Structural Shotcrete Specifications
By,
Dudley R. (Rusty) Morgan
AMEC Earth & Environmental,
a division of AMEC Americas Limited
and
Larry Totten
Johnson Western Gunite Company
San Leando, California, USA
SHOTCRETE FOR AFRICA CONFERENCE
Misty Hills Conference Centre
South Africa
-
-
7/28/2019 06 Structural Shtocrete Specifications
2/87
Subject of Presentation
Review of structural shotcrete specifications
Shotcrete construction of:
In-ground parking structure, Calgary Alberta
Seismic retrofit of heritage masonry structure, Vancouver, British
Columbia
Walls and pilasters in 50 storey hotel, Vancouver, BC Whistler 2010 Olympics Bobsleigh/Luge Track
-
7/28/2019 06 Structural Shtocrete Specifications
3/87
In-Ground Parking Structure, Calgary, Alberta
20 m deep soldier pile/timber lagging stressed channels tie-back evacuation
Cloth/bentonite waterproofing membrane system
Reinforced shotcrete perimeter walls
-
7/28/2019 06 Structural Shtocrete Specifications
4/87
Calgary Parking Structure
Preconstruction mock-up of
typical structural steel wall
-
7/28/2019 06 Structural Shtocrete Specifications
5/87
Calgary Parking Structure
Shooting preconstruction mock-up
-
7/28/2019 06 Structural Shtocrete Specifications
6/87
Calgary Parking Structure
Finishing pre-construction mock-up
-
7/28/2019 06 Structural Shtocrete Specifications
7/87
Calgary Parking Structure
Core extracted from pre-construction mock-up for core grading to
prequalify shotcrete nozzlman
-
7/28/2019 06 Structural Shtocrete Specifications
8/87
Calgary Parking Structure
Hoarding installed for cold weather shotcreting
Shotcreting continued at ambient temperatures
as low as -30oC
-
7/28/2019 06 Structural Shtocrete Specifications
9/87
Calgary Parking Structure
Structural reinforcing steel erected ready for shooting
Note hoarding enclosure for cold-weather shotcreting
-
7/28/2019 06 Structural Shtocrete Specifications
10/87
Calgary Parking Structure
Start-up of shooting of structural walls using bench-gunning technique
-
7/28/2019 06 Structural Shtocrete Specifications
11/87
Calgary Parking Structure
Bench-gunning second lift
Note blowpipe
-
7/28/2019 06 Structural Shtocrete Specifications
12/87
Calgary Parking Structure
Upper lift finished to line and grade
Flash-shooting lower lift to shooting wires, ready for
cutting, screeding and finishing
-
7/28/2019 06 Structural Shtocrete Specifications
13/87
Calgary Parking Structure
Trimming shotcrete with
cutting rod to shooting
wires
-
7/28/2019 06 Structural Shtocrete Specifications
14/87
Calgary Parking Structure
Finished structural shotcrete wall
Finisher is cleaning top of wall and rebar to accept
cast concrete suspended slab that will rest onstructural shotcrete wall
-
7/28/2019 06 Structural Shtocrete Specifications
15/87
Calgary Parking Structure
Four levels of structural shotcrete walls completed
-
7/28/2019 06 Structural Shtocrete Specifications
16/87
Calgary Parking Structure
Close-up view of four levels of structural shotcrete walls
Column conventional cast-in-place formed concrete
(too heavily reinforced for shotcrete construction)
-
7/28/2019 06 Structural Shtocrete Specifications
17/87
-
7/28/2019 06 Structural Shtocrete Specifications
18/87
Calgary Parking Structure
Core extracted from shotcrete wall for compressive
strength testing
Note dense quality of shotcrete free of voids or defects
-
7/28/2019 06 Structural Shtocrete Specifications
19/87
Calgary Parking Structure
Structural shotcrete walls approximately 50%
completed
S i i R fi f H i M S
-
7/28/2019 06 Structural Shtocrete Specifications
20/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
Faade of South Building
S i i R t fit f H it M St t
-
7/28/2019 06 Structural Shtocrete Specifications
21/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
Faade of North Building
S i i R t fit f H it M St t
-
7/28/2019 06 Structural Shtocrete Specifications
22/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
Pre-construction shooting of mock-up of column/wall
connection, to prequalify shotcrete nozzleman for
project
S i i R t fit f H it M St t
-
7/28/2019 06 Structural Shtocrete Specifications
23/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
Completion of shooting of
pre-construction mock-up of
column/wall connection
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
24/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
View of back stripped face of mock-up column/wall
connection
Note complete lack of any voids, shadows or other defects
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
25/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
View of locations of cores
to be extracted for core
grading in pre-constructionmock-up of wall/column
connection
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
26/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
View of 5 cores extracted at locations of reinforcing
steel from wall/column connection mock-up
All cores were better than Grade 2
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
27/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
Interior of North building,
gutted and braced
Reinforcing steel installedin exterior walls, pilasters
and columns, ready for
shotcreting
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
28/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
L-bar anchors grouted into exterior stone masonry
walls
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
29/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
Double mat of rebar installed on exterior masonrywall, ready for shotcreting
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
30/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
Nozzlman bench gun shooting 450 mm thick structural
shotcrete wall
Basement shotcrete left in natural shotcrete finish(since basement backfilled)
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
31/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
Bench gun shooting 1m deep pilaster through 4 layers
of rebar
Note nozzle inserted through first mat of rebar
Seismic Retrofit of Heritage Masonry Structure
-
7/28/2019 06 Structural Shtocrete Specifications
32/87
Seismic Retrofit of Heritage Masonry Structure
Vancouver, BC
View of above-grade perimeter wall being finished to
line and grade
Note shooting wire
Heavily Reinforced Structural Shotcrete Walls and
-
7/28/2019 06 Structural Shtocrete Specifications
33/87
Heavily Reinforced Structural Shotcrete Walls and
Pilaster for New 50 Storey Hotel, Vancouver, BC
Preconstruction mock-p of pilaster and wall
-
7/28/2019 06 Structural Shtocrete Specifications
34/87
Heavily Reinforced Pilaster Mock-up with Two Sided Form
Note shooting wire
-
7/28/2019 06 Structural Shtocrete Specifications
35/87
Shooting Wall Mock-up with Wet-Mix Shotcrete
-
7/28/2019 06 Structural Shtocrete Specifications
36/87
Shooting Pilaster Mock-up
-
7/28/2019 06 Structural Shtocrete Specifications
37/87
Shooting Pilaster Mock-up
Note use of blow-pipe to control rebound
Use of Pencil Vibrator to Help Consolidate
-
7/28/2019 06 Structural Shtocrete Specifications
38/87
p
Shotcrete in Wall Mock-up
-
7/28/2019 06 Structural Shtocrete Specifications
39/87
Trimming Shotcrete to Line and Grade with Cutting Rod
-
7/28/2019 06 Structural Shtocrete Specifications
40/87
Finishing Shotcrete with Rotary Disc
-
7/28/2019 06 Structural Shtocrete Specifications
41/87
Final Finishing of Shotcrete
-
7/28/2019 06 Structural Shtocrete Specifications
42/87
Diamond Saw Cutting Wall and Pilaster Mock-ups
-
7/28/2019 06 Structural Shtocrete Specifications
43/87
Saw Cut Wall Section
C f S S
-
7/28/2019 06 Structural Shtocrete Specifications
44/87
Close-up of Saw-cut Wall Section
S C t Pil t S ti
-
7/28/2019 06 Structural Shtocrete Specifications
45/87
Saw-Cut Pilaster Section
Note dense shotcrete
Cl f S C t Pil t S ti
-
7/28/2019 06 Structural Shtocrete Specifications
46/87
Close-up of Saw-Cut Pilaster Section
Note excellent shotcrete consolidation around dense
reinforcing steel
C E t t d f Pil t
-
7/28/2019 06 Structural Shtocrete Specifications
47/87
Cores Extracted from Pilaster
Note excellent consolidation of shotcrete
Cores E tracted from Wall Section
-
7/28/2019 06 Structural Shtocrete Specifications
48/87
Cores Extracted from Wall Section
Note excellent consolidation of shotcrete around dense
reinforcing steel
Whistler 2010 Olympics Bobsleigh/Luge Track
-
7/28/2019 06 Structural Shtocrete Specifications
49/87
Whistler 2010 Olympics - Bobsleigh/Luge Track
Installation of Rebar and Cooling Pipes in Track
-
7/28/2019 06 Structural Shtocrete Specifications
50/87
Installation of Rebar and Cooling Pipes in Track
Stay Form Expanded Metal Lath
-
7/28/2019 06 Structural Shtocrete Specifications
51/87
Stay-Form Expanded Metal Lath
Correct and Incorrect Method of
Encasing Reinforcing Bars with Shotcrete
-
7/28/2019 06 Structural Shtocrete Specifications
52/87
Encasing Reinforcing Bars with Shotcrete
Typical Reinforcing and Cooling Pipe Detail
-
7/28/2019 06 Structural Shtocrete Specifications
53/87
Typical Reinforcing and Cooling Pipe Detail
Note use of expanded metal lath in first sections of track
Note Use of Diagonal Spacer Bar
-
7/28/2019 06 Structural Shtocrete Specifications
54/87
Note Use of Diagonal Spacer Bar
Note Congestion at Cooling Pipe Header
-
7/28/2019 06 Structural Shtocrete Specifications
55/87
Note Congestion at Cooling Pipe Header
Track Ready for Shooting
-
7/28/2019 06 Structural Shtocrete Specifications
56/87
Track Ready for Shooting
Note use of temporary plastic screed bars
Shotcreted and Finished Section of Track
-
7/28/2019 06 Structural Shtocrete Specifications
57/87
Shotcreted and Finished Section of Track
Void and Coarse Aggregate
Trapped Behind Expanded Metal Lath
-
7/28/2019 06 Structural Shtocrete Specifications
58/87
Trapped Behind Expanded Metal Lath
-
7/28/2019 06 Structural Shtocrete Specifications
59/87
Void at Congested Area of Cooling Pipe Baffle
and Diagonal Spacer Bar, After Hydro-blasting
-
7/28/2019 06 Structural Shtocrete Specifications
60/87
g p , y g
Void at Cooling Pipe Spacer Bar After Hydro-blasting
-
7/28/2019 06 Structural Shtocrete Specifications
61/87
g p p y g
Construction of Second Mock-up Using Stay-Form
-
7/28/2019 06 Structural Shtocrete Specifications
62/87
p g y
Start of Shotcreting Shoot Cove
Between Wall/Floor First
-
7/28/2019 06 Structural Shtocrete Specifications
63/87
Shoot Floor Next
-
7/28/2019 06 Structural Shtocrete Specifications
64/87
Consolidate Shotcrete in
Cove/Floor with Immersion Vibrator
-
7/28/2019 06 Structural Shtocrete Specifications
65/87
Fully Consolidated Shotcrete In Cove/Wall
-
7/28/2019 06 Structural Shtocrete Specifications
66/87
Blow out Rebound/Overspray with Blow-pipe
-
7/28/2019 06 Structural Shtocrete Specifications
67/87
Shoot First Lift on Wall
-
7/28/2019 06 Structural Shtocrete Specifications
68/87
Back Face of Wall
-
7/28/2019 06 Structural Shtocrete Specifications
69/87
Note lack of voids behind stay-form
-
7/28/2019 06 Structural Shtocrete Specifications
70/87
Header Form Stripped off Still-Fresh Shotcrete
-
7/28/2019 06 Structural Shtocrete Specifications
71/87
Finish Coat Applied to Flush with Screed Pipes
-
7/28/2019 06 Structural Shtocrete Specifications
72/87
Screeding Shotcrete to Temporary Screed Pipes
-
7/28/2019 06 Structural Shtocrete Specifications
73/87
Finishing of Shotcrete After Screed Pipe Removal
-
7/28/2019 06 Structural Shtocrete Specifications
74/87
Broom Texture Finish (to aid ice adhesion)
-
7/28/2019 06 Structural Shtocrete Specifications
75/87
Newly Finished Shotcrete Surface
being Moist Cured by Misting
-
7/28/2019 06 Structural Shtocrete Specifications
76/87
Misting with Water Pressure Sprayer
-
7/28/2019 06 Structural Shtocrete Specifications
77/87
Cut-out Section from Second Mock-up
-
7/28/2019 06 Structural Shtocrete Specifications
78/87
Note good consolidation
around rebar, cooling
pipes and stay-form
Close-up View of Cut-out from Second Mock-up
-
7/28/2019 06 Structural Shtocrete Specifications
79/87
Note good consolidation
of shotcrete
Completed section of Track
-
7/28/2019 06 Structural Shtocrete Specifications
80/87
Whistler 2010 Winter Olympics
Bobsleigh/Luge Track Finish Zone
-
7/28/2019 06 Structural Shtocrete Specifications
81/87
Whistler 2010 Winter Olympics
Bobsleigh/Luge Track
-
7/28/2019 06 Structural Shtocrete Specifications
82/87
Inspection of iced track prior to first run by Canadian WorldChampion Bobsledders Pierre Lueders and Justin Kripps
Whistler 2010 Winter Olympics
Bobsleigh/Luge Track
-
7/28/2019 06 Structural Shtocrete Specifications
83/87
Canadian bobsledders Pierre Lueders, pilot and Justin Krippspush off their two-man bobsled from a lower start for their first
run down The Whistler Sliding Centre track
Whistler 2010 Winter Olympics
Bobsleigh/Luge Track
-
7/28/2019 06 Structural Shtocrete Specifications
84/87
Start of first run on track
Photo Courtesy VANOC/ Photos: David McColm
Whistler 2010 Winter Olympics
Bobsleigh/Luge Track
-
7/28/2019 06 Structural Shtocrete Specifications
85/87
First run on track
Photo Courtesy VANOC/ Photos: David McColm
Whistler 2010 Winter Olympics
Bobsleigh/Luge Track
-
7/28/2019 06 Structural Shtocrete Specifications
86/87
Air time at finish
Whistler 2010 Winter Olympics
Bobsleigh/Luge Track
-
7/28/2019 06 Structural Shtocrete Specifications
87/87