09 C2.5 InternalStripingAndSignagePlan...C2.5 05/25/17 000 SHALL BE THERMOPLASTIC MEETING NCDOT...

1

Transcript of 09 C2.5 InternalStripingAndSignagePlan...C2.5 05/25/17 000 SHALL BE THERMOPLASTIC MEETING NCDOT...

Page 1: 09 C2.5 InternalStripingAndSignagePlan...C2.5 05/25/17 000 SHALL BE THERMOPLASTIC MEETING NCDOT REQUIREMENTS AND HAVE ANTI-SLIP PROTECTION. ALL OTHER STRIPING SHALL BE PAINTED WITH