08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for...
-
Upload
gereon-geiser -
Category
Documents
-
view
107 -
download
2
Transcript of 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for...
![Page 1: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/1.jpg)
08.04.2005 | Folie 1
Part 1: CCIAV research in Austria
FFCUL
Lisboa
Martin König
Department forSustainable Development
Austrian Bureau for Climate Change
Federal Environment Agency
![Page 2: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/2.jpg)
08.04.2005 | Folie 2
StartClim - structure
Administrative CO:Umweltbundesamt
Scientific CO:BOKU-Met
Scientific council (experts from D and CH)
Steering committeeFinanciers: Ministries, insurances, PPP
con
tracts
adm
inis
trat
es
rep
ort
s
consults
consults
manages
Sub-contracting viaBOKU-Met
con
sults
Pool of projects with flexible scientific content2003: extreme weather events/floods; 2004: heat waves, droughts and theirimpacts on Austria; 2005: climate change and healthFlexible budget/financiers:2003: 500.000 EURO; 2004: 150.000 EURO; 2005: probably some 200.000 EURO
![Page 3: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/3.jpg)
08.04.2005 | Folie 3
StartClim 2003
Project management
IMP / BOKUUmweltbundesamt
Scientific council international experts
(CH, D, I)
Steering committeeof the financing institutions
OENB, Austrian hail insurance,BMBWK, BMLFUW, BMWA, UBA,...
analysis ofextreme weatherevents (impacts,socioeconomicdimension and
scenarios
longtermconcept forclimate and
climateimpact
researchin Austria
Modul b:Modul b:Modul a:Modul a: Modul c:Modul c:
meteorologicalsynopsis of theflood event 2002
![Page 4: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/4.jpg)
08.04.2005 | Folie 4
StartClim2003 - projects
StartClim.1: Quality control and statistical characteristics of selected climateparameters on the basis of daily values in the face of Extreme ValueAnalysisCentral Institute of Meteorology and GeodynamicsWolfgang Schöner, Ingeborg Auer, Reinhard Böhm, Sabina ThalerStartClim.2: Analysis of the representativeness of a data collected over a span offifty years for the description of the variability of climatic extremesCentral Institute of Meteorology and GeodynamicsIngeborg Auer, Reinhard Böhm, Eva Korus, Wolfgang SchönerStartClim.3a: Extreme Events: Documentation of hazardous events in Austria such asrock avalanches, floods, debris flows, landslides, and avalanchesInstitute of Forest and Mountain-Risk Engineering,BOKU - University of Natural Resources and Applied Life SciencesDieter Rickenmann, Egon GanahlStartClim.3b: Documentation of the impact of extreme weather events on agriculturalproductionARC Seibersdorf researchGerhard Soja, Anna-Maria SojaStartClim.3c: Meteorological extreme Event Data information system for the EasternAlpine region - MEDEAFederal Environment Agency, Martin König, Herbert Schentz, Johann WeiglIIASA, Mathias Jonas, Tatiana ErmolievaAll reports can be found under http://www.austroclim.at/startclim/index.htm
![Page 5: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/5.jpg)
08.04.2005 | Folie 5
StartClim.4: Development of a method to predict the occurrence of extreme eventsfrom large-scale meteorological fieldsInstitute of Meteorology and PhysicsBOKU - University of Natural Resources and Applied Life SciencesAndreas Frank, Petra SeibertStartClim.5: Testing statistical downscaling techniques for their applicability toExtreme Events in AustriaInstitute of Meteorology and Physics,BOKU - University of Natural Resources and Applied Life SciencesHerbert Formayer, Christoph Matulla, Patrick HaasGKSS Forschungszentrum Geesthacht, Nikolaus GrollStartClim.6: Adaptation strategies for economic sectors affected heavily by extremeweather events: Economic evaluation and policy optionsAustrian Humans Dimensions Programme (HDP-A)Department of Economics, Karl-Franzens-Universität GrazKarl Steininger, Christian Steinreiber, Constanze Binder, Erik SchafferEva Tusini, Evelyne WiesingerStartClim.7: Changes in the social metabolism due to the 2002-floodings in Austria:case study of an affected communityInstitute of Interdisciplinary Studies of Austrian Universities (IFF)Willi Haas, Clemens Grünbühel, Brigitt Bodingbauer
All reports can be found under http://www.austroclim.at/startclim/index.htm
StartClim2003 - projects
![Page 6: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/6.jpg)
08.04.2005 | Folie 6
StartClim.8: Risk-management and public welfare in the face of extreme weatherevents: What is the optimal mix of private insurance, public risk poolingand alternative transfer mechanismsDepartment of Economics, Karl-Franzens-Universität GrazWalter Hyll, Nadja Vetters, Franz PrettenthalerStartClim.9: Summer 2002 floods in Austria: damage account data poolCenter of Natural Hazards and Risk Management (ZENAR),BOKU - University of Natural Resources and Applied Life SciencesHelmut Habersack, Helmut FuchsStartClim.10: Economic aspects of the 2002-Floodings: Data analysis, asset accountsand macroeconomic effectsAustrian Institute of Economic Research (WIFO)Daniela Kletzan, Angela Köppl, Kurt KratenaStartClim.11: Communication at the interface science - educationInstitute of Meteorology and Physics,BOKU - University of Natural Resources and Applied Life SciencesIngeborg SchwarzlInstitute of Interdisciplinary Studies of Austrian Universities (IFF)Willi Haas
All reports can be found under http://www.austroclim.at/startclim/index.htm
StartClim2003 - projects
![Page 7: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/7.jpg)
08.04.2005 | Folie 7
StartClim.12: Developing an innovative approach for the analysis of the August 2002Flood Event in comparison with similar extreme events in recent yearsDepartment of Meteorology and Geophysics, University of ViennaSimon Tschannett, Barbara Chimani, Reinhold SteinackerStartClim.13: High-resolution precipitation analysisDepartment of Meteorology and Geophysics, University of ViennaStefan Schneider, Bodo Ahrens, Reinhold Steinacker, Alexander BeckStartClim.14: Performance of meteorological forecast models during the August 2002floodsCentral Institute of Meteorology and GeodynamicsThomas Haiden, Alexander KannStartClim.Reference database:Implementation of a comprehensive literature data base on climate andclimate impact research as a generally accessible basis for futureclimate research activitiesInstitute of Meteorology and Physics,University of Natural Resources and Applied Life SciencesPatrick Haas
All reports can be found under http://www.austroclim.at/startclim/index.htm
StartClim2003 - projects
![Page 8: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/8.jpg)
08.04.2005 | Folie 8
StartClim2004 – projects
StartClim.A: heat waves and drought periods in AustriaCentral Institute of Meteorology and GeodynamicsStartClim.B: regional climate change scenarios for heat waves and drought periodInstitute of Meteorology and Physics, BOKUStartClim.C: impacts of drought periods on agriculture in AustriaARC Seibersdorf researchStartClim.D: impacts of heat and drought on water management in AustriaCenter of Natural Hazards and Risk Management (ZENAR), BOKUStartClim.E: impacts of heat waves and droughts on human health and well-beeingFederal institute for health (ÖBIG)StartClim.F: Further development of MEDEAUmweltbundesamtStartClim.G: cooperation research-education, school projectsInstitute of Meteorology and Physics, BOKU
NOTE: StartClim is a flexible, “research by emergency” approach
with close contacts to the financing stakeholders
![Page 9: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/9.jpg)
08.04.2005 | Folie 9
FloodRisk
Came up with Flood analyses 2002 Focus: adaptation towards flood events Geographical focus: Danube (and tributaries)
catchment 45 small projects in 10 different WPs Most of the projects already existed No requests for proposals Over one million EURO funding was provided
by two Austrian ministries (BMLFUW and BMVIT) and one Swiss organisation (DEZA)
![Page 10: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/10.jpg)
08.04.2005 | Folie 10
FloodRisk I – structure
Steering committee
Reporting
scientific and strategic synthesis
CO:UBA-A
Scientific CO:ZENAR / BOKU
Scientificcouncil
MeteorologyHydrology
GeomorphologyDanube
Natural hazards
Accounting of economic lossesLegal aspects
Spatial planningDisaster control
Policy
WPs:
as-is analysisand to-be analysis
![Page 11: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/11.jpg)
08.04.2005 | Folie 11
FloodRisk II – planning phase
FloodRisk II is now going towards implementation of flood protection measures in the10 fields/WPs
Not sure yet how cooperation between Austrian provinces and the Federal government will function
FloodRisk might be an interesting programme for CIRCLE as well as for CRUE for some flood-specific activities within the field of adaptation cp. later
![Page 12: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/12.jpg)
08.04.2005 | Folie 12Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 13: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/13.jpg)
08.04.2005 | Folie 13Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 14: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/14.jpg)
08.04.2005 | Folie 14Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 15: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/15.jpg)
08.04.2005 | Folie 15Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 16: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/16.jpg)
08.04.2005 | Folie 16Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 17: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/17.jpg)
08.04.2005 | Folie 17Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 18: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/18.jpg)
08.04.2005 | Folie 18Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 19: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/19.jpg)
08.04.2005 | Folie 19Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 20: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/20.jpg)
08.04.2005 | Folie 20Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 21: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/21.jpg)
08.04.2005 | Folie 21Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 22: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/22.jpg)
08.04.2005 | Folie 22Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 23: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/23.jpg)
08.04.2005 | Folie 23Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 24: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/24.jpg)
08.04.2005 | Folie 24Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 25: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/25.jpg)
08.04.2005 | Folie 25Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 26: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/26.jpg)
08.04.2005 | Folie 26Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 27: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/27.jpg)
08.04.2005 | Folie 27Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 28: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/28.jpg)
08.04.2005 | Folie 28Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 29: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/29.jpg)
08.04.2005 | Folie 29Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 30: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/30.jpg)
08.04.2005 | Folie 30Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 31: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/31.jpg)
08.04.2005 | Folie 31Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 32: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/32.jpg)
08.04.2005 | Folie 32Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D
![Page 33: 08.04.2005 | Folie 1 Part 1: CCIAV research in Austria FFCUL Lisboa Martin König Department for Sustainable Development Austrian Bureau for Climate Change.](https://reader031.fdocuments.net/reader031/viewer/2022013011/55204d7e49795902118cf035/html5/thumbnails/33.jpg)
08.04.2005 | Folie 33Bearbeitung: Umweltbundesamt auf Basis der Modellierung des MPI-M im Auftrag des UBA-D