management & Support
Governance
Information Integration, Controls, Reporting, Workflow and Dashboards
Solar Panel Project - Strategy Definition and Planning DiagramsInformation Requirements
Plan Description
Demand•Current•Future
Capacity•Current•Future
Key interfaces
Cost•O&M•Other
Supply Plan
Business Case / ROI
Process Capability
Land Ownership
Equipment Ownership
Process Ownership
Timing issues
Other
Notional Illustration of Solar Panel Working Model
Draft / Notional Only – Not for distribution
38
Additional Opportunities – Solar
Solar Panel Energy Savings & Cost Models
Solar panels - for one small, medium and/or large structure or home. These PV applications would be evaluated to determine the percent of alternative energy, actual cost and overall decrease in the consumption footprint in water, gas and electric applications that single families could expect to harness in the JBSA region.
Estimated cost of these installations would be approximately $25k - $40k based on home size and application. It should be noted that purchase and implementation costs for projects in this area, as well as others, are subject to significant savings based on volume cost discounts.
Larger scale projects must be defined and scoped for full impact via Strategy Definition and Planning Diagrams. These will ensure the full end-to-end process issues are addressed and evaluated on a standard basis
The key elements of expected return on these projects include reduced demand on existing utility sources, independent back-up energy capability and overall contingency plan enablement.
Note that tax and rebate incentives must be evaluated for government applications.
Appendix E. High Square Footage – Potentially High Consumption Structures or “Energy Hogs”
Top 50% of Square Feet by
Building Category
Aggregated Square Feet within each
Building Type
Number of Buildings in
Building Category
7115 Report Listing of
Largest Square Footage
Structures
Top 50% of Square Feet by Building Category(ie: 46M Sq. Ft out of 92M Sq. Ft)
AUTO FR DETC 27%
CLSD HD A/SPRINKLER 24%
HTG FR CEN PLT 12%
A/C FM CEN PLANT 11%
WHSE SUP EQUIP DEP 10%
HT GAS SOURCE9%
DORM RECRUITS7%
Aggregated Square Feet within each Building Type
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
Building Type
Squa
re F
eet
39
Macro Energy Conservation Project Plan:
All key tasks of the energy roadmap will be formulated into a project plan that clearly identifies key tasks, owners, start, stops and interdependencies.
Standing Management Reviews will also be indicated in the overall plans.
The plans will extend to the full life of the time horizon of the energy goal. Figure 8.4 illustrates a macro level Gantt chart / project plan that will be maintained at the aggregate and base level.
These plans will be part of the standard documentation used in Management Reviews.
1. Define Energy Conservation Legislative Guidance
2. Establish JBSA Energy & Environmental Governance Steering Committee
3. Align JBSA Goals and Base Targets with Legislative Guidance
4. Define JBSA Conservation Drivers and Measures
5. Define and Prioritize Energy Conservation Improvement Projects (CPIS)
i. Implement SIR Best Practices
ii. Score and Select CIPs
iii. Identify and Implement Productivity Improvement Projects
6. Implement Conservation Improvement Projects
7. Implement Metering and Controls Infrastructure
8. Implement Overarching Awareness Campaigns
JBSA Operational Energy Management Plan – MBTU Program Milestones
1Q 2Q 3Q 4Q 2012+ Status
Legend: Complete = C Pending = P Underway = U Attention Required = AR
C
P
U
U
U
P
U
AR
U
AR
AR
= OEMP Kick-off
40
Proposed Next Steps
Appendix Slides
41
Figure 5.3: Consolidated Energy Conservation Scorecard
42
Version 16-Jun-11
Stakeholder name/group
Target Stakeholder Impact on Project (H=9 (Driver), M= 5 (Engaged
and Doing), L = < 3(Occasional
Engagement )supportive)
Stakeholder level of influence on success
of project (h,m,l)
Current Level of information provided to
Stakeholder to make proper decesions
(+,o,-) (3,1,-3)
Current Level of Action Taken on the
information provided (+,o,-) (3,1,-3)
Cummulative Stakeholder Score (H=9, M=3, L=<3,
Information Gap From
Target Action plan for stakeholder
Aggregate Base Command 9 3 1 1 5 4Use new scorecards, goverance and communication
plans
Energy Steering Committee 9 3 1 1 5 4Use new scorecards, goverance and communication
plans
Individual Base Command 9 3 1 1 5 4Use new scorecards, goverance and communication
plans
Energy Managers / SME 8 3 2 1 6 2Implement standardizex use of Asset Mgt and
workorder systems. Use rapid Deployment Teams
Energy Technicians 8 3 1 1 5 3Implement standardizex use of Asset Mgt and
workorder systems. Use rapid Deployment Teams
Utility Company 6 2 1 1 4 2Implement Electronic Billing Capability and Issue
Indiviudual Meter Scorecards
Contractors 5 2 1 1 4 1Log energy consumption units to be accounted for
during project constructionGovernment Officials 5 2 1 1 4 1 Promote JBSA and Utility Company Programs
Schools 5 2 1 1 4 1
Adopt the "You've got the Power" campaign and help our households attaine A's and B's on Metering
Scoecards
Base Families 5 2 1 1 4 1
Adopt the "You've got the Power" campaign and help our households attaine A's and B's on Metering
Scoecards
DOE 4 1 1 1 3 1
Modify accounting rules to allow for next year or "receipt based" savings. Expand measures to account
for restoration facilities, new construction and "building traffic" vs only square footage based
measures
DOD / Departments 4 1 1 1 3 1
Modify accounting rules to allow for next year or "document based" savings. Define energy rules for historic buildings. Enhance & conduct IA audits on
asset systems for user-friendly enegy reporting
Stakeholder Information and Action Plan Risk Analysis (SIAPRA)
43
Stakeholder Information Action Plan Analysis
JBSA OEMP – MBTU Energy Actual Consumption vs. Standard Scorecard Example
JBSA Overall
• Largest Structure• …• …• Smallest structure
Fort Houston
• Largest Structure• …• …• Smallest structure
Lackland
• Largest Structure• …• …• Smallest structure
Randolph
• Largest Structure• …• …• Smallest Structure
Loc. Asset No. Sqr .Ft Category Baseline MBTUs Target MBTUs Actual MBTUs Metering Stage Owner
Figure 5.4: High Energy Consumption Scorecard
44
45
7115 Report Listing of Largest Square Footage Structures
46
Provide Project Management Support to JBSA to complete the following:
1. Construct an Energy Strategic Management Plan to enable the application and receipt of funding ($250M)that ties all of the JBSA activity to EO, legislation, QDR, OSD policy, etc. down to the objectives, activities and metrics being reported :
a. Energy Strategic Management Plan will incorporate and show clear linkages to DOD Leadership guidance and include Goals, Objectives, Projects/Tasks planned to achieve plan
b. Construction of Energy metrics that are reported by month (as lagging indicators) to serve as leading indicators by quarter. Metrics should reflect :
I. Activity and effort underway to achieve goals, objectives, and tasks, that will properly indicate starting point baseline, progress trend, milestone way points, and target level
II. Energy (electric, mogas, and natural gas/propane) consumption rate
III. Water consumption rate
2. Construct JBSA -wide project plans that will connect the vast amount of ESMP activity, enable visibility and drive execution. Risk Analysis, Cost Management and Results Sustainability will be conducted as a follow on effort.
a. Meter Installation Plan b. Metrics / Measures and Reporting
c. Asset Identification & Replacement Mgt. d. Capital / Savings Investment Ratio Analysis
e. New Construction / Renovation Project Planning f. Marketing and Education Plan
JBSA Energy Strategic Management Plan - Proposal Deliverables – 1Q Notes
- BLUF -
46
Strategy Drivers PriorityExecutive Order 1Congressional Acts 2National Security 3QDR 4SMP 5Interagency 6JBSA 7Benchmarks 8
Comprehensive Project Listing1. Completed ‘092. Awarded ‘103. Approved 4/104. Being Valuated 11/105. Identified TBD6. Test / Partner TBD
Evaluation /Funding CriteriaECIP 1 FY11ECIP 2 FY12ECIP 3 FY13SRMMilcon
Energy/Conservation Group1. Reduce Consumption2. Increase Capacity3. Renewable Energy4. Risk, Security & Contingency
Strategy Framework
Framework Strategy Drivers/Goals: EO I Congress I QDR I SMP
Targets & Timing: Ex: % Reductions
JBSA Application of Strategy Drivers: Gen Patrick 6
Process Owners: Who will implement
Task Required to Achieve Strategy
Outcome Measures (Ys)
Projects aligned to Goals
Leads and Resources
Control Measures (Xs): Do these things to achieve Ys
Authoritative Data Sources
Other
Project Tracking Data SheetsForm 1391 Data FieldsAdditional Evaluation Criteria
E&C SMP Document: Categories of Content
1. Vision
2. Goals
3. Scope
4. Benefits and Costs
5. Budget and Resources
6. Project Governance
7. Roles & Standard Operation Procedures
8. Measures
9. Market & Communications
10. Culture Change & Education
11. Timeline for Plan Implementation
12. Appendix
JBSA Energy & Conservation Strategic Management Plan: Process Overview & Deliverables Target
2011 - 2013E
&C
SM
P T
ask
Pla
n47
47
Year MBTUs Begin to be Realized 2011 2012 2013 2014 2015
MBTUs Saved by Projects
2009 179,620 179,620 179,620 179,620 179,620
2010 34,385 34,385 34,385 34,385
2011 88,690 88,690 88,690
2012 62,246 62,246
2013 0
Total MBTUs Saved by Current Projects 179,620 214,005 302,694 364,940 364,940
MBTUs Above Target 702,478 811,777 921,076 1,030,375 1,139,674
Total MBTUs Remaining Short of Target (MBTUs Above Target –MBTUs Saved)
522,858 597,772 618,382 665,435 774,734
Analysis of Current Projects in Original SEMP Identified by Energy Managers through April 2011
Year MBTUs Begin to be Realized 2012 2013 2014 2015
MBTUs Saved by Projects
No Fiscal Year Given
878,701 878,701 878,701
2010 49,140 49,140 49,140 49,140
2011 202,949 202,949 202,949
2012 705,160 705,160
2013 100,000
Total MBTUs Saved by Current Projects 49,140 1,130,790 1,835,950 1,935,950
MBTUs Above Target 811,777 921,076 1,030,375 1,139,674
Total MBTUs RemainingShort of Target (MBTUs Above Target –MBTUs Saved)
762,637 -209,714 -805,576 -796,277
MBTUs Saved by New Projects Alone (Identified in May Working Session and Listed Below)
48
Overview of Consumption, Targets and Gaps(modeling assumptions provided by JBSA EMs)
Year MBTUs Begin to be Realized 2011 2012 2013 2014 2015
MBTUs Saved by Projects
2009** 179,620 179,620 1,058,321 1,058,321 1,058,321
2010 83,525 83,525 83,525 83,525
2011 291,639 291,639 291,639
2012 767,406 767,406
2013 100,000
**No Fiscal Year Given projects have been added to begin being realized in 2013
Total MBTUs Saved by Current Projects 179,620 263,145 1,433,484 2,200,890 2,300,890
MBTUs Above Target 702,478 811,777 921,076 1,030,375 1,139,674
Total MBTUs Remaining Short of Target (MBTUs Above Target –MBTUs Saved)
522,858 548,632 -512,408 -1,170,516 -1,161,217
MBTUs Saved by New Projects and Current Projects Combined
49
Overview of Consumption, Targets and Gaps(modeling assumptions provided by JBSA EMs)
Based on the 2003 baseline and current base square footage, JBSA must
consume no more than 2,550,309 MBTUs in 2015 in order to be compliant
with the energy conservation target. This target represents a 3% savings
each year from its 2003 baseline through 2015. JBSA is currently projected
to consume 3,689,983 MBTUs in 2015, which means JBSA must reduce
consumption by 1,139,674 MBTUs by 2015 to meet the goal. Currently
slated projects are estimated to reduce energy consumption by 334,023
and new strategies that have been developed amount to an additional
1,935,950 MBTUs reduction in energy consumption. Base Command
Steering Committees and Energy Working Teams will conduct the necessary
project prioritization, selection funding and implementation using a standardized
roadmap to reach JBSA objectives, communicate & recognize best practices
and drive continuous energy process improvement. 50
Opportunity Statement / Context Need for the OEMP