1 2 3 4 5 6 - Sheridan Collegetrantor.sheridanc.on.ca/student/sincmegh/Images... · 2015-08-13 ·...

4
DN UP UP 1850 3325 3634 2260 1380 2260 1200 270 TYP. 3100 2900 7573 1309 TYP. 2750 TYP. 30000 750 TYP. 750 TYP. Firerating Linetypes 1 hour 45 min OBC 3.2.2.50 2(d) OBC 3.5.3.1 (1) OBC 3.1.1.20 OBC 3.2.2.50 2(d) OBC 3.4.4.1(1) OBC 3.3.1.1 (1) OBC 3.3.1.1 (1) UP DN Typical Stair Tread: 270mm Rise: 200mm Tim Hortons Storage Office Travel Agent Store Front Elevator Elevator Bertazzoni Office Return 1 2 3 4 5 6 A B C D E F 1 A302 P1 P1 P1 P1 P1 P7 P7 P7 P7 P7 P6 P9 P9 P6 P7 P9 P6 P7 P6 P8 P10 P8 P8 P6 P9 P9 P9 P6 P6 P7 P6 P6 P9 P9 P6 P9 P9 P7 P7 P9 P6 P6 P6 P6 P7 P7 P7 P7 P2 1 A301 VESTIBULE 1 CORRIDOR 2 VESTIBULE 3 Photocopy Office 9 Woman's WR 10 Men's WR 11 Storage 12 Office 13 Kitchen 14 Cafe 15 Janitor's Closet 16 Government Passport Office 17 Processing 18 Storage 19 Office 20 Office 21 Office 22 Storage 23 Travel Agent 24 Security 25 Security Office 26 8 A501 7 A501 5 A501 1322 2000 1300 2000 1000 2000 1400 2000 2500 2000 632 1968 4548 2525 2000 5701 915 480 715 1495 801 994 2000 4223 2000 823 723 2000 2400 2000 3563 1000 6400 2000 1400 2000 1185 723 2000 2963 2000 2355 800 1495 715 7798 2000 1823 DS1B DS1C D110 D116 D111 D109 D113 D114 D115 D117 D125 D124 D121 D122 D118 D119 D120 D126 D123 D103 D102-b D101 D102-a DS1A 19 19 19 19 19 19 19 19 19 19 19 18 19 19 19 19 19 2422 915 908 915 530 3879 853 915 185 3592 3879 2132 9008 1051 915 187 3554 3273 915 585 915 2867 3682 152 915 4586 4140 487 915 2915 789 915 3507 2132 4373 4067 187 915 2270 915 87 2282 2862 4374 2467 915 1329 915 8558 915 2036 2122 915 485 915 4686 391 D112 5111 915 187 1528 3857 2061 3222 3857 130 915 4353 2024 2144 1167 129 1830 4555 130 915 4353 3726 386 1691 915 187 3114 915 405 915 1908 915 3102 3069 755 1056 1881 3612 1917 2000 1546 1546 1989 2023 1574 1891 1056 1105 3314 7323 1661 Return Supply Elevator Shaft 2632 2023 Scale Checked by Drawn by Date Project number General Notes: 1. Verify all dimensions prior to construction. 2. Do not scale drawings. Use written dimensions 3. Use only latest revised drawings. 4. Report any errors or omissions to the Architect or Design Engineer as applicable 1 : 100 05/08/2015 5:01:28 PM C:\Users\Meghan\Documents\SEMESTER 4\STUDIO\Final Submission\Bertazzoni Final Studio Submission.rvt First Floor 2014-005 Bertazzoni HQ Bertazzoni Appliances July 22, 2014 VP JP JS MS A101 1 : 100 First Level 1 No. Description Date

Transcript of 1 2 3 4 5 6 - Sheridan Collegetrantor.sheridanc.on.ca/student/sincmegh/Images... · 2015-08-13 ·...

Page 1: 1 2 3 4 5 6 - Sheridan Collegetrantor.sheridanc.on.ca/student/sincmegh/Images... · 2015-08-13 · Project number General Notes: 1. ... Bertazzoni HQ Bertazzoni Appliances July 22,

XXxxxx( xxx) - x xx -

xxxxXXxx m m ddyyyy

x x-xx

XX

xxxx.xxx

XX

xx

Hw y #401

H u ron ta rio St.

Maritz Dr.

B ritanni a R d. E.

C ou rtneypark D r. W .

C ou rtneypa rk D r. E .Am bassador D r.

S upe riorB lvd.

Anna gem Blvd.E dw ard s Blvd.

P end ant Dr.

F oster C res.Ca ntay Rd.

CITY

O FM ISSISSAUG ASITE 100.70100.416B.O.C100.565T.O.C100.675T.O.C100.525B.O.C

100.700B.O.C100.850T.O.C100.700B.O.C100.850T.O.C100.700B.O.C100.850T.O.C100.650B.O.C100.800T.O.C100.700B.O.C100.850T.O.C

100.700B.O.C100.850T.O.C100.650B.O.C100.800T.O.C

100.530T.O.C100.680B.O.C100.47B.O.C100.62T.O.C100.620T.O.C100.470B.O.C100.525B.O.C100.675T.O.C

100.850T.O.C100.70B.O.C

100.35 100.35

100.75100.60B.O.C100.500B.O.CCU RB FLU SH

W / AS PHA LT100.500B.O.CCU RB FINISH

W / AS PHA LT100.550B.O.C100.700T.O.C100.550B.O.C100.700T.O.CT.O.C 100.75100.60B.O.CT.O.C100.565T.O.C100.410B.O.C100.480B.O.C100.630T.O.C

CU RB FLU SH

W / AS PHA LT

1.2%

1.1% 1%

1%1%

1.2%

1.3% 1%

1%

1.5%

1.5%

1.5%

HIG H PO INT

100.70100.416B.O.C100.565T.O.C100.675T.O.C100.525B.O.C

100.700B.O.C100.850T.O.C100.700B.O.C100.850T.O.C100.700B.O.C100.850T.O.C100.650B.O.C100.800T.O.C100.700B.O.C100.850T.O.C

100.700B.O.C100.850T.O.C100.650B.O.C100.800T.O.C

100.530T.O.C100.680B.O.C100.47B.O.C100.62T.O.C100.620T.O.C100.470B.O.C100.525B.O.C100.675T.O.C

100.850T.O.C100.70B.O.C

100.35 100.35

100.75100.60B.O.C100.500B.O.CCU RB FLU SH

W / AS PHA LT100.500B.O.C CU RB FINISH

W / AS PHA LT100.550B.O.C100.700T.O.C

100.550B.O.C100.700T.O.CT.O.C 100.75100.60B.O.CT.O.C

100.565T.O.C100.410B.O.C100.480B.O.C100.630T.O.C

CU RB FLU SH

W / AS PHA LT

1.2%

1.1% 1%

1%1%

1.2%

1.3% 1%

1%

1.5%

1.5%

1.5%

HIG H PO INT

N40°35'10"E (146.163m )

N44°17'20"W (53.735m

)

N 2°03'50"W (21.982m )

N40°10'00"E (66.823m

N44°22'30"W (71.572m

)

VACANTINDUSTRIAL / O FFICE USEH-E1-12

INDUSTR

IAL / O

FFICE USE

E1-2

P ropos ed BuildingG ross Floor Area: 625 m ² Building Area: 2 ,725.5m ²FFE: 100.80

FIRE ROUTE

12930150107106

128

8259

129

FIRE RO UTE

FIRE RO UTE

FIRE ROUTE

M UNICIPAL SIDEW ALK4.5 M SETBACK & LANDSCAPE BUFFER ZO NE

4.5 M SETBACK

3.0 M L

ANDSCA

PE BUFFER Z

ONE

4.5 M LANDSCAPE BUFFER ZO NEPRO PERTY LINE

4.5 M SETB

ACK

LO ADING SPACE4344 58

83M AIN ENTRANCE

AS PHA LTAS PHA LTAS PHA LT

AS PHA LT

AS PHA LTAS PHA LT

AS PHA LTAS PHA LT

PEDESTRIAN WALKW

AY

N40°35'10"E (146.163m )

N44°17'20"W (53.735m

)

N 2°03'50"W (21.982m )N40°10'00"E (66.823m

N44°22'30"W (71.572m

)

VACANTINDUSTRIAL / O FFICE USEH-E1-12

INDUSTR

IAL / O

FFICE USE

E1-2

P ropos ed BuildingG ross Floor Area: 625 m ² Building Area: 2 ,725.5m ²FFE: 100.80

FIRE ROUTE

12930150107106

128

8259

129

FIRE RO UTE

FIRE RO UTE

FIRE ROUTE

M UNICIPAL SIDEW ALK4.5 M SETBACK & LANDSCAPE BUFFER ZO NE

4.5 M SETBACK

3.0 M L

ANDSCA

PE BUFFER Z

ONE

4.5 M LANDSCAPE BUFFER ZO NEPRO PERTY LINE

4.5 M SETB

ACK

LO ADING SPACE4344 5883

M AIN ENTRANCE

AS PHA LTAS PHA LTAS PHA LT

AS PHA LT

AS PHA LTAS PHA LT

AS PHA LTAS PHA LT

PEDESTRIAN WALKW

AY

6.00m

4.50m

6.00m

2.80m

6.00m6.00m

6.00m

7.00m7.00m

7.00m

6.00m

25.00m

25.00m

R12 .00m

R1 2.00 mR1 2.00 m

9.00m

3.50m10.14m

6.00m

4.50m

6.00m

2.80m

6.00m6.00m

6.00m

7.00m7.00m

7.00m

6.00m25.00m

25.00m

R12 .00m

R1 2.00 mR1 2.00 m

9.00m

3.50m10.14m

Z O NING TABLE STATISTICS

ZO NE 44-E:E1-8ITEMREQ UIREM ENTPRO VIDEDFRO NT YARD SETBACK 4.5 M4.5 MS IDE YARD SETBACK 4.5 M4.5 MR EAR YARD SETBACKS 4.5 M4.5 ML ANDSCAPE BUFFER

ZO NE

4.5m O N FRO NT& SIDE

3m INTERIO RS

4.5m O N FRO NT& SIDE

3m INTERIO RS

LO T M²

N/A

9,674.14m²BUILDING M² M AX AREA FACING 3STREETS: 5400 M ² 625 m²

BUILDING CO VERAG E % N/A6%

LANDSCAPE AREA M ²30% M IN LO T AREA (2,902 m ²)

3,826 m²

LANDSCAPE AREA %30% M IN40%

PAVED AREA M ²

N/A

5,223.14 m²

PAVED AREA % N/A54%# O F PARKING SPACES

5.4 SPACES PER 100M ²(147)

150

# O F ACCESSIBLE

PARKING SPACE

TO TAL NO . O F SPACES

REQ UIRED: 101-150 = 5SPACES M IN

6 SPACESLO ADING SPACE AS PER TABLE 3.1.4.2

1 LO ADING SPACE REQ .

1

O .B.C. REQ UIREM ENTSCLASSIFICATIO N DO BC CO DE 3.2.2.50AREA3 STREETS: 5400 M ²HEIG HTUP TO 6 STO RIES

FIRE SEPARATIO N 1h- BETW EEN D & E: 0SPRINKLERS NOCO NSTRUCTIO NNO N- CO M BUSTIBLETYPICAL PARKING LO T DIM ENSIO NSB ARRIER FREE SPACE 2.8 X 6 M

BARRIER FREE PARKING SPACE 4.5 X 6 MLO ADING SPACE 3.5 X 9 MPEDESTRIAN W ALKW AY1.2 MSPACE BETW EEN PARKING RO W S7 MM INIM UM CURB RADIUS 4 MFIRE PRO VISIO NS

E NTRANCE/ EXITSIAM ESE CO NNECTIO NFIRE HYDRANT

N38°44'00"E (64.70m )

N44°22'30"W (14.50m

)

N38°44'00"E (64.70m )

N44°22'30"W (14.50m

)

H U R O

N T A R I O

S T R E

E T

CO URTNEY PARK

H U R O

N T A R I O

S T R E

E T

CO URTNEY PARK

ISO A1 TITLE BLOCK

N

N

Zero G ravityD esignsIndustrial,C o mm ercial,R esidentialD esigns

sheettitle:Scale:FileN ame:

SheetN um ber:

D raw nB y:

C heckedB y:

Pro jectN o:D ateD rawn:

Pro ject:

C lientInfo rm atio n:

C o mpanyLo go :

A rchitect'sSeal:

C o nstructio n

N o rth

True

N o rth

N um berD ateD escriptio n

G eneralN o tes:1 . Ver ify alldim ensio ns

prio r toco nstructio n.2. D o no t scale

draw ings.U se w rittendim ensio ns.

3 . U se o nly latestr eviseddraw ings.4. R epo rt anyerro rs o ro m issions to

theA rchitect o rD esignE ngine er asa pplic able.

N

DN UPUP

1850

3325

3634

2260

1380

2260

1200

270 TYP.

3100

2900

7573

1309 TYP.

2750 TYP.

30000

750 TYP.

750 TYP.

Firerating Linetypes1 hour45 min

OBC 3.2.2.50 2(d)OBC 3.5.3.1 (1)

OBC 3.1.1.20

OBC 3.2.2.50 2(d)

OBC 3.4.4.1(1)

OBC 3.3.1.1 (1)

OBC 3.3.1.1 (1)

UPDN

Typical StairTread: 270mmRise: 200mm

Tim Hortons

Storage

Office

Travel Agent

Store Front

ElevatorElevatorBertazzoni

Office

Return

1 2 3 4 5 6

A

B

C

D

E

F

1

A302

P1

P1

P1

P1

P1

P7 P7

P7

P7

P7

P6

P9

P9P6P7

P9

P6

P7

P6

P8 P10P8 P8

P6P9

P9

P9

P6

P6

P7P6

P6

P9 P9

P6 P9P9

P7

P7P9

P6

P6

P6

P6

P7

P7

P7P7

P2

1

A301VESTIBULE

1

CORRIDOR

2 VESTIBULE

3

Photocopy Office

9

Woman's WR

10Men's WR

11

Storage

12

Office

13

Kitchen

14

Cafe

15

Janitor's Closet

16

Government PassportOffice

17

Processing

18

Storage

19

Office

20

Office

21 Office

22Storage

23

Travel Agent

24

Security

25

Security Office

26

8A501

7A501

5A501

1322 2000 1300 2000 1000 2000 1400 2000 2500 2000 632 1968 4548

2525

2000

5701

915

480

715

1495

801

994

2000

4223

2000

823

723 2000 2400 2000 3563 1000 6400 2000 1400 2000 1185

723

2000

2963

2000

2355

800

1495

715

7798

2000

1823

DS1B DS1C

D110 D116 D111

D109

D113

D114

D115

D117D125 D124

D121 D122

D118D119

D120

D126

D123

D103D102-bD101 D102-a

DS1A

19 19 19 191919

19

19

19

19 19

18

19 19

19

19

19

2422

915

908

915

530

3879 853

915

185

3592

3879

2132

9008

1051 915 187 3554

3273 915 585 915 2867

3682

152

915

4586

4140 487 915 2915

789

915

3507

2132

4373

4067

187 915 2270 915 87

2282

2862

4374

2467 915 1329 915 8558 915 2036

2122

915

485

915

4686

391

D112

5111 915 187 1528

3857

2061

3222

3857

130

915

4353

20242144 1167

1291830 4555

130

915

4353

3726

386

1691 915 187 3114 915 405 915 1908 915 3102 3069

755 1056 18813612

1917

20001546

1546

1989

2023

1574

1891 1056 1105

3314

7323

1661

ReturnSupply

Elevator Shaft

2632

2023

Scale

Checked by

Drawn by

Date

Project number

General Notes:

1. Verify all dimensions prior to construction.

2. Do not scale drawings. Use written dimensions

3. Use only latest revised drawings.

4. Report any errors or omissions to the Architect or Design Engineer as applicable

1 : 100

05/0

8/20

15 5

:01:

28 P

M

C:\Users\Meghan\Documents\SEMESTER 4\STUDIO\Final Submission\Bertazzoni Final Studio Submission.rvt

First Floor

2014-005

Bertazzoni HQ

BertazzoniAppliances

July 22, 2014

VP

JP JS MS

A101 1 : 100First Level

1

No. Description Date

Page 2: 1 2 3 4 5 6 - Sheridan Collegetrantor.sheridanc.on.ca/student/sincmegh/Images... · 2015-08-13 · Project number General Notes: 1. ... Bertazzoni HQ Bertazzoni Appliances July 22,

DNUP

DNUPUP

1 2 3 4 5 6

A

B

C

D

E

F

1

A302

P3 P3

P3

P3

P3

P3

P3

P3

P6P7

P7

P6

P7

P6P6

P6 P6P7

P8

P6

P6

P10

P6

P6

P9

P10P8

P8

P7 P6

1

A301 Circulation

4

Office

5

Office

6 Office

28

Womens Bathroom

29

Storage

30

Office

31

Office

32

Office

33

Meeting Room

34

Meeting Room

35Meeting Room

36

Meeting Room

37

Office

38Office

39

Storage

40

Circulation

41

Mens Bathroom

42 Circulation

43

Storage

44Meeting Room

45

Office

46

Office

47

Secretary

48

Lobby

49Supply Room

50

Office

51

Office

52

Office

53

Office

54Meeting Room

55

Office

56

Studio

57

Janitors Closet

58

Circulation

59

30168

1382 6689 4300 7600 6776 3422

1282

1400

603

1540

1400

8619

2636

5638

2493

1237

3016

8

2825

7300

9000

7300

2825

2825 7300 9000 7300 2825

30168

5404 6000 4921 68227022

2963

7090

1087

137

0324

22

3016

8

3122

DS2B DS2A

D251

D252 D253

D254 D255

D256

D245D246D247D248D249B

D249A

D244

D205D233

D231D232

D230D235

D234

D236D240

D237

D239 D238

D228D206

D241 D243D229D242 D258

19 19

18

18

18

18

18

18

18

18

1918 19 19 19

19

19

18

18

Scale

Checked by

Drawn by

Date

Project number

General Notes:

1. Verify all dimensions prior to construction.

2. Do not scale drawings. Use written dimensions

3. Use only latest revised drawings.

4. Report any errors or omissions to the Architect or Design Engineer as applicable

1 : 100

05/0

8/20

15 5

:01:

31 P

M

C:\Users\Meghan\Documents\SEMESTER 4\STUDIO\Final Submission\Bertazzoni Final Studio Submission.rvt

Second Floor

2014-005

Bertazzoni HQ

BertazzoniAppliances

July 22, 2014

JS

VP JP MS

A102

1 : 100Second Level

1

No. Description Date

Page 3: 1 2 3 4 5 6 - Sheridan Collegetrantor.sheridanc.on.ca/student/sincmegh/Images... · 2015-08-13 · Project number General Notes: 1. ... Bertazzoni HQ Bertazzoni Appliances July 22,

Ground0

First Level101

Second Level4101

Third Level8101

Fourth Level12101

Top of Steel16101

ABCDEF

1A301

Roof Access20101

1A401

2A401

FF Second Level4301

FF Third Level

8301

1A303

FF Fourth Level12316

FF Roof Access

16456

VESTIBULE

3

Circulation

4

Office

5

CORRIDOR

61

WORK SPACE

72

P7 P7P7

P3P3

P1P1

P3

P3

P4

P6P9

P9 P9 P9

P6P9P9P9

P8 P6

P3

P5 P5

P3

SHOW ROOM

60

Studio

57

Storage

23

Cafe

15

Office

31

Circulation

43

Storage

30

OFFICE

67

SECRETARY

67.

Meeting Room

81

Meeting Room

80Office

79

DS2A

DS1C

DS3B

DS4BD412D411D410

D367-BD367-A

D230

D114 D123D102-b

DR1

19

3645

355

3785

215

3800

200

3800

200

4000

101

2825 7300 9000 7300 2825

Scale

Checked by

Drawn by

Date

Project number

General Notes:

1. Verify all dimensions prior to construction.

2. Do not scale drawings. Use written dimensions

3. Use only latest revised drawings.

4. Report any errors or omissions to the Architect or Design Engineer as applicable

1 : 75

05/0

8/20

15 5

:01:

38 P

M

C:\Users\Meghan\Documents\SEMESTER 4\STUDIO\Final Submission\Bertazzoni Final Studio Submission.rvt

NS BuildingSection

2014-005

Bertazzoni HQ

BertazzoniAppliances

July 22, 2014

JS

JP, MS, VP

A302

1 : 75NS Wall Section

1

No. Description Date

Page 4: 1 2 3 4 5 6 - Sheridan Collegetrantor.sheridanc.on.ca/student/sincmegh/Images... · 2015-08-13 · Project number General Notes: 1. ... Bertazzoni HQ Bertazzoni Appliances July 22,

Ground

0

First Level

101

Second Level4101

Third Level8101

Fourth Level

12101

Top of Steel

16101

5 6

T/O Footing

-3000

FF Second Level

4301

FF Third Level

8301

FF Fourth Level

12316

FF Roof Access

16456

P4

VESTIBULE

CORRIDOR

METAL ARCHITECTURALFEATURE

OFFICE

CORRIDOR

ROOF

P6

4A501

4200

4000

4015

4140

3101

3000

101

4000

4000

4000

4000

P3

P4

P4

P4

P3

Ground

0

First Level101

Second Level4101

Third Level

8101

Fourth Level

12101

Top of Steel

16101

1 2

T/O Footing

-3000

FF Second Level4301

FF Third Level8301

FF Fourth Level12316

FF Roof Access16456

2825

P3

P4

Office6 Circulation4

VESTIBULE1

CORRIDOR

61

WORK SPACE72

ROOF

ROOF

Scale

Checked by

Drawn by

Date

Project number

General Notes:

1. Verify all dimensions prior to construction.

2. Do not scale drawings. Use written dimensions

3. Use only latest revised drawings.

4. Report any errors or omissions to the Architect or Design Engineer as applicable

1 : 25

05/0

8/20

15 5

:17:

19 P

M

C:\Users\Meghan\Documents\SEMESTER 4\STUDIO\Final Submission\Bertazzoni Final Studio Submission.rvt

EW WallSections

2014-005

Bertazzoni HQ

BertazzoniAppliances

July 22, 2014

MS, JP

JS, VP

A402

1 : 25East Wall Section

1 1 : 25West Wall Section

2

No. Description Date