1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE...

49
3: .......... a::: TEST LEAD ( (IF SFACING GReATER I THAN 1 MILE) . l . . 4' MIN. COV. w PIPELINE § (ONE SIDE ONLY OR IN FENCE LINE a::: IF PRESNET) . NATURAL, I GROUND \ ·W»'} .../;$.;1' .If- .:t'/-.('/ 4' MIN. COV. MIN. COV. gsj o Z -J 0 !:!:!Ii= l..L. (J (71/ 5' MIN. COV. w z :J r SEE NOTE 2 1-- SEE NOTE 3 PROFJLE N.T.S. ---.:.--1 NOTES: 1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS. 2. BENDS SHALL NOT BE PERMITIED WITHIN THE ROAD R.O.W. THE P.IPE SHALL HAVE A OF 4.0 FTo. OF COVER EXCEPT WITHIN ROW AS SHOWN. 3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W. 4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTALLATION.. PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS FUSION BONDED EPOXY . MINIMUM TEST PRESSURE: 1,801 PSIG MAXIMUM OPERATING PRESSURE: 1,440 PSIG CARRIER PIPE TO BE EXTERNALLY COATED FOR CORROSION CONTROL . PIPELINE TO BE CATHODICALLY PROTECTED PIPELINE DESIGN AS PER REQUIREMENTS OF PART 195 . OF THE CODE OF FEDERAL REGULATIONS(LA TEST EDITION) !. TRAFFIC TO BE MAINTAINED DURING INSTALLA TlON .. PIPELINE TO BE INSTALLED BY OPEN CUT . . KEYSTONE PIPELlNF PROJECT TYPICAL OPEN CUT CROSSING OF FJELD ROAD OR SECTION LINE BY UNCASED PIPELINE No.1 DAlE I I REVISIONS DESCRIPTION DRAWN BY: UE! (DATE: 12/31/07 IAPPROVED I BY \cHKD\APPR CHKO. BY:IOATE: I -----=E"""NG=IN=EE=RI""'NG=-=MA=NA=C::=;:ER....-

Transcript of 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE...

Page 1: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

3:..........a::: TEST LEAD

((IF SFACING GReATER

I THAN 1 MILE) .l .~,~~~,,~~¥*,<"(~.

4' MIN. COV.

wPIPELINE §MARKER~~(ONE SIDE ONLY ~

OR IN FENCE LINE a:::IF PRESNET) .

NATURAL, IGROUND \

*~~~~·W»'} .../;$.;1'• .If- .:t'/-.('/

4' MIN. COV. 5~ MIN.COV.

gsj

~ II~o Z-J 0!:!:!Ii=l..L. (J

(71/ ~

5' MIN.COV.

wz:J

r SEE NOTE 2

1-- SEE NOTE 3

PROFJLEN.T.S.

---.:.--1

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITIED WITHIN THE ROAD R.O.W. THE P.IPE SHALL HAVE A MINIMU~ OF4.0 FTo. OF COVER EXCEPT WITHIN ROW AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTALLATION..

PRODUCT: CRUDE OILCARRIER PIPE: 30"0.0. X 0.515" W.T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY .

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY COATEDFOR CORROSION CONTROL .

PIPELINE TO BE CATHODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

. OF THE CODE OF FEDERAL REGULATIONS(LATEST EDITION)! . TRAFFIC TO BE MAINTAINED DURING INSTALLATlON ..

PIPELINE TO BE INSTALLED BY OPEN CUT. .

~.?> ~!:'~~~e~~daKEYSTONE PIPELlNF PROJECT

TYPICAL OPEN CUT CROSSING OFFJELD ROAD OR SECTION LINE

BY UNCASED PIPELINE

No.1 DAlE II

REVISIONS

DESCRIPTIONDRAWN BY: UE! (DATE: 12/31/07 IAPPROVED

I BY \cHKD\APPR CHKO. BY:IOATE: I -----=E"""NG=IN=EE=RI""'NG=-=MA=NA=C::=;:ER....-

Page 2: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FOR OCCUPANCYOF TWP. ROAD AND RIGHT - OF - WAY

A Sketch showing the approximate location and approximate elevation is to be attached.

The following information is pertinent to the proposed installation:

1. Intended usage: r!r-t.{c!e. tJ;I I?; e!'r~ -e

2.Size andType: 30 If . sl--e..e/ f]/; <

3: Outside diameter: 30;/

4. Method ofinstallation: t30 re

Applicant will ensure the township road and ditch will be properly restored to original conditionand the necessary safety precautions willbe taken during construction work. The work to becompleted, ifrequired in the future will be at no further expense to the township. The townshipboard or their designate'will determine,.in good fai~ when road and ditch are properly restoredto original condition. Applicant will provide township with proof of liability coverage and shallhold township harmless from any claims arising from work done by applicant.

This installation will comply with the national safety code. A marker sign will be installed whereappropriate.

Submitted: -r;-1 _

Engineer- Design (Z if .ld~r ..Approved: ------,!-==~l-Qd,~~~~:=L=_=::::~~-----------

Recommended for Approval

Telephone: (605) 448-

Page 3: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

r SEE NOTE 2

COV.

wz.::J PIPELINE~ (MARKER

~ !rTEST LEAD

4' MIN.pTYP. I

51 511-' 1-'0: 0:

~I 01 ~I<t:o. 0 O.0::: 0:: 0:::

GlI Gl Gli..

w·z::J

COV. IS' MIN. 6' MIN. 5' MIN.'j. COV. COV. COV.

.....3@f·;t,·.:·~·~.:~·::·::f. ..·£;:~ :::":::,,,: .:·;::.:·X·:;:· ·::··::.:·...·'1.·:K···;.:.::.·:::::;:J.\;.)t•.·.,.·:;< ..:•.;~,::.::~;..::~:.~:: ...:.;:::r::~;::::: .... ,:; :.::~i;;:?':;fiiiE

~'PIPELlNE"",0::

MARKER '"

NATURAL, IGROUND \

*~~~\­.~»"J Y"»7\", ,.;"J .... /J:{/4' MIN.

'1 SEE NOTE 3 ·1

PROFILEN.T.S.

NOTES:

1. CRpSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITIED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD D.lTCHES AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITIING AUTHORITY PRIOR TO INSTALLATION.

PRODUCT: CRUDE OIL'CARRIER PIPE: 30"0.D. X 0.515'~ W. T.,

API 5LX-70 DSAW PIP~ "W/12 TO 14 MILSFUSION BONDED EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING .PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTE;RNALLY COATEDFOR CORROSION CONTROL

PIPELINE TO BE CATHODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULATIONS(LATEST EDITION)TRAFFIC TO BE MAINTAINED D.URING INSTALLAnONPIPELINE TO BE IN'STALLED BY BORING TECHNIQUE.

UNIVERSAL. ENSCO. INC.

' .... Sls 1):02 j

lYPICAl BORED CROSSING OF

COUNlY ROAD BY UNCASED PIPELINE

No.1 DATE II I

REVISIONS

DESCRIPTIONDRAWN BY: UEI

I BY ICHKojAPPR CHKD. BY::

I . I I APPR. BY;

Dt\TE: 12/19/07 APPROVED'

DATE: -----;E;::;:N;;;;GI:;:;;NE~ER;::;;;IN;;;;:G:-;MwA:;:;NA;;:;:G;;;:;ER;-

DATE: DRAWING NO. I REV.

Page 4: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

Apr 21 2008 1:26PM MetcalF A~ehaeolo~~

Prepared by: lay M. bibelArneson, Ismhutb. Leibel &Parent, LLPPOao",28 .Madison, SO 57042 .(60S) 256-9]6J .

303 425 4507 p.2

____-:-- ~(R.eservedfor Regi51er ofDeeds)=-===- _

HAUL ROUTE AGREEMENT

THIS AGREEMENT entered into by andb."e;w~k TOWNSHIP, apoJin~-subdivison ofthe State ofSouth Dakota. of /lftt,.dJ,/COunty, South Dakota, heIeafterreferred to as the "Township" and •of__~~ ____--'-'....c' South Dakota----' hereinafter referred to as the "Contractor" as follows:

, 1?~.f

~S. ConttactorplaIl5 to USC township.... in transporting any itcn1 includingbut not limited topro~ equipment, nJaterials, antJIor supplies over township roads; and

WHERAS. the Township is responaibJe for COJ1!truct:ing, altering, improving, andmaintaining county roads unqer the supervision and direction of its Board ofSupeivisors; .and

WHEREAS, the Township and the Contractor anticipate that as a result oftheContractor's use oftownship roads, accelerated deterioration may occur. Thus repairs orimprovements-will be required and additional maintenance expenses will be inClJn'ed by theTownship; and ' .

NOW THEREFORE,in consideration of the 1enns, conditions. and oove1lallts containedherein, it is mutually agreed as follows:

1. PURPOSE:

This Haul Route Agreement shall be completed for existing, new, and expanded haulingoperatiOns that may cause a.cc=l~ated d~(erioration oftowcilhip roads. These baulingopeJ'ati~g sball include b~tnot be limited to: contractors. subcontractors and developers.,

2. DEFINITIONS .

A. Additional Maintenance. "Additional Maintenance" means gradin~ graveling,reshapin~ repair, and/or modifica:tion performed on township roads in eXQesG ofth= same operations perforined as 'routine maintenance by the Township.

Page 5: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

,Apr 21 2008 1:26PM.He~ealF Arehaeolog~ :303 425 4507 p.3

B. Township Road. "Township Road" means a meet, road, or·other pliblic way,including shouldexs, and rlght-of-'way designated for the purpose ofvebiclllartraffic and under the jurisdiction ofllie Township. '

C. Haul Road. "Haul Roaii" means .any Township road, bridge~ or other atrocturewhich is used for transporting items including but not limited to products,equipments, materials and/or,supplies and as a result incurs deterioration.

D. Haul Routa. '''Haul Route" means the system of haul roads between a. source siteand the destination.and/or the source site and 'the nearest major intersection asdetermin~ by the Township.

E. Improvements. "Improvements" mean roadway improvemems required by theDireaorbecause ofthe Con1ractor's use ofthe haul road.

3. QENERAL AGREEMENT AS TO ROAD USE;

The Contractor undeIstands and agrees that, although the haul roads covered by thisAgreement are on 1he Township Road Systcln and are subject to l10rmal traffic use theCon1raCtOr. 'by virtt1e of its.use ofthe road I1S a haul route, assomes fCSponsibility for ,additiocal maint~ce and signing costs on such roads resulting from its wse ofsuchroads as a haul route. '

The Township hereby agrees to the Contractor's use of1be haul J'Q~ covered by theAgr=ement subject to the conditions contained herein. The Contractor shall berespo~ble for obtaining any other pemti1:s at' licenses which the Township or anyothcrgovernmental entity may required to operate or move it!! vehicles on county roads. 'IbisAgreement sJui!.l nol serve to reli~e any op~ator ofa Contrilctor's vehicle n-om 'complying with applicable~d Iimits, weigh1 restriclions, or otherposted :restriDtions.

Any improVements to 01' widening of the road necessitated by the Contmctor"soperations, including modification of roadway approaches to accommodate transportvehicles, shall be considered incidental to the hauling performed, shall be made- at theCon'tractor's sole ex.pense unless otherWi~e authorized in 2lD ~dmdum tl:! this Agreement.Any such bnproyement shall beaua.wnzed by Townshippcrmit. .

4. GENERAL TERMS:

A. Compliance with Laws and Regulations

The Contractor shall com.pty with all Fcdcr~ State, Ill1d local laws and regulations.

B. Severa.bility

Ifany portion ofthis Agreement is held invalid it shall have no effect upon thevalidity ofthe remaining portions ofthis Agreement

Page 6: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

ApI"' 21 2008 1: 26PM He-eoa ~."':.. A:...:.:I"':...,:o:.;.h.:..=a:..::.e..=.o;:.:lo::..:!~i!.::~~__--=.3..=.03::::...-4;.;;;2;.;;;5_4..;..5;;.;0;;.;7 ~p'-._4__

c. Scope and Cons1rUction ofTcJmS

The definitions in this Agr~nt shall control the meaning ofterms used herein.'Wbere no definition is expressly stated herein, a term shaJl have that meaning clearlyindicated 'I:1Y, or reasonably implied from, the context in whicb such teIm is used.

D. Notification

All notices and oral or written comm1.U1icatioDS relating to this Agreement may beforward~ to:

On behalf oftheTownship:

~g.R~L\.· J,. "~L-I.rl£V-

On behalfofthe TransCsnada Keystone Pipelin~ LP:

Page 7: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FOR OCCUPANCY

OF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of .0~,?\-~y\' Township, Britton, South Dakota.

(j

Application is made by: "'"It'~~~bo...c\'''- - k.~)I~'r~~:~\:,,",R . for. ~~~.

Occupancy of: Se~tion. ({2.th. St· Township rz.b,(,) "iIi!!':!itP. ,Range 5~ tJ

Marshall County, South Dakota

A Sketch showing the approximate location and approximate elevation is tq be attached.

The following information is pertinent to the proposed installation:

. 1. Intended usage: C:r t-A-6..c...-. ""0 ~ \ ~.'P~ ~ ~~.

2. Size anqType: ~., 5~e:-J .~~

3. Outside diameter:

4. Method ofiristallation: B b re...-.Applicant will ensure the township road and ditch will·be properly restored to original condition andthe necessary safety precautions will be taken during construction work. The work to be completed, ifrequired in the future will be at no further .expense to the township.·The township board Qr theirdesignate will determine, in good faith, when road and ditch are properly restored to original

. condition. Applicant will provide township with proofofliability coverage and shall hold township·harmless from any claims arisjng from work dope by applicant.

This installation will. comply with the national safety code.. A marker sign will be installed whereappropriate. . . .

Recommended fOf Approval Submitted~·(;::..u-:.~~ - Bo~-<:..C ~: \ \ ~~ ~

Engineer- Design =:sc;~ S.J\ .Jt...C~

DonSymensTelephone: (605) 448- 605-448-5800 home with answering machine

605-448-8013 cell

Page 8: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

4' MIN. COV.

SEE NOTE 2rwz:J [PIPELINE "~ MARKER

~ TEST LEAD

4' MIN. "TYP.

511:::o·

~Io.~:

~I

01

~~

GJ

6' MIN.'COV.

1/2+h Sr"/}Jf-S"fOtfl TiNf

xlg:o·

~Io.~:

~I

wz:J

/'4' MIN. COV. "5' MIN.

COV.

PIPELINE"MARKER

NATURAL,GROUND \

SEE NOTE 3

PROFILEN.T.S.

NOTES:

1: CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMmED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A "MINI~UM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

J. MAXIMUM JOINT LENGTHS SHAll BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING" AUTHORITY PRIOR TO INSTALl.ATION.

lYPICAL BORED CROSSING OFCOUNTY" ROAD" BY UNCASED PIPELINE

TransCanadaIn busi';ess to deliver

UNIVERSAL_1HC.I ... ::sgs IAd ;;'

PRODUCT: CRUDE OILCARRIER PlPE: 30R O.D. X 0.515- W.T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFlISION BONDED ·EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIGCARRIER PIPE TO BE EXTERNAllY COATED

FOR CORROSION CONTROL .PIPEUNE" TO" BE CATHODICALlY PROTECTEDPIPELINE DESIGN AS PER" REQUIREMENlS OF PART 195

OF THE CODE OF FEDERAL REGULATlONS(LATEST EDITION)TRAFFIC TO BE MAINTAINED DURING INSTAlLATIONPIPELINE TO" BE INSTALlED BY BORING TECHNIQUE.

REVISIONS

DESCRIPTIONDR1IHIf BY: UEI

APPR CHKD. BY:APPR." BY:

PROVED

ENGINEERING lAANAGER

Page 9: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FOR OCCUPANCY

OF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of .0e;.e,\.~ Ie... Township, Britton, South Dakota

Applic~tion is made by:~Q>~ (c""'bo- cl~ - }(<:..'/~\-~ ~:~\ ~y\'R for. - ",SEY42.'d ',' ,I. " .. "'. --

Occupancy of: Section ,N £ Vii IL-- Township lU A) -;re;:,f , Range 5~ tJ, . ,Jl3th St

Marshall County, South Dakota

A Sketch showing the approximate location and approximate elevation is tq be attached.

(j

The followjng infonnation is p~rtinent to the proposed installation:

1. Intended usage: C:r ........6.c...-, ~~ \ ~p~~ \'\..~,

2. SizeamfType:' ~., 5\-c:..J ~~3. Outside diameter:

4. Method of installation: bore-Applicant will ensure the township road and ditch will·be properly restored to original condition andthe necessmy safety precautions will be taken during construction work. The work to be completed, ifrequired in the future will be at no further expense to the township.·The township board Qr theirdesignate will determine, in good faith, when road and ditch are properly restored to originalcondition. Applicant Will provide township with proofof liability coverage and shall hold townshipharmless from any claims aris.ing from work dope by applicant.

. ,

This installation will. comply with the national safety code. A marker sign will be installed whereappropriate. . . .

Recommended for Approval Submitted:··-;:~-dAn.~ - Boc:s-s-C ~~ \ \ :~ ~

Engineer-Design ::Si'i'~ -S.J\ Jt..C~,

"

home with answering machinecell

Telephone: (605) 448-

Approved: --'--4=-=----------:......-------------------

.Township Board: ~:!::::.:::=+J~....!.-~~~~l..2-~--------"---"= ..~-=..=-.. ~''=.,-~-'~.. '~'_=---~-'__'.--"__'.~- _.,--:' ..

Page 10: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

4' MIN. COV.

SEE NOTE 2.rwz:J r;PIPELlNE .3= MARKER

"a; . TEST LEADl .4' MIN. I

TYP.

[51I- .0:

~Io.0:::

GJI

OJ~0::

Gl

6' MIN•.COV•.

5' MIN.COY.

(13M 5f­f!lJe,frW\ 7w/J

~d1--0:

~Io.0:::

Gli

wz:J

PIPELINEMARKER

NATURAL,GROUND ,

SEE NOTE 3 ·1PROFlLE

N.T.S..

NOTES:1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTAlLATION.

PRODUCT: CRUDE OILCARRIER PIPE: 30"0.0. X 0.515'" W.T.,

API 5LX-70 DSAW PIPE W/12'TO 14 MILSFUSION BONDED EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIGCARRIER PIPE TO BE EXTERNALLY COATED

FOR CORROSION CONTROL .PIPELINE' TO' BE CATHODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULATJONS(LATEST EDITION)lRAFFlC TO BE MAINTAINED DURING INSTALLATIONPIPEUNE TO BE INSTALLED BY BORING tECHNIQUE•.

TransCanadaIn businessto deliver

lYPICAL BORED CROSSING OFCOUNTY' ROAD BY UNCASED PIPEUNE

REVISIONS~_ I __

DRAWN RV· 111=1

Page 11: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis
Page 12: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FOR OCCUPANCY

OF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of .0 C-f;>\~\t\.. Township, Britton, South Dakota

- Applicationismadehy: ~Q::..Y"6c..e....,.,...... ¢'o..w - k~\/i5\-~ ~:~t""R for. S.E.J/"I 1'1 I .

Occupancy of: Section .NEW 23 .Township rZ.bA);;e:;f , Range 5'1 lJ. lJ 5"th 5+- '

Marshall Coupty, South Dakota

A Sketch showing the approximate location and approximate elevation' is t<;l be attached.

t---:->,;,._..'

The foIlow:ing infonnation is pertinent to the proposed installation:

1. Intended ~sage: Cy-~~ "'0 ~ \ .~ pd ~ "'-e...:....2.SizeanqType: 30'1 5~~ ~~

3. Outside diameter:

4. Method ofiIista1lation: ~ it{ +-Applicant will ensure the township road and ditch will'be properly restored to original condition andthe necessary safety precautions will be taken during construction work. The work to be completed, ifrequired in the future will be at no further expense to the township.·The township board Qr theirdesignate will determ:iD.e, in good faith, when road and ditch are properly restored to originalcondition. Applicant will provide township with proofofliability coverage and shall hold townshiphannIess from any claims arisjng from work dope by applicant.

This installation will. comply with the national safety code. A marker sign will be installed whe:reappropriate.

Recommended for Approval Submitted:"-r;:~~!O.~ - ?o~.;;.C ~: \ \ :~ ~

Engineer- Design ~e:~ ~.J\ Jl....C~

Approved: ~_'_ --:- _

" ._ ....- _. _••••- _.- •••••- .• '=: .., 'TownshiPBOard~~

~~'--". :0 ~.!_'~~~Q~~~__ ""--~_...__...._.. . _

. Don Symens .

Telephone: (605) 448- 605-448-5800 home with answering machine605-448-8013 cell

Page 13: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

, '.

115~5t­

. Wet)T(/h IWpSEE NOTE 2

Bl' 511::::: 1:::

w 0' o· wz~l 5!1 5!1

Z:J

:J [P'PEUNEO

0.::: o. a o.~ MARKER0::; 0:: 0:::

"-. PIPELlNE"~ ~l ~ ~I 0:; TEST LEAD

MARKER _1- .NATURAL" I 4' MIN. 'f'GROUND TYP.

~ T £"-'6.."-' l-....'6o,.~ ., ").v v/V' "

r'\'4;X~IN. COV. 5' MIN. 6' MIN.

5' "'N.!"7"Y'

4' MIN. COV.COV. COV. . COV•

.Ir----- SEE NOTE :5

PROFILEN.T.S.

--I

J •

NOTES:

1. CROSSING. SHALL 8E CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT 8E PERMITTED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A ·MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMlTTING AUTHORITY PRIOR TO INSTALLATION.

PRODUCT: CRUDE OILCARRIER RIPE: ':50"0.0. X 0.515- W.T••

AP15LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED 'EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM O~ERA,l1N9 PRESSURE: 1,440 PSIGCARRIER PIPE TO BE EXTERNALLY COATED

FOR CORROSION CONTROL 'PIPELINE' TO' BE CATHODICALLY PROTECTEDPIPEUNE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF 'FEDERAL .REGULA110NS(LATEST EDIllON)TRAFFIC TO BE MAINTAINED DURING INSTALLA110N'PIPELINE TO' BE INSTALLED BY BORING TECHNIQUE.

lYPICAL BORED CROSSING OFCOUNlY .ROAD' BY UNCASED PIPELINE

No.1 DATE I:I I

REVISIONS

DESCRIPllONDRAWN BY: VEl DAlE: lVllJ/07 APPROVED

.1 BY icHKofAPPR CHKD. BY: DAlE: :-------;:;EN::::Gl=-:N:;::;:EER'""iL.:NG::-wUANAG=:E'<ER·

. I 'I I a;..;APPR..~..;;.BY:;..:__~~:;;.;..1J£:;;;;·--_-.a·DRAWING NO. I REV.

Page 14: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FOR OCCUPANCY

OF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of .0~"2\-~1t\. Township, Britton, South Dakota

Application is made by:--r;o-..~Cc...n.bL~<b. - 'K..~;'t::,'r~ t>:~\:Y\~ for. . SEW!: Z3 .

Occupancyof:Section.NEVJ/.:l" .Township l'2k,t) 'i!1f!J:Iie ,Range 5t::ttJ, '. JlbM St- .

Marshall County, South Dakota

A Sketch showing the approximate location and approximate elevation is tq be attached.

r\"':::..-:../

The followjng infonnation is pertinent to the proposed installation:

1. Intended usage: C:. L.'o-6.~ • ---e: \ ~ 'P~ ~ "'-~

2. Size afi(~ Type: ~,' 5 +-e-J ~pc....,3. Outside diameter:

4. Method ofiristallation: ~uf) bat restDre ~rtl,cle.~·

Applicant will ensure the township road and ditch will·be properly restored to original condition andthe necessary safety precautionswill be taken during construction work. The work to be completed, ifrequired in the future will be at no further expense to the township.·The township board Qr theirdesignate will detennine, in good faith, when road and ditch are properly restored to originalcondition. Applicant Will provide township with proofof liability coverage and shall hold townshipharmless from any claims arisjng from work dope- by applicant.

This installation will, comply with the national safety code. A marker sign will be installed wh~eappropriate.

~ecommended for Approval Submitted:"-;;:~4n~ --?0G."S--C ~: \ \ ~~ ~

Engineer- Design =;sc;~ '$~.I' Jt..C-~

' •• _ .. _~ .. - .....__ On" ••• _ •• .. ••

.Da:nd~VIA/? "~A ~ __----~.-DonSymens

Telephone: (605) 448- 605-448-5800 home with answering machine605-448-801::1 cell

Approved:~ _ _

.Township Board:~ _7. '.J?~) ,

Z{%«~-_.~!""_O_',

Page 15: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

/ / (P +-A 7f­(llk9f&V\TiIlp.

r SEE NOTE 2

5/ 51t=: t=:

w o· ;jz ~I ~I:J;: O. 0 O.

0:::: 0::: 0::::.........

GJI GJ GJIPIPELlNE~MARKER

NATURAL"\ JGROUND

'W&", ').v, y6' MIN.4' MIN. COV. 5' MIN. 5' MIN./COV. COV. . COV.

wz::;J [PIPELINE .~ MARKER

~ TEST LEAD

4' MIN. r/'TYP.

1 ~.,. ,>"4' MIN. COV.

I SEE NOTE 3 IPROFJLE

N.T.S.

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A ·MINIMUM OF. 4.0 Fr. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

3. MAXIMUM JOINT lENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMlTIING AUTHORITY PRIOR TO INSTAlLATION.

PRODUCT: CRUDE OilCARRIER P.lPE: 30"0.D. X 0.515" W.T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED 'EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRE~SURE: 1,440 PSIGCARRIER PIPE TO BE EXTERNALLY COATED

FOR CORROSION CONTROL .PIPEliNE' TO' BE CATHODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULAT10NS(LATEST EDitiON)TRAFFIC TO BE MAINTAINED DURING INSTAlLATIONPIPElINE TO' BE INSTALLED BY BORING TECHNIQUE.

TransCanadaIn business to deliver

. DIDI:::I 11111= ..........JECT

TYPICAL BORED CROSSING OFCOUN1Y 'ROAD' BY UNCASED PIPELINE

No.1 DATE I:I I

REVISIONS

DESCRIPTIONDRAWN BY: UEJ

.1 BY ~HK~APPR CHKD. BY:1 . 1 1 APPR. BY:

1DAl£: 12/19/rrT I"-!'PROVEDCAl£: -=-----;::;EN:;;::ct;.-;NEER=IN:-O':G:"";UANAG:;rn;r;;;ERO:;;-

CAl£: DRAWING NO. ,I REV.

Page 16: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FOR OCCUPANCY

OF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of.0~\.~\r... Township, Britton, South Dakota

Application is made by: ~lO~Cc"h..... "p...":" k<,-'/~\-~ t>:pc...\:V\R for.' ~£ 01 02.6· '. .

Occupancy of: Section. Nt 14 35 . Township 12b,{) g:p ,Range 5~ tJ. - j l'1tIrJ 5t-

Marshall County, South Dakota

A Sketch showing the approxiniate location and approximate elevation is tqbe attached.

The followjng ;monnation is pertinent to the proposed installation:

1. Intended usage: c..~~ --e: \ ~ pe-1 ~ "'-G

2.SizeanqType: 30" 5~~ ~~

3. Outside diameter:

4. Method ofiIistallation: 130 reApplicant will ensure the township road and ditch will -be properly restored to original condition andthe necessary safety precautions will be taken during construction work. The work to be completed, ifrequired in the future will be at no further expense to the township.·The township board Qr theirdesignate will detennine, in good faith, w;hen road and ditch are properly restored to originalcondition. Applicant Will provide township with proofofliability coverage and shall hold townshiphannless from any claims arisjng from work dope by applicant.

This installation will, comply with the national safety code. A marker sign will be installed whereappropriate. . . .

Recommended for Approval Submitted:··-r;::~Un~ - ?o&-s..C ~: \ \ :~ "S

Engineer~ Design ~i';~. sJ' A.. \:~

home with answering machineI'p11

~

I

Telephone: (605) 448-

Approved: _~:..- ~ _

....-..

Page 17: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

J17+h S-r­[lVe7t&v- -';;p

r SEE NOTE 2

:r:1

I tdg: !:::UJ o· o· UJz

~I ~I ~IZ

::i.:J r;PIPEUNE .=: o. o.~ MARKER

"-0:::: 0::: 0::::

PIPEUNt~ ~I ~ ~I 0:; TEST LEADMARKER _1_ -

NATURAL, I 4' MIN. i{-GROUND TYP,

'~~ T ~

)-' ,,~~,!.?".,,.,

r<4.;'<'M1N. COV. 6' MIN.' " 5' MIN.5' MIN'l 4' MIN. COV.

COV. COV. . COV.

I SEE NOTE 3 ·1",

PROfILEN.T.S.

--t-'

NOTES:

1. CROSSING 'SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERM,IT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A -MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN ,THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTALLATION.

lYPICAL BORED CROSSING OFCOUNlY 'ROAD' BY UNCASED PIPELINE

_PRODUCT: CRUDE OILCARRIER RIPE: 30"0.D. X 0.515- W.T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED "EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRE~SURE: 1,440 PSIGCARRIER PIPE TO BE EXTERNALLY COATED .

FOR CORROSION CONlROL" ' •PIPEUNE' TO' BE CATHOD/CALLY PROTECTEDPIPEUNE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULATlONS(LATEST EDmON)TRAmc TO BE MAINTAINED DURING INSTALLATIONPIPEUNE TO' BE INSTALLED BY BORING TECHNIQUE.

1'1.

TransCanadaIn business to deliver

1:I11:1CI l~IC DDn.IFr.T

'lo·1 DATE I:I I

REVISIONS

DESCRIPTION"DRAWN ElY: UEI ~lE: 12/19/07 ~PROlJ£l)

_I BY ~HKofAPPR CHKD. BY: Dl\lE: -----::EJIj:':::G"'"IN""EER='''''NG=-:=MANAG=EER:-

I . I I a;.;AP_PR.~BY:;.;;..'__..ilA_-m=· ....DRAWlNG NO. 1 REV·

Page 18: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis
Page 19: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FOR OCCUPANCY"

OF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of .0 C!:.b\~\r\.. Township, Britton, South Dakota

Application is made by: ~o-..~Cc.;.n.ta. <:\0..... - k.c...i'5\-~t>:~\ ~""e...... for

O~cupancyof: Section. SE.~ 3.5" -Township rz.~A..j ~ ,Range 5'llJ. . JJ 8th 5i-

Marshall County, South Dakota

A Sketch showing the approximate location and approximate elevation is tQ be attached.

The followjng infonnation is pertinent to the proposed installation:

. 1. Intended usage: C:r v-6..c-. 1:) ~ \ ~ f)cJ ~ "'-~.

2.SizeanqType: ~., 5~~?:~t~\'<._. -'

3. Outside diameter: -.

..- ...

4. Method of iristallation: B () re-Applicant will ensure the township road and ditch will·be properly restored to ori~nal condition andthe necessary safety precautions will be taken during construction work. The work to be completed, ifrequired in the .future will be at no willer expense to the township.-The township board Qr theirdesignate will determine, in good faith, when road and ditch are properly restored to originalcondition. Applicant Will provide township with proof ofliability coverage and shall hold townshipharmless from any claims arisjng from work dope by applicant. .

This installation will. comply with the national safety code. A marker sign will be installed whereappropriate. . . .

Recommended for Approval Submitted:'·-r;:~~~ - ?oes.-s..C ~: \ \ ~~ ~

Engineer- Design ~A'~·S'aJ' .s(C-~

Approved: ..--:- _

'Township Board: -k~~1-----!~~~~~..:....--------'.,~'"~..=-~.''-'-''~'~".=_..~"..~.'='_-"-"-"'-"-,,- _

Page 20: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

4' MIN. COV.

SEE NOTE 2rwz::J rPIPELINE .~ MARKER

I ~ TEST LEAD

4' MIN. ITYP.

01f-o6:

~Io.0:::

~I

6' MIN.COV.

}l g i-~ 'St­WQ;S~~p

5' MIN.COV.

61f- 0

Ci:

~!0:::

~I

wz::J

PIPELlNtMARKER

NATURAL,GROUND \

PROFILEN.T.S.

NOTES:1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQl)IREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A ·MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN~ .

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTALLATION.

TYPICAL BORED CROSSING OFCOUNTY ROAD' BY UNCASED PIPELINE

TransCanadaIn business to deliver

U'c'v~,rn~lc I

UNJ:VERSALnaco. DIe.

''''SJ I Ft.'" .s tZ

PRODUCT: CRUDE OILCARRIER PIPE:30"0.D. X 0.515" W.T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY COATEDFOR CORROSION CONTROL .

PIPELINE' TO BE CATHODICALLY PROTECTED'PIPEUNE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULAT10NS(LATEST EDITION)TRAFFIC TO BE MAINTAINED DURING INSTALLATIONPIPEUNE TO BE INSTALLED BY BORING TECHNIQUE.

REVISIONS

Page 21: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

.~-~-~-~~~-.~~~------.--. --.-------- -.----- .-. -- "'-.--'- -... ·--------0··----·--· --- ... _ .. - -------------Wf!JFrom: Roger Phillips [[email protected]]

Sent: Monday, July 14, 2008 9:48 AM

To: JIM Lordon

Cc: [email protected]

Subject: Bonds for South Dakota

Jim, . "'.<'.-- .. - '_"<"';~';"I need two $250,000.00 bonds one foryVeston TpWQ§hip·& Andover Township. These will be for the Road Haul Agreement If wecould do these like the ones in North Dakota, send me a PDF of the Bond and then get them a sealed copy in a week to ten days.If I could get these quickly it would make my life easier.

Weston Township, Marshall County, South Dakota41484 116th StreetClaremont, South Dakota 57432

If you need more info let me know.

Andover Township, Day County. South Dakota13138 414th AveAndovElr, South Dakota 57422

Thanks,Roger

Roger PhillipsPermit CoordinatorKeystone Pipeline Project7509 NW Tiffany Springs ParkwayNorthpointe Circle II. Suite 200Kansas City, MO 64153Ph: 1-816-880-4609 ext 133Cell: 1-618-218-2633Fax: 1-816-880-6612email: [email protected]

"

L

Page 22: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

Performance Bond forWork in Public Right ofWay

Bond Number: SN4226

KNOW ALL MEN BY THESE PRESENTS That TransCanada Keystone Pipeline LP, asPrincipal and Travelers Casualty and Surety Company of America, a corporationorganized and existing under the laws of the State of Connecticut. and duly authorizedto transact a corporate surety business in the State of South Dakota, as Surety, ai-eheldand firmly bound unto Weston Township, Marshall County, South Dakota, as OBLIGEE,and unto such other whose benefit this obligation is intended to run, in the penal sum ofTwo Hundred and Fifty Thousand Dollars -----00/1 od ($250,000.00), to be paid untosaid parties, their successors and assigns, for which payment we jointly and severallybind ourselves and each of our heirs, legal representatives and successors, firmly bythese presents.

WHEREAS, the Principal desires to carry onthe business of hauling in public rights ofway in the Weston Township, Marshall County, South Dakota for the period commencingJuly 14, 2008.

NOW THEREFORE, THE CONDITIONS OF THIS BOND ARE THAT:

A. Said Principal shall in all respects comply with and will faithfully perform allthings required by County or State law, and by any permits issued thereunder: and .

B. Said Principal shall indemnify, save and keep said obligee, and its officialsand employees harmless of and from any claims, damages, liabilities, losses,actions, suits, or judgements which may be presented, sustained, brought orobtained against said Obligee or its officials or employees because of saidconstruction, or by any accidents caused by or resulting there from: and

C. Said Princip~1 shall pay all damages imposed upon it for violation of any .County of State Law or conditions of any permit issued there under: and

D. Said Principal shall replace or perform again in a faithful and adequatemanner all work and materials to a reasonable standard, which are not inaccordance with the applicable county or State law and permits; and

E. Said Principal shall faithfully satisfy all judgements based on tort liabilitywhich are obtained by reason of negligence through said construction which·

.negligence is attributable to said Principal or his agent;F. In no event shall the aggregate liability of the Surety hereunder exceed the

penal sum stated above.G. If the Principal shall satisfy all of the above conditions then no obligation shall

arise under this bond.

If the principal fails to perform any of the above conditions, then the Principal and Suretyshall be· liable under this· bond to the extent necessary to satisfy the breach of conditions.

The surety herein shall have the right to withdraw as sure.ty from this bond and may doso upon giving the Obligee and said Principal 30 days written notice to that effect,whereupon, except as to any liabilities or indebtedness incurred or accrued prior to thetermination of said 30 day noti~e the liability of the Surety under this bond shall cease,and the said bond shall thereupon· terminate and be of no more force or effect.

Page 23: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

. ~

TRAVELE·RS JPOWER OF ATTORNEY·

Farmington Casualty CompanyFidelit)' and Guaranty Insurance CompanyFidelit;!' and GuaranI)' Insurance Underwriters. Inc.Seaboard Surety CompanySt. Paul Fire and Marine Insurance Compan)'

St. Paul Guardian Insurance Companyst. Paul Mercury Insurance CompanyTrav~lersCasualty and Suret)' Compan)'Trin'elers Casualty and Surety Com·pany of AmericaUnited States Fidelit)' and GuaranI)' Company

Attorney-In Fact No. 219252 Certificate No. 0-02030049KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, that St. PaulFire and Marine Insurance Company, St. Paul Guardian insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the lawsof the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America arecorporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under thelaws of the State of Maryland. that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws·of the State of Iowa, and that Fidelity andGuaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and tliatthe Companies do hereby make. constitute and appoint

Deb S~ton, Mark Shaul. Murray Epp, Tim Gale, and Lois Innes

of the City of Calgary, Alberta . ' State of Canada , their true and lawful Attorney(s)-in-Fact,each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings andother writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance ofcontracts and executingor guaranteeing bonds and undertakings required or permitted in any ,!ctions or proceedings allowed by law.

26thIN WITNESS WHEREOF, the ComEanies have caused this instrument to be signed and their.corporare seals to be hereto affixed, this _

d fOctober 2007 ..

ayo

Farmington Casualty CompanyFidelil)' and Guaranty Insurance Company.Fidelity and Guaranty Insurance Underwriters, Inc.Seaboard Surety. CompanySt. Paul Fit-e and Marine Ins~ranceCompany

St. Paul Guardian Insurance CompanySt..Paul Mercury Insurance CompanyTrm'elers Casualty and Surety CompanyTravelers Casualty anli Surety Company of AmericaUnited States Fidelity and Guaranty Company

State of ConnecticutCity of Harrford ss.

By:iee Pre~idenl

26th October 2007On this the day of , before me personally appeared George W. Thompson, who acknowledged himselfto be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty [nsuranee Underwriters, In.c.,Seaboard Suret)' ·Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company. St. Paul Mercury Insurance Company. TravelersCasualty and Surety Company, Travelers Casualty and Surety Company of America. and United States Fidelity and Guaranty Company, and thaI he. as such. beingauthorized so to do. executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.

"" Marie C. Tetreault. Nomry PuhlieI~ Witness Whereof, I hereunto set my hand and official seal.My Commission expires the 30th day of June. 20 J I.

58440-5-07 Printed in U.S.A.

Page 24: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FO~OCCUPANCyOF TWP. ROAD AND RIGHT - OF - WAY

A Sketch showing the approximate location and approximate elevation is to be attached.

The following information is pertinent to the proposed' installation:

I. Intended usage: ~yud-e &/ f}jJelrYc e.2. Size and Type: 30/1 6/eel !?;:;e..3. Outside diamet~r: 30 If.

4. Method of illstaIlation: $t;Jr-e- .

Applicant will ensure the .township road and ditch will be properly restored to origiI)al conditiop.and the necessary safety precautions will be taken during construction work. The wo"rk to becompleted, if required, in the future will be at no further expense to the township. The townshipboard or their designate will determine, in good faith, when road and ditch are properly restoredto original condition. Applicant Will pi"Ovide township with proof of liability coverage and shallhold township haimless from any cIaiins arising from work done by applicant.

This installation will comply with the national safety cod~.·A marker ~ign will be installed ~hereappropriate.

Recommended for Approval Submitted:

Engineer- D-eSi~-----T.'I-,~-Z----:r-d-~-··.

Telephone: (605) 448-

.~

5urp,. . ,'S~~

Page 25: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

-''''---~~----------------------------------.,

. 17.:t6/t/-;f;t79W- £--~l~1"I ;ZJ/1/- KrtW -- Me!" "Z-

SEE NOTE 2

COV.

wz.

::J [PIPELINE.. ~ MARKER

. ""- ' .

0::. (TEST LEAD-l .4' MIN. II~ .

TYP. il '

[51 [5\t::: !:::::o· o·

~I 01 ~I«0 .. 0 o.0::.: 0::. 0::.:

8-'1 (;3-1 8-'1

wz::J

COV. IS' MIN. 6' MIN. 5' MIN.COV. cpv. COV.

~~'8f\:" :':'~.;:.,:.:.:~:.~':~::':, ;:;-:-'.: ':.:;;:::':::::'.:;:'; .:·~~';··::~:;~:.::7.;;··::·:;r.x~::;:..:; ..;~::(;;:-;:;:~;::::·::.:::;:~:;:;r~::·.::: ::~;;:;\i;~R~¥*E

~

""­PIPELINE~0::. iMARKER "'-

NATURAL, I·GROUND \

*'«<~~~,.~;»;~~

4' MIN.

'/. S.EE NOTE .3 I

PROBLEN.T.S.

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITIED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

.3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE' NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTAL~TION.

TYPICAL BORED CROSSING OF

COUNTY ROAD BY UNCASED PIPELINE

PRODUCT: CRUDE OILCARRIER PIPE: 30"0.0. X 0.515" W. T.,

API SLX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE:' 1,801 PSIGMAXIMUM OPERAtiNG PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY COATEDFOR CORROSION CONTROL

PIPELINE TO BE CATHODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULATIONS(LATEST EDITION)TRAFFIC TO BE MAIN TAINED DURING INSTALLAnONPIPELINE TO BE INSTALLED BY BORING TECHNIQUE.

UNIVERSALEHSCO" INC.

, ~~ I '::t I.....~? 275 ? 2

~~ !,,:~;~~~daKEYSTONE PIPELINE PROJECT

No·1 DATE IREVISIONS

DESCRIPTIONDRAWN BY: VEl IO(\TE: 12/19/07 IAPPROVED

IBY ICHKblAPPR CHI<D. BY:: IDATE: I ~---;=;"EN;-;::-GI~NE;:;:E"'RI-;;;NG:;-"M:o.AWNA-;;:G;;:;ER;:;-

Page 26: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

MARSHCertificate of Insurance No. TCPL-2008-35 Dated: August 20,2008

This document supersedes any certificate previously issued under this number

This is to certify that the Policy(ies) of insurance listed below ("Policy" or "Policies") have been issued to the Named Insured identified belowfor the policy period(s) indicated. This certificate is issued as a matter of information only and confers no rights upon the Certificate Holdernamed below other than those provided by the Policy(ies).

Notwithstanding any requirement, term or condition of any contract or any other document with respect to which this certificate may beissued or may pertain, the insurance a.fforded by the Policy(ies) is subject to all the terms, conditions and exclusions of such Policy(ies). Thiscertificate does not amend, extend or alter the coverage afforded by the Policy(ies). Limits shown are intended to address contractualobligations of the Named Insured.

Limits may have been reduced since Policy effective date(s) as a result of a claim or claims.

Certificate Holder:

To Whom it May Concern

•,AB.

Named Insured and Address:

TransCanada Corporationc/o Insurance Risk Department450 - 1 Street S.W•Calgary, AB T2P SRI

Type(s) ofInsurance Insurer(s) Policy Effective/ Sums Insured Or Limits of LiabilityNumber(s) Expiry Dates

EXCESS LIABILITY AEGIS X3263AIA08 Jun 01, 2008 to Each Occurrence and in the Is 25,000,000Jun 01,2009 Aggregate as Applicable

Notice of cancellation: .The insurer(s) affording coverage under the policies described herein will not notify the certificate holder named herein of the cancellationof such coverage.

Marsh Canada Limited222 - 3rd Avenue SW

Livingston Place, Suite I I00

Calgary, AB TIP OB4

Telephone: 403-476-3421

Fax: 403-294-3896

[email protected]

By:

Marsh Canada Limited

Cheryl Kassai

Page 27: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FO~O(:CUPANCYOF TWP. ROAD AND RIGHT - OF - "VAY

A Sketch showing the approximate location and approximate elevation is to be attached.

The following information is pertinent to the proposed- installation:- ,

]. 'Intended usage: Cr-uc!-e&I /}jJe../::n-e2. Size and Type: 30/1

' 6l-ee! f}jO e.. _-

3. Outside diameter: 36 If.

4. Method of iristallation: C?j(a /!/ .c!:~7

Applicant will ensure the .township road and ditch will be properly restored to origiQ.al conditionand the necessary safety precautions will be taken during construction work. The 'wo'rk to becompleted, if required, in the future will be at no further expense to the township. The townshipboard or their designate will determine, in good faith, when road and ditch are properly restoredto· original condition. Applicant will provide township with proof of liability coverage and shallhold township haimless from any claims arising fro~ work done by applicant.

. . .

This installation will comply with the national safety code. A marker sign will be installed whereappropriate.

Recommended for Approval

Telephone: (605) 448- .

Page 28: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

Tl;zS-A:/-/?P1tp-~4 11i/fi 'I /v,.... ~?'fW- Jc.eC!.. ~ .:?

~I·.r SEE NOTE 2

. wPIPELINE 5MARKER~(ONE SIDE ONLY ~

OR IN· FENCE LINE IYIF PRESNET)

NATURAL, IGROUND \

'*~~~~,''Y~~W4' MIN. COV. S' MIN.

COV.

ClI W

C§I~IY ...J .

Cl Z...J 0'::!Ii=I.L. u

GlI'~

S' MIN.COV.

~

"-IY 'I(ITEST LEAD(IF SFACING GREATER

I THAN 1 MILE)

~,~~~.~*-@¥""~~'

4' MIN. COV.

SEE NOTE 3

PROFILEN.T.S.

--I

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REOUIREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PH=JE 'SHALL HAVE A MINIMUM OF4.0 FT. OF COVER EXCEPT WITHIN ROW AS SHOWN.

3. ·MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF, WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTALLATION.

PRODUCT: CRUDE OILCARRIER PIPE: 30"0.0. X 0.S15" W. T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY COATEDFOR CORROSION CONTROL .

. PIPELINE TO BE CATHODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL· REGULATIONS(lA TEST EDITION)TRAFFIC TO BE MAINTAINED DURING INSTALLATIONPIPELINE TO ~E INSTALLED BY OPEN CUT

f,~ TransCanada" . In business to deliverKEYSTONE PIPELINE PROJECT

1YPICAL OPEN CUT CROSSING OF.FIELD ROAD OR SECTION LINE

BY UNCASED PIPELINE

No.1 DAT.E IREVISIONS

DESCRIPTION

DRAWN BY: UEJ

IBY !cHKoIAPPR CHKD. BY:

IDATE: 12/31/07 IAPPROVED

IDATE: I -----=EN=G:::-cJN:::::EE::;::;R:-:-:ING:::-:-:MA~NA::-;G::-;::ER;:;-

Page 29: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

Recommended for Approval

APPLICATION FO~OGCUPANCYOF TWP. ROAD AND RIGHT - OF - "VAY

To: The.to~p bOard3f~F TownsbiJ,l, Britt")7~U/h DakotaApphcapon IS made by: I m_~~~---.d~ - Kwsbrlil, t112!'~i(11 e . forOccupancy of: Section. dl6 ¢i~2, Township. )""::/&!~-.Jv' " Range .Jqzj;;'tf./Marshall County, South Dakota . --n '. \. .. . . -11/6 /~ #,?/cZ" '. ,-...-

A Sketch showing the approximate location and approximate elevation is to be attached.

.Applicant will ensure the township road and ditch will be properly restored to ori.~ conditionand the necessary safety precaut.i,ons will be taken during construction work. The wo'rk to be .completed, if required, in the future will be at no further expense to the township. The townshipboard or their designate will determine, in good faith, when road and ditch are properly restoredto original condition. Applicant will provide township with proof of liability coverage and shallhold township haimless from any claims arismg fr0!TI work done by applicant.

This illstallation win comply with the national' safetY cod~. A marker sign will be installed whereappropriate..

Submitted:--~I-----7'-----

Engineer-DeSi:yaLL~_... ' '. . ~ /l/'

Approved: '._ -'- ·7- /9 ..... 6'6 . _

TownsbiPBoard~ uJ~-'i::J~ 'Q~ 5 uf----.·~~~tL~· ~uQ~

Telephone: (605) 448-

Page 30: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

r SEE NOTE 2

wz::i

:::........

PIPELINE~0::

MARKER ~

NATURAL, IGROUND \

.~~~~~..'~~l/'W

4' MIN.

51 51~t::: !::::o· 0'

~I 01 ~I«o. 0 O.0::: 0:: 0:::

(3-11 (3-1 ~I

wZ

::i ~PIPELINE .::: MARKER........ .

, 0:: r TEST LEAD

l '4' MIN. Ip'

TYP. I

T .<,i-%~..~~.*{{f.."'< ..~.. 4' MIN. COV.

" • S~E NOTE .3 I

PROFILEN.T.S.

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE. WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITIED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITIlNG AUTHORITY PRIOR TO INSTALLATION.

lYPICAL BORED CROSSING OF

COUNlY ROAD BY UNCASED PIPELINE

PRODUCT: CRUDE OILCARRIER PIPE: 30"0.0. X 0.515" W.T.,

API 5LX-70 DSAW PIPE W/1-2 TO 14 MILSFUSION BONDED EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY COATEDFOR CORROSION CONTROL

PIPELINE TO BE CA,THODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULATIONS(LATEST EDITION)TRAFFIC TO BE MAINTAINED DURING 'INSTALLATIONPIPEI..INE TO BE INSTALLED BY BORING TECHNIQUE.

UNIVERSALENSCO. INC.

'~' I ~ I..... 0 5 2e ...... t.?> T!::,,'~~~~daKEYSTONE PIPELINE PROJECT

NO.1 DATE II I

REVISIONS

DESCRIPTIONDRAWN BY: ·UEI

I BY ICHKoIAPPR CHKD. BY::

I I I APPR. BY:

Dt\TE: 12/19/07 APPROVEDDATE: -------,EN=GI"""NE::;:E""'RIN:-:::G~MA:-;-;NA-;-;;G;-;:::;ER:;-

DATE: DRAWING NO. I REV.

Page 31: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FO~OCCUPANCYOF TWP. ROAD AND RIGHT - OF - "VAY

To: The township board of~1.iUI~~r1ownshirtli1:SmI(h DakotaApplicapon is made by: f rn .' (lonqd't. - K-eL(S TW.. loe-!l/1 € forOccupancy of: Section. 4.3 ic:t6, Township ;r-/,2.£/1/' ' ,Range g$CfWMarshall County, South Dakota·,· . I" "\,.~ » - -

. . ' /02~ If./C/- STrdZ'g;/ .

A Sketch showing the approximate location and approximate elevation is to be attached.

The following information is pertinent to the proposed' installation:

l~ Intended usage: C!yud-e &/ IJjJelr~e

2. Size and Type: 30/1 6/-eel j}jOf:..3. Outside diameter: 30·/f .

4. Method of installation: !lt9r~ .Applicant will ensure the .township road and ditch will be properly restored to origiQ.al conditionand the necessary safety precautions will be taken during construction work. The wo'rk to becompleted, if required, in the future will be at no further expense to the township. The townshipboard or their designate will determine, in good faith, when road and ditch are properly restoredto original condition. Applicant will provide township with proof of liability coverage and shallhold township haimless from any claims arising fro~ work done by applicant.

. .This installation will comply with the national safety code: A marker sign will be installed whereappropriate.

.2'0'("~~d

Submitted: ------.-"l-----r-----

Engineer- Desiwyl3~d~Approved: ' ...._ ',/--)0;"': O'q' ../YJ./l/Township Board:~~~."'-. .>

_~c>.'~ 13~

'/~~~1ic::

Recommended for Approval

Telephone: (605) 448-

Page 32: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

'j SEE NOTE 2

COV.

. wz:J PIPELINE;:: (MARKER

~ JJ( /TEST LEAD

4' MIN. I~TYP. I

13 1 13 11-' 1-'is: is:

~I 01 ~I<:o. 0 o.0::: 0:: 0:::

~I ~. ~I

wz:J

COV. 15' MIN. 6' MIN. 5' MIN.COV. COV. COV.

--=¥ii818f;,' .'.:: '.:.:.: .·:'r:l!:~;'~:: ..:.:~:..):C::::;·:', .:':,.:f.i.l;::::.;.::.~:.:: ·;:.!;;;;'1;::·:.:·::;::..::::·t;.~t:,:::;:;.'~,.;.:·::x.:,g': ::.:.; :' ..:;;'i'i'!:¥¥E'"'""'" -

;::"­

PIPELINE"._0:: IMARKER "'-

NATURAL, IGROUND \

..*~~~\~,'~~0~

4' MIN.

'1 SEE NOTE' 3 ·1

EROFlLEN.T.S.

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PI;RMITIED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD· R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTH.ORITY PRIOR TO ·INSTALLATION.

lYPICAL BORED CROSSING OF

COUNlY ROAD BY UNCASED PIPELINE

PRODUCT: CRUDE OILCARRIER PIPE: 30"0.0. X 0.515" W.T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY COATEDFOR CORROSION CONTROL

PIPELINE TO BE CATHODICALLY PROTECTEDPIPELINE DESIGN ASPER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULATIONS(LATEST EDITION)TRAFFIC TO BE MAINTAINED DURING INSTALLATIONPIPELINE TO BE INSTALLED BY BORING TECHNIQUE.

UNIVERSALENSCO. INC.

'.... ::s:t IXi 7' ~~ T!b:~~~~eJ~~daKEYSTONE PIPELINE PROJECT

r:-r_---:--r --=-R=EV=-=IS:-:::IO=N::-:S::-:-:-__~r=:-c=-=~::-:=~DRA~W::::N~BY::.::~U::.::El~4ID~t\TE~::.....:..:12:L./.:.:19t.:./O:.:..7-1IAPPROVEDNo.1 DATE I DESCRIPTION IBY ICHKoIAPPR CHKD. BY:: IDATE: I

I APPR. BY: IOATE: IORAWING NO.ENGINEERING MANAGER .

I REV.

Page 33: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

Recommended for Appr6val

APPLICATION FO~OGCUPANCYOF TWP. ROAD AND RIGHT - OF - 'NAY

To: ?,e.to":,,ship board.5.,<rez:::TownshiriL.uth DakO.taApplIcap.on IS made by: I Van' ~ n,d; - Kf:-Lts Ail.. loe../rl1-€ forOccupancy of: Section. /¥~~23 ,Township. T/:'1s-'1l/ - I , Range Iw1111Marshall CoUnty, So~th Dalcota/tfI.;/ ~:5Tro.e.bt .

A Sketch showllg the approximate locatio"-n andapproximate elevation is to be attached.

The following information is pertinent to the proposed' installation:

1. Intended usage: {lY'ucl-e 62I f}~e..IrI1-e

2. :Size andType: 30/1 ' (Sf-eel f};:J e..

3. Outside diameter: 30 I,f.

4. Method of installation: , (Jj&.V'e..u-~. .

Applicant will ermure the .toWnship road and ditch will be properly restored to ori~ conditionand the necessary safety precautions will be taken during construction work. The wo'rk to becompleted, if required, in the future will be at no ~er expense to the township. The township'board or their designate will determine, in good faith, when road and ditch are properly restoredto original condition. Applicant will provide township with proof of liability coverage and shallhold township haimIess from any claims arismg fro~ work done by applicant.

. .This installation will comply with the national safety code. A marker sign 'will be installed whereappropriate.

Submitted: '

Engineer-Desi~;Z~

Approved: . . __ .:-...., 7' -- / ~ >- 0 ~ /17~Township Board:~/'W~tt":~ '.-'~

..~~&~--~~.~~ Ai-,.s~ .. -:='W<:

Telephone: (605) 448-

Page 34: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

-'~:..."-----------------------------.....;.------------,

~a::: TEST LEAD

((IF SFACING GREATER

I TI-lAN 1 MILE) .

rh~~~ ~~."'~.(<<~W. I"';-,....."",-'" '- .

4' MIN. COV.

w 'PIPELINE 5MARKER~(ONE SIDE ONLY" ~

OR IN FENCE LINE a:::IF PRESNET)

NATURAL, IGROUND \

*~~~~'­'~/~0~4' MIN. COV. 5' MIN.

COV.

gsl

~ Ilga::: ...J

o Z..J 0!::!(i=I.J.. u

~I~

5' MIN.COV.

wz::J

".r SEE NOTE 2

I· SEE NOTE 3

PROFILEN.T.S.

NOTES:

1. CROSSING SHALL BE CONSTRUCTED ·IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A MINIMUM OF4.0 D. OF COVER EXCEPT WITHIN ROW AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITIING AUTHORITY PRIOR TO INSTALLATION.

PRODUC~ CRUDE rnLCARRIER PIPE: 30"0~D.X 0.515" W.T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY .

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY COATEDFOR CORROSION CONTROL .

PIPELINE TO EiE CATHODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF' PART 195

OF THE CODE OF FEDERAL REGULATIONS(LATEST EDITION)TRAFFIC TO BE MAINTAINED DURING INSTALLATIONPIPELINE TO BE INSTALLED BY OPEN CUT

~~ r!:,~;~~.~daKEYSTONE PIPELlNF PROJEf:T

lYPICAL OPEN CUT CROSSING OFFIELD ROAD OR SECTION LINE

BY. UNCASED PIPELINE

NO.1 DAlE IREVISIONS

DESCRIPTIONDRAWN BY: UEI IDATE: 12/31/07 IAPPROVED

ISY!cHKoIAPPR CHKD. BY:IDATE: , -----;::EN~G=:IN:;::;:EE:;:;;RI:;;;NG::-:M;7;A7:';NA~GE;::;::R;--

Page 35: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

Recommended for Approval

APP:LICATION·FO~O(:CUPANCYOF TWP. ROAD AND RIGHT - OF - WAY

To: Tho township board of~~U,.t~r'r Townshi.,tBri~ South DakotaApplica:tion is made by:"Va n~r?;~da... .- Kf:.-1.t:5~ Jt2?/lJ1 € forOccupancy of: Section. ,1/ <'f.il'i 'Township7J!2'S-iti - I , Range 4sqW'Marshall County, South Dakota . . . ~' _._

. /~7L .e5r~f·-'·

A Sketch showing the approximate location and approximate elevation is to be attached.

The following information is pertinent to the proposed installation:'

1. In!ended usage: ~yud-e &I /}-pelr'rr e

2. Size and Type: 30 If Sf-eel ;:;;J.e..

3. Outside diameter: 30 If,

4~'Methodof installation: tlftzAJ ev:rApplicant will ensure the .township road and ditch will be properly restored to origiQal conditionand, the necessary safety precautions will be taken during construction work. The wo'rk to becompleted, if required, in the future will be at no further expense to the township. The townshipboard or their designate will determine, in good faith, when road and ditch are properly restoredto original condition. Applicant will provide township with proof of liability coverage and shallhold township haimless from any claims arismg fro~ work done by applicant.

. .This installation will comply with the national safety code. A marker sign will be installed whereappropriate.

Submitted:

Engineer- D-Oci:Y-74-Ae-0--:;t'-~L-a;-~.~.... , '. . ""?....v

Approved: . .. -..... 7 - { c; ....- C? 8' .Towns~PBoard:~- ~~2~.c._~__ ·_·-·

__-----"''E-r__..~ <Sl~ s, up,~~~ ·~b ~ <~1--~,

Telephone: (605) 448-

Page 36: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

.W

PIPELINE ~

MARKER~~(ONE SIDE ONLY ~OR IN FENCE LINE a:IF PRESNET)

NATURAL, \ IGROUND \

*~~~\.·W»'f. '7~7"", /'.'/,;(/,;(/4' MIN. COV. 5' MIN.

COV.

~I~ II~o _a: ...J

Cl Z...J 0~Ii=1..1.. u

~I~

5' MIN.COV.

.r SEE NOTE 2

wz:J

3:.........a: TEST LEAD

((IF SFACING' GREATER.

I THAN 1 MILE)r ,."~0%~~~~~"""'<"""<

4' MIN. COV.

I· , SEE NOTE 3

PROFlLEN.T.S.

--I

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PIPE 'SHALL HAVE A MINIMUM OF4.0' FT. OF COVER EXCEPT WITHIN ROW AS SHOWN.

3. ,MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTALLATION.

1YPICAL OPEN CUT CROSSING OFFIELD ROAD OR SECTION LINE

BY UNCASED PIPELINE

PRODucn CRUDE rnLCARRIER PIPE: 30"0.0. X 0.515" W. T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM bPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY eOATEDFOR CORROSION CONTROL .

PIPELINE TO BE CATHODICALLY PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL· REGULATlONS(lATEST EDITION)TRAFFIC TO EiE MAINTAINED DURING INSTALLATIONPIPE;L1NE TO E?E INSTALLED BY OPEN CUT

/"71' ITS :"',UNIVERS AL

DiSCO. INC.

\~;;Ii~)...... \//,

,;.?> TransCanada". In bU'Sine~ to deliverKEYSTONE PIPELINE PROJEr.T

REVISIONS

DESCRIPTIONDRAWN BY: UEI IDATE: 12/31/D7, IAPPROVED

IBY !c!iKDIAP,P,R'...C::.;H;.;.:KD:;....::.;BY.:..:__--iIJ,::;IDA.:.:..;TE:;...: --ill---_-_-_-_-_-_~-;::;E:::.:N~G~I:.:.::N;:;:E=E:;:;;R=I-;;;N=G=:MSA~NA::;.-;:;=GE~R=-1

Page 37: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

Recommended for Approval

APPLICATION FOR OCCUPANCYOF TWP. ROAD AND RIGHT - OF - 'tVAY

To: The.to~p board3$rW!!'rFTownshiCriiL.outh DakotaApphca:tlOn IS made by: {h:tn'~ qc;l - Keys .. I t:Je-1r11 € forOccupancy of: Section, ('21=41,: ,Township''T/~A/ ' ,Range ifs-qWMarshall County, South Dakota h' t!j -:r1 ~ ~.'. . _'I 'IA/ -=' .f ;-aaz.,'/--,:'"' .

I .'. ..

A Sketch showing the approximate locatio~ and approximate elevation is to be attached.

The folluwing information.is pertinent to the proposed' installation:

,1. In~ended usage: ~rc.rd€ &/ f)pe/'rr e

2. Size and Type:, 30/1 Sf-eel f};Je.

3~ Outside diameter: 30 If,

4. Method of installati~m:j1&.re..:-

Applicant will ernure the ,township road and ditch will be properly restored to origiqal conditionand the necessary safety precautions will be taken during construction work. The wo'rk to becompleted, if required, in the future will be at no further expense to the township. The townshipboard or their designate will determine, in. good faith, when road and ditch are properly restoredto original condition. Applicant will provide township with proof of liabIlity coverage and shallhold township harInless from any claims arising fr0!ll work done by applicant.

This installation will comply with the national safety cod~.·A marker sign will be installed ~hereappropriate.

Submitted: -'--74-----:r-----

Engineer. DeSi?J#Ztd~

Approved:. &'"--. 7~' /1 ~ 0 1S;" "-'h" .,' ~

TownsmpBoard:· -~ ~..-Q..

,.]?)~~ a~ 5 ();?,

Telephone: (605) 448-

Page 38: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

SEE NOTE 2

wz:J

~"'­

PIPELINE ..........0::

MARKER '"

. NATURAL, IGROUND

. .

*~~~~,'~~~'W4' MIN.

51 51t:: t::o· 0.'

~I ~I ~IO. 0 o.0::: 0:: 0:::

~I ~ .~I

COV. 15 ' MIN. 6' MIN. 5' MIN'jCOV. COV. COV.

wz:JrPIPELINE~. MARKER"'-~ (TEST LEAD

4' MIN. IpTYP. I

COV.

~I::·~·;::·;·;H'\" .•··..~,:.:·.:;i·.:!t,~ ..:::~:~~i;'~;;,:;:;.::·~:;;::::~:,:::,~,;::: ..~:~::::;Cg,,:::~:.::::;., .•;·.:':}:..:.;t·:~::.::~:;·,~~::,~~@9¥EI··

SEE NOTE .3

PROFlLEN.T.S:

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A MINIMUM OF4.0 FT. OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

.3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R:O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR.TO INSTALLATION.

TYPICAL BORED CROSSING OF

COUNTY ROAD BY UNCASED PIPELINE

~.. ·hTranscanada--'J In business to deliverKEYSTONE PIPELINE PROJECT

5 ??

UNIVERSALENSCO. INC.

1..... 51' I Cit;;»

PRODUCT: CRUDE OILCARRIER PIPE: .30"0.0. X 0.515" W. T.,

API 5LX-l0 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY AND26 MILS URETHANE EPOXY C9ATING

MINIMUM TEST PRESSURE: ·1,801 PSIGMAXIMUM QPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE TO BE EXTERNALLY COATEDFOR CORROSION CONTROL

PIPELINE TO BE CATHODICALLY PROTECTEDPIPELINE DESIGN A'S PER REQUIREMENTS OF PART 195

OF TtlE CODE OF FEDERAL REGULATIONS(LATEST EDITION)TRAFFIC TO BE MAINTAINED DURING INSTALLATIONPIPELINE TO BE INSTALLED BY BORING TECHNIQUE.

No.1 DATE I..REVISIONS

DESCRIPTIONDRAWN BY: UEI

I BY ICHKolAPPR CHKD. BY::

1000TE: 1'2/19/07 (APPROVED

IDATE: I ----":=:EN":'::G=IN=EE""'RI""'NG::-:":"MA""NA""'G.-;:'ER..--I""C"'III"''''' 1\,11""\

Page 39: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

_..

C;" :l - . :2t?C/ i> .

I??r:'j1etJ z._.c;..~

TV-e.. I.e..),P~- r

I. !iI

Iji

II

I

I .I

Ii!i\!i

I. I:,iJ.

\

!

~~W~&;¥/A-:r7? pc..-,?9rV

Page 40: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

Performance Bond forWork in Public Right of Way

Bond Number: SN4227

KNOW ALL MEN BY THESE PRESENTS That TransCanada Keystone Pipeline LP, asPrincipal and Travelers Casualty and Surety Company .of America, a corporationorganized and existing under the laws of the State of Connecticut, and duly authorizedto transact a corporate surety business in the State of South Dakota, as Surety, are heldand firmly bound unto AndoverTownship, Day County. South'Dakota, as OBLIGEE,and unto such other whose benefit this obligation is intended to run, in the penal sum ofTwo Hundred and Fifty Thousand Dollars --------00/100 ($250,000.00), to be paid untosaid parties, their successors and assigns, for which payment we jointly and severallybind ourselves and each of o'ur heirs, legal representatives and successors, firmly bythese presents.

WHEREAS, the Principal desires to carry on the business of hauling in public rights ofway in the Andover Township, Day County, South Dakota for the period commencingJuly 14, 2008.

NOW THEREFORE, THE CONDITIONS OF THIS BOND ARE THAT:

A. Said Principal shall in all respects comply with and will faithfully perform allthings required by County or State law, and by any permits issued thereunder: and .

B: Said Principal shall indemnify, save and keep said obligee, and its officialsand employees harmless of and from any claims, damages, liabilities, losses,actions, suits, or judgements which may be presented, sustained, brought orobtained against said Obligee or its officials,·or employees because of saidconstruction, or by any'accidents caused by or resulting there fr,om: and

C. Said Principal shall pay all damages imposed upon it for violation of anyCounty of State Law or conditions of any permit issued there under: and

D. Said Principal shall replace or perform again in a faithful and adequatemanner all work and materials to areasonable standard, which are not inaccordance with the applicable county or State law and permits; and

E. Said Principal shall faithfully satisfy all judgements based on tort liabilitywhich are obtained by reason of negligence through said construction whichnegligence is att~ibutableto said Principal or his agent;

F. In no event shall the aggregate liability of the Surety hereunder exceed thepenal sum stated above.

G. If th~ Principal shall satisfy all of the above conditions then no obligation shallarise under this bond.

If the principal fails to perform any of the above conditions, then the Principal and Suretyshall be liable under this bond to the extent necessary to satisfy the breach of conditions.

The surety herein shall have the right to withdraw as surety from this bond and may doso Lipon giving the Obligee and said Principal 30 days written notice to that effect, 'whereupon, except as to any liabilities or indebtedness incurred or accrued prior to thetermination of said 30 day notice the liability of the Surety under this bond shall cease,and the said bond shall thereup<?n terminate and be of no more force or effect.

Page 41: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

IN WITNESS WHEREOF, we have hereunto set our hand this 14\ day of July, 2008.

. f'fii~~TransCanada KeystonelLP, By it's General Partner,TransCanada Keystone Pipeline GP, LLC

By: j!d~ S\--~~. . -. /.1rl~':Ch:-\7)7 .

Travel rs Casualty and Surety Company· of America

By: -='----, _

Page 42: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

~

TRAVELERSJPOWER OF ATTORNEY

Farmington Casualty Compan)'Fidelity and Guarant~' Insurance Compan}'Fidelity and Guaranty Insurance Underwriters. Inc.Seaboard Surety CompanySt. Paul fire :md Marine Insurance Compan~'

St. Paul Guardian Insurance Compan)'St. Paul Mercury Insurance CompanyTra"elers Casual~' and Surety CompanyTravelers Casual~' and Surety Company of AmericaUnited States Fidelity and Guarant)'Company

Attorney-In Fact No. 219252 Certificate No. 00 20300 50KNOW ALL MEN BY THESE PRESENTS: That Seaboard Suret)' Company is a corporation duly organized under the laws of the State of New York. that St. PaulFire and Marine Insurance Company. St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the lawsof the State of Minnesota. thaI Farmington Casualty Company. Travelers Casualty and Surety Company. and Travelers Casualty and Surety Company of America arecorporations duly organized under the laws of the Srate of Coimecticut. that United States Fidelity and Guaranty Company is a corporation duly organized under thelaws of the State of Mal}'land, thaI Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the StaLe of Iowa. and that Fidelity aildGuaranty Insurance Underwriters. Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Compnnies"), and thatthe Companies do hereby make. constitute and appoint

Deb Stanton, Mark Shaul, Murray Epp, Tim Gale, and Lois Innes

of the City of Calgary, Alberta , State of Canada , their true and lawful Attorney(s)-in-Fact,each in their separate capacity if more than one is named above, to sign. execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings andother writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the perfonnance ofcontracts and executing or guaranteeing bonds and undertaldngs required or permitted in any actions or proceedings allowed by law.

26thIN W.ITNESS:\lIb'HEREOF, the ComwBi.es have caused this instrument to be signed. and their'corporate seals to be hereto affixed, this _Octo er . 'Z UI .. , ...~~ .

Farmington Casualty CompanyFidelity and Guarant~' Insurance CompanyFidelity and Guaranty Insurance Undenvriters, Inc.Seaboard Sure~' Compan~'

St. Paul Fire and Marine Insurance Company

St. Paul Guardian Insurance CompanySt. Paul Mercury Insurance CompanyTravelers Casualty and Surety CompanyTravelers Casualty and Sure~' Company of AmericaUnited States Fidelity and Guaran~'Company

State of ConnecticutCity of Hartford ss.

By:

26th October 2007On this the day of ,before me personally appeared George W. Thompson, who acknowledged himselfto be the Senior Vice President of Fannington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters. Inc.,Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, TravelersCasualty and Surety Company. Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, beingauthorized so to do. executed the foregoing instmment for the purposes therein conlnined by signing on behalf of the corporations by himself as a duly authorized officer.

In Witness '''''hereof, I hereunto set my hand and official seal.My Commission expires the 30th day of June. 2011.

58440-5-07 Printed in U.S,A.

Page 43: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

WARNING:THIS POWER OF ATIORNEY IS INVALIDWITHOUTTHE REO'BORDER--'0'I,l,.

This Power of Attorney is granted under and by the authority of dle following resolutions adopted by the Boards of Directors of Fanninglon Casualty Cl;lInpany. Fidelityand Guaranty Insurance Company, Fidelity and Guaranty Insurance Under.vrit~rs, Inc., Seaboard Surety Company, St. Paul Fire and Marine IJ:lsurance Company.St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and' Surety Company, Travelers casualty and Surety Company ofAmerica, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows:

RESOLVED, that the Chainnan, the President, any Vice Chainnan. any Executive Vice President, any Senior Vice President. any Vice President, any Second VicePresident, the Treasurer,any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to aCI for and on behalfof the Company and may give such appointee such authority as his or her certificate of authority m~y prescribe to sign with the Company's name and seal wiLh theCompany's seal bonds. recognizances, contracts of indemnity, and other writings 'obligatory in the nature of a bond, recognizance. or conditional undertaking, and anyof said officers or the Board of Directors at any time may remove.any such appointee and revoke the power given him or her; and it is

FURTHER RESOLVED, that the Chainnan, the President, any Vice Chairnlan, any Executive Vice P~esident, any Senior Vice President or any Vice President- maydelegate all or any part of the foregoing authority to one or'more officers or employees of this Company, provided that each such delegation is in writing and l:! copythereof is filed in the office of the Secretary; and it is.

FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertakingshall be valid and binding upon the Company when (a) signed by the Preside!)t, any Vice Chainnan, any Executive Vice President, any Senior Vice President or any VicePresident, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary. and duly attested and sealed with theCompany's seal by a Secretary or Assistant Secretary; or (b) duly ~xecuted (under'seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the powerprescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; nnd it is \

FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President,any AssistantVice President, any Secretary, nny Assistant Secretary, and the seal of the Company may be affixed by facsimile to any power of anorney or to any certificaterelating thereto appointii)g Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds andundertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall bevalid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on theCompany in the future with respect to any bond or understanding to which it is attached. .

I, Karl M. Johanson, the undersigned, Assistant Secretary, ofFannington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insuran.ceUnderwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insuranc~ Company, St. Paul Guardian Insurance Company, St. Paul Mercury InsuranceCompany, Travelers Casualty and Surety Company, Travelers Casualty and Surety €ompanyof\America,,'and United States Fidelity and Guaranty Company do herebycenify that the above and foregoing is a true and co~ct copy of the Pow;r,.c(p..\t~~ey,._~~e~u[~d by, s~cfCompanies, which is in full force and effect and has not beenrevoked. \:: " \;. <; ~. :'

".

Kori M. Johans

To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney-In-Fact number, theabove-named indi\'iduals and the details of the bond to which the power is attached.

Page 44: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

.~D~~~~r_~_~_~ ~ _

:Ji;JJ~.. .

.---1-----'---------

.- _.... _-_._--_ .

._--_.-\----_--.:..

Page 45: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

APPLICATION FOR OCCUPANCYOF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of 0;.y 1"19 -1 . TOwns;",~ Soujh DakotaApplication is made by: --rV,;utif?onqda.. - KffiS ~ Jt?e../'11 f for .Occupancy of: Section 5.2 ~ .ItI. • , Township I 8 . - , • Range - S'q-w.Marshall County, South Dak:Qta~ I ~ ? _V . 5"9 W

tv 1 '- Jf!J{,tJ, 5/A Sketch showing the approximate location and approximate elevation is to be attached.

The follQ\.v1ng information is pertinent to the proposed installation:

1. Intended usage: /} IJ.., f"J/' -1 ItCr-uoft VI IIjJe./rrce

2. Size and Type: 30 !f C5 feel f}~e.

3. Outside diameter: 30 {f

4. Method of installation: . (6<!J re,

Applicant will ensure the township road and ditch will be properly restored to origiI)al condition·and the necessary safety precautions will be taken during construction work. The work to becompleted, if required in the future will be at no fUrther expense to the township_ The townshipboard or their designate will determine, in good faith, when road and ditch are properly restoredto original condition. Applicant will provide township with proof of liability coverage and shallhold township hannless from any claims arising from work done by applicant.

This installation will comply with the national. safety code. A marker sign will be installed whereappropriate.

Submitted: -----"74--~---",...-----

Eogineer-DeSi~fZ-/L~Recommended for Approval

? J/ 'U- Joo8Approved: -;-__"'::"-",,-,-;t"-c/-~..:..7 --7''''T- :::;:-- 7- _

Telephone: (605) 448-

Page 46: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

page 1 or '1.

(APPLICATION FOR OCCUPANCY

l .

OF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of Do-'f ~""'- Township, Britton, South Dakota

Application is made by: \('~el¢) ....... o--c\o.....- K'--it>\-0l'\L- ~"J~~e...... for

Occupancy of: Section ~c.~3S" ,Township . I'Z.cg' AJ , Range 51' W .(OS~~r~d-

Marshall County, South Dakota

A Sketch showing the approximate location and approximate elevation is to be attached.

The following information is pertinent to the proposed installation:

1. Intended usage: (.,,.~e.- 0; \ \=>: "e.-\~""-e..-

2. Size and Type: ~C> " ~\-e.-c--\ ~" .p e......

3. Outside diameter: 30 .,. .

4. Method ofiIistallation: Do\'"e.--

Applicant will ensure the township road and ditch will be properly restored to original condition andthe necessary safety precautions will be taken during construction work. The work to be completed, ifrequired in the future will be at no further expense to the ·township. The township board or their

. designate will determine, in good faith, when road and ditch are properly restored to originalcondition. Applicant Will provide township with proofof liability coverage and shall hold townshipharmless from any claims arising from work done by applicant.

This installation will comply with the national safety code. A marker sign will be installed whereappropriate.

Recommended for Approval Submitted: T"C'o.-:P~ \<,e..Yi:>'h:,.-...::... ?~fcJ.~ V'-e.-, ~~ "'~ \\~~ Cf;;'?:>~ - orS.... .r~"":f-5

Engineer- Design l)v..~u -<J-~ kv..:f<;0. ',.. .' ~D\......v-~1 '~d\~

~ Approved:Z~Q~vvgtL]~~., XTownshiPBoarQhY ?4,.......---e;. d~.-/~~~'-'

..:..

Page 47: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

(

(

rage L. or I..

Telephone:(605)44S,5SJ 7 ;t-'YrJ!~ -~ x~t;}..~~

Page 48: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

_I SEE NOTE 2

SEE NOTE 3

51 51t=: t=:0' 0'

~I OJ ~I«0, 0 0,0::.: 0::. 0::.:

~I (;7l ~I

COV.

·1

wz:J PIPELINE3: (MARKER

l ~ }}(I-TEST LEAD

4' MIN. IlrTYP. il

5' MIN.!COV. ,

. ~. '. -':". . . ......,.. ". ," _. _.

COV. I5' MIN. 6' MIN.

COV. COV.

:-, .. , ..'- - ... " ....:

wz:J

3:........

PIPELINE -.........0::. IMARKER '"

NATURAL\ IGROUND \

'*~~~~,'~~D-»~4' MIN.

PROFILEN.T'.S.

NOTES:

1. CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS.

2. BENDS SHALL NOT BE PERMITTED WITHIN THE ROAD R.O.W. THE PIPE SHALL HAVE A MINIMUM OF4.0 fL OF COVER EXCEPT UNDER ROAD DITCHES AS SHOWN.

3. MAXIMUM JOINT LENGTHS SHALL BE USED TO MINIMIZE NUMBER OF WELDS IN THE ROAD R.O.W.

4. CONTRACTOR TO NOTIFY RESPONSIBLE PERMITTING AUTHORITY PRIOR TO INSTALLATION.

TYPICAL BORED CROS$ING OF

COUNTY ROAD BY UNCASED PIPELINE

PRODUCT: CRUDE OILCARRIER PIPE: 30"0.D. X 0.515" W.T.,

API 5LX-70 DSAW PIPE W/12 TO 14 MILSFUSION BONDED EPOXY AND26 MILS URETHANE EPOXY COATING

MINIMUM TEST PRESSURE: 1,801 PSIGMAXIMUM OPERATING PRESSURE: 1,440 PSIG

CARRIER PIPE T'O BE EXTERNALLY COATEDFOR CORROSION CONTROL

PIPELINE TO BE CATHODICALLY ,PROTECTEDPIPELINE DESIGN AS PER REQUIREMENTS OF PART 195

OF THE CODE OF FEDERAL REGULATIONS(LATEST EDITION)TRAFFIC TO BE MAINTAINED DURING INSTALLATIONPIPELINE TO BE INSTALLED BY BORING ,TECHNIQUE.

UNIVERSALENSCO, ItlC.

I .... 3d, I Xi ?' ~~ T!:~~~~,~:daKEYSTONE PIPELINE PROJECT

No.1 DATE II

REVISIONS

DESCRIPllONDRAWN BY: UEI

I BY ICHKoIAPPR CHKD. BY:I I APPR RY.

ID(\TE: 12/19/D7 IAPPROVED

IDATE: I ----E;:;-N~GI;;-;;NE=;::E;:;;RIu;NG;-;;;MA~NA.-;:;G:-;::;ER.-InA'TF· IDRAWING NO. I REV.

Page 49: 1-- ---.:.--1€¦ · PRODUCT: CRUDE OIL CARRIER PIPE: 30"0.0. X 0.515" W.T., API 5LX-70 DSAW PIPE W/12 TO 14 MILS ... A Sketch showing the approximate location and approximate elevationis

.page 1 ot'l.

APPLICATION FOR OCCUPANCY

OF TWP. ROAD AND RIGHT - OF - WAY

To: The township board of 1)0...1 ~V'\. Township, Britton, South Dakota

Application is made by: \r-p..""'-e.~""& )(~te'-ton.c... ?; (2c......\:11". e.... for

Occupancy of: Section IY ~~Township --1 'Z..~ JJ ,Range 59 kl. . \ O'3~ S\-c:- .

Marshall County, South Dakota

A Sketch showing the approximate location and approximate elevation is to be attached.

The following information is pertinent to· the propo'sed installation:

1. Intended usage: c..f"~~ 0: \ ~~~~_t~E-.

:?jQlI2. Size anc~ Type: 'C::>

3. Outside diameter: ~Olr

4. Method ofiIistallation: ~ore.-

Applicant will ensure the township road and ditch will be properly restored to original condition andthe necessary safety precautions will be taken during construction work. The work to be completed, ifrequired in the future will be at no further expense to the township. The toWnship board or theirdesignate will determine, in good faith, when road and ditch are properly restored to originalcondition. Applicant will provide township with proofofliability coverage and shall hold townshipharmless from any claims arisjng from work done by applicant.

This installation will. comply with the national safety code. A marker sign will be installed whereappropriate.