    Directorate General of HydrocarbonsNew Delhi

    ORIENTATION ON INDIA OIL & GAS

    INDUSTRY

    byA.S.Popli

  • 7/28/2019 06 OGP-As Popli Presentation

    2/36

    2

    Energy Scenario

    Resource Base

    Exploration Status

    Market & Infrastructure

    Opportunities

    PRESENTATION OUTLINE

  • 7/28/2019 06 OGP-As Popli Presentation

    3/36

    3

    WORLD ENERGY CONSUMPTION(PER CAPITA)

  • 7/28/2019 06 OGP-As Popli Presentation

    4/36

    4

    ENERGY CONSUMPTION

  • 7/28/2019 06 OGP-As Popli Presentation

    5/36 5

    ENERGY @ GDP

  • 7/28/2019 06 OGP-As Popli Presentation

    6/36 6

    ENERGY CONSUMPTION

    As on 01.04.06

    Coal54%

    Oil33%

    NG8%

    Hydel8%

    Nuclear1%

    SHARE OF ENERGY CONSUMPTION - INDIA

  • 7/28/2019 06 OGP-As Popli Presentation

    7/36 7

    Sedimentary Area : 3.14 Million Sq.Km.

    (~4% of the worlds sedimentary

    area)

    Sedimentary Basins : 26( Exploration initiated in15 )

    Prognosticated Resources : 205 Billion Barrel(O+OEG) (For 15 Basins only; needs up-gradation)

    Established reserves : 61 Billion Barrel

    VAST RESOURCE BASE

  • 7/28/2019 06 OGP-As Popli Presentation

    8/36 8

    Onland1.39 M.Km2

    Shallow Offshore0.40 M.Km2

    Deep Water1.35 M.Km2

    Total Sedimentary Area3.14 Million Sq. Km.

    43%

    13%

    44%

    ACREAGE PORTFOLIO

    FRONTIER BASINAL

  • 7/28/2019 06 OGP-As Popli Presentation

    9/369

    FRONTIER BASINALAREA

    Total sedimentary Area 3,140,000 sq km

    Frontier Basins1,879,500 sq km

    (60%)

    Non FrontierBasins

    1,260,500 sq km

    Deep Water1,350,000 sq km

    (72%)

    On land & Shallow water529,500 sq km

  • 7/28/2019 06 OGP-As Popli Presentation

    10/3610

    EXPLORATION STATUS

    20% of the total 3.14 million sq. km.has been extensively explored 22% of total prognosticated gas

    resources established Reserves estimated in only 15 out

    of 26 basins Very low drilling density

    44%15% 20%21%Poorly

    Explored

    Initiated

    Unexplored

    WellExplored

  • 7/28/2019 06 OGP-As Popli Presentation

    11/3611

    Pre-NELP(1993 2006)13 Yrs.

    NELP- I, II & III, IV,V(2000-06)-6 Yrs.

    2D Seismic Survey (LKM) 24,091 1,09,305

    3D Seismic Survey (SKM) 5,304 67,773

    Exploratory Wells (No.) 167 93

    PSC Blocks 28 138

    No. of Discoveries

    (Up to 15-04-2007)

    25 40

    Investment made on

    Exploration (US$ MM)781.65 1451.18

    EXPLORATION STATUS PSC REGIME

  • 7/28/2019 06 OGP-As Popli Presentation

    12/36

    12

    3 2

    7

    12

    10

    21

    0

    5

    10

    15

    20

    25

    1990 2000 2005

    Prolific producing Basins No of E&P Operators

    *

    * Likely to start commercial production in near fut

    EXPLORATIONSTATUS

  • 7/28/2019 06 OGP-As Popli Presentation

    13/36

    13

    CRUDE OIL PRODUCTION IN MMT

    25.07

    3.29

    4.08

    24.71

    3.18

    4.14

    26.01

    2.95

    4.09

    26.06

    3.00

    4.31

    26.08

    3.20

    4.30

    24.40

    3.24

    4.55

    2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

    ONGC OIL Pvt/JV

    32.4 32.0 33.1 33.433.6 32.2

    HYDROCARBONSTATUS

  • 7/28/2019 06 OGP-As Popli Presentation

    14/36

    14

    NATURAL GAS PRODUCTION IN BCM

    24.02

    1.86

    3.60

    24.04

    1.62

    4.05

    24.04

    1.74

    5.41

    24.24

    1.89

    6.49

    23.58

    2.01

    6.78

    22.97

    2.27

    7.36

    2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

    ONGC OIL Pvt/JV

    29.5 29.71

    31.2 32.6 32.4 32.6

    HYDROCARBON STATUS

  • 7/28/2019 06 OGP-As Popli Presentation

    15/36

    15

    11.89 11.47 11.45 11.58 11.43

    20.1421.57 21.92

    22.4

    20.76

    0

    5

    10

    15

    20

    25

    2001-02 2002-03 2003-04 2004-05 2005-06

    MMt

    Onshore Offshore

    OIL PRODUCTION

    MMT

  • 7/28/2019 06 OGP-As Popli Presentation

    16/36

    16

    7.868.72 8.98 8.96

    9.46

    21.8622.67 22.98 22.8 22.74

    0

    5

    10

    15

    20

    25

    2001-02 2002-03 2003-04 2004-05 2005-06

    Onshore Of fshore

    GAS PRODUCTION

    MM

    SCM

  • 7/28/2019 06 OGP-As Popli Presentation

    17/36

    17

    CRUDE OIL (MMT) NATURAL GAS (MMSCMD)

    YearYear

    376.5

    99.7114.3

    140

    199.6

    61.4

    32.03 33.05 33.98 33.470

    100

    200

    300

    400

    2001-02 2002-03 2005-06 2011-12 2024-25

    Demand

    Production

    391

    313

    231

    151

    170158.05

    94.8481.4

    0

    100

    200

    300

    400

    2001-02 2006-07 2011-12 2024-25

    Demand

    Supply

    EXPANDING GAP..

  • 7/28/2019 06 OGP-As Popli Presentation

    18/36

    18

    TAPPING THE POTENTIAL

    Development of new Discoveries

    Harnessing CBM Resources

    Gas Hydrate and Oil Shale

  • 7/28/2019 06 OGP-As Popli Presentation

    19/36

    FROM DISCOVERY TO DEVELOPMENT

  • 7/28/2019 06 OGP-As Popli Presentation

    20/36

    20

    FROM DISCOVERY TO DEVELOPMENT

    Total Discoveries : 65

    Discoveries Appraised : 16

    Commerciality Established : 12

    Commerciality Under Evaluation : 11

    Development Plan Approved : 8

    Development plan under Evaluation : 4 In-Place Reserves (O+OEG) : 658 MMT

    (Commercial Discoveries)

    HC POTENTIAL IN EAST COAST

  • 7/28/2019 06 OGP-As Popli Presentation

    21/36

    21

    HC POTENTIAL IN EAST COAST

    Basin Area (Sq.km) : 299,000

    Prognosticated Resources (Billion bbl) : 11.5(O+OEG)

    Prognosticated Resources Gas TCF) : 2

    (Approx)

    Wells Drilled (Nos.) : 243

    Deep Water : 56

    Shallow Water : 187

    Proved GIIP Reserves (TCF) : 16.38

    Present Gas Production : 1.9(MMSCMD)

    Anticipated Future Production : 44 - 84(MMSCMD)

    CBM RESOURCES BASE

  • 7/28/2019 06 OGP-As Popli Presentation

    22/36

    22

    CBM RESOURCES BASE

    Tertiary Coal / Lignite Fields

    Gondwana Coalfield

    COAL BEARING AREA : 35400 sq.km.

    COAL & LIGNITE FIELDS : 44 (IN 12 STATES)

    CBM RESOURCE BASE : 162 TCF

    (4.6 TCM)

    10

    17

    18

    19

    11

    12

    16

    20

    3

    98

    6 5 4 2

    14

    13

    7Kolkata

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Chennai

    7

    10

    17

    18

    19

    11

    12

    16

    20

    3

    98

    6 5 4 2

    14

    13

    7Kolkata10

    17

    18

    19

    11

    12

    16

    20

    3

    98

    6 5 4 2

    14

    13

    7Kolkata

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Mumbai

    Delhi

    7

    Chennai

    7

  • 7/28/2019 06 OGP-As Popli Presentation

    23/36

    23

    CBM : EXPLORATION ACTIVITIES

    Blocks Awarded : 26

    Area Opened-up for CBM Exploration : 13600 SQ.KM.

    CBM Resource in the Awarded Blocks : 50 TCF

    Production Potential of these Blocks : 38 MMSCMD

    Commercial Production expected : 2007-08

    EXPLORATION STATUS OF CBM

  • 7/28/2019 06 OGP-As Popli Presentation

    24/36

    24

    Unexplored Exploration Initiated

    EXPLORATION STATUS OF CBM

    Exploration Initiated

    38% Un-Explored62%

    Total available coal bearing area : 35400 sq. km.

  • 7/28/2019 06 OGP-As Popli Presentation

    25/36

    25

    GAS HYDRATESTHE FUEL OF THE FUTURE

    Indian offshore contains an estimated 1894 TCM of

    natural gas in the form of hydrates. Fresh impetus given by MOP&NG to National Gas

    Hydrate Programme (NGHP) in September 2000

    Geo-scientific studies in East & West coasts of India

    were carried out. Three prospective areas mapped

    Drilling/coring of gas hydrate was carried out in EastCoast, West Coast and KG basin. Scientific studies

    on the cores is under progress.

    Gas from gas hydrate is at R&D stage in the world.

  • 7/28/2019 06 OGP-As Popli Presentation

    26/36

    26

    OIL SHALE WAY FORWARD

    Oil Shale resource estimation in progress in

    Assam.

    -

    expected completion by 2008. Tie up with foreign institutions having experience

    and expertise in oil shale exploration and

    exploitation.

    TOTAL 2D API EXPECTED (LKM)

  • 7/28/2019 06 OGP-As Popli Presentation

    27/36

    27

    2005&06 2007&08 2009&10 2011&12 TOTAL

    ONLAND 4250 3810 700 100 8860

    SHALLOW WATER 5200 1000 0 0 6200

    DEEP WATER 19350 15200 0 2400 36950

    TOTAL 28800 20010 700 2500 52010

    TOTAL 2D API EXPECTED (LKM)

    3D API EXPECTED (SKM)

  • 7/28/2019 06 OGP-As Popli Presentation

    28/36

    28

    3D API EXPECTED (SKM)

    2005&06 2007&08 2009&10 2011&12 TOTAL

    ONLAND 660 3758 1210 1350 6978

    SHALLOW WATER 5500 2550 500 0 8550

    DEEP WATER 23450 15640 2500 500 42090

    TOTAL 29610 21948 4210 1850 57618

    ADDITIONAL WORK EXPECTED IN NELP-VI

  • 7/28/2019 06 OGP-As Popli Presentation

    29/36

    29

    WELLS

    DEEPWATER 30

    SHALLOW WATER 10

    ONLAND 50

    TOTAL 90

    BLOCKS

    3D IN SQ.M.

    DEEPWATER 22717

    SHALLOW WATER 1511

    ONLAND 4125

    TOTAL 28353

    2D IN LKM

    DEEPWATER 72198

    SHALLOW WATER 4163

    ONLAND 8712

    TOTAL 85073

    EQUIPMENT / MATERIALS REQUIRED

  • 7/28/2019 06 OGP-As Popli Presentation

    30/36

    30

    EQUIPMENT / MATERIALS REQUIRED

    Drilling Rigs : Onshore rigs, Jack-ups & Floaters,

    semi submersible

    Christmas Trees & Offshore facilities

    Construction barges pipeline by barges, support

    services vessels and offshore support vessels etc.

    BRIDGING THE GAP

  • 7/28/2019 06 OGP-As Popli Presentation

    31/36

    31

    BRIDGING THE GAP

    Intensification in the Exploration through

    NELP Fast development of new gasdiscoveries

    Import of LNG

    Transnational gas pipelines Iran-PakistanIndia

    MyanmarBangladesh-India

    Gas production from CBM

    Underground Coal gasification

    Gas from Gas Hydrate

    INFRASTRUCTURE DEVELOPMENT

  • 7/28/2019 06 OGP-As Popli Presentation

    32/36

    32

    INFRASTRUCTURE DEVELOPMENT

    A substantial boost in supplies fromproduction or imports will take time and willrequire additional infrastructure

    Establishment of a national Gas

    Transmission systemMoving gas from newly emerging supply

    centres to demand centres

    Addition of LNG infrastructure

    EXISTING

    National Gas GridPRODUCTPIPELINE

  • 7/28/2019 06 OGP-As Popli Presentation

    33/36

    33

    Delhi

    Mumbai

    ChennaiRefineries in India

    Major Airports inIndia

    A 1 BLOCK,MYANMAR

    EXISTING

    PROPOSED

    National Gas GridGAIL

    Kolkata

    Product Pipelines inIndia

    REFINERIES

    INTERNATIONAL AIRPORT

    DOMESTIC AIRPORT

    INFRASTRUCTURE

  • 7/28/2019 06 OGP-As Popli Presentation

    34/36

    34

    DEVELOPMENT

  • 7/28/2019 06 OGP-As Popli Presentation

    35/36

    35

    LIKELY ACREAGEOFFER

    IN NELP VII

    TOTAL AREA LIKELY TOBE OFFERED : 400,000 SKM

    No. of blocks ~ 70-80

  • 7/28/2019 06 OGP-As Popli Presentation

    36/36

    36

    prognosticate

    hydrocarbonspotential