(1) Pasir
Sand
Pasir sungai 2011 Dis 34.79 66.64 58.31 37.67 23.28 31.00
River sand 2012 Jan 34.79 66.64 58.31 38.00 23.28 31.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
(2) Batu baur
Aggregates
Granite 10mm (3/8") 2011 Dis 40.00 54.00 35.33 26.58 57.00 51.00
Granite 10mm (3/8") 2012 Jan 40.50 54.00 35.33 26.58 57.00 51.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Granite 20mm (3/4") 2011 Dis 54.00 70.00 40.50 34.23 49.50 na
Granite 20mm (3/4") 2012 Jan 57.00 70.00 40.50 34.23 49.50 na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.
** Harga pasir di Sarawak adalah untuk tujuan kerja-kerja konkrit sahaja.
** The sand price in Sarawak is for the purpose of concrete works only.
RM Per Metric Ton
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
RM Per Tan Metrik
Region
TempohSabah Sarawak
PeriodG H I J
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail
Kawasan*
Item
LK
-6 -
(2) Batu baur (samb.) Aggregates (cont'd)
Granite 40mm (11/2") 2011 Dis 48.50 na 38.00 21.30 47.00 45.00
Granite 40mm (11/2") 2012 Jan 49.50 na 38.00 21.30 47.00 45.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Crusher run 2011 Dis 40.75 59.00 33.67 18.50 41.00 45.00
Crusher run 2012 Jan 41.25 59.00 33.67 18.50 41.00 45.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Sandstone 20mm (3/4") 2011 Dis 46.00 49.00 37.00 na na na
Sandstone 20mm (3/4") 2012 Jan 47.50 49.00 37.00 na na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
na = Tidak diperoleh/Not available
L
RM Per Tan Metrik
PeriodItem
G
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
RM Per Metric Ton
TempohSabah Sarawak
KH I J
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Region
-7 -
(2) Batu baur (samb.) Aggregates (cont'd)
Limestone 20mm (3/4") 2011 Dis na na na 26.30 47.00 52.00
Limestone 20mm (3/4") 2012 Jan na na na 26.30 47.00 52.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
(3) Premix asphaltic concrete Premix asphaltic concrete
AC 10 (Wearing course) 2011 Dis 236.67 300.00 na 192.00 200.00 220.00
2012 Jan 236.67 300.00 na 192.00 200.00 220.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
AC 14 (Wearing course) 2011 Dis 236.67 300.00 230.00 192.00 200.00 210.00
2012 Jan 236.67 300.00 230.00 182.50 200.00 210.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
na = Tidak diperoleh/Not available
Item
K L
RM Per Tan Metrik RM Per Metric Ton
I J
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
Kawasan*
Region
Tempoh
PeriodG H
Sabah Sarawak
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
-8 -
(3) Premix asphaltic concrete (samb.) Premix asphaltic concrete (cont'd)
AC 28 (Binder course) 2011 Dis 231.67 300.00 na 182.50 200.00 220.00
2012 Jan 231.67 300.00 na 177.50 200.00 220.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ACW 20 (Wearing course) 2011 Dis 233.33 300.00 230.00 199.50 200.00 210.00
2012 Jan 233.33 300.00 230.00 190.00 200.00 210.00
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BMR40 (Bound roadbase) 2011 Dis na na na 170.00 na na
2012 Jan na na na 170.00 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
na = Tidak diperoleh/Not available
Item
Sabah Sarawak
K L
RM Per Tan Metrik RM Per Metric Ton
I J
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Tempoh
PeriodG H
-9 -
(3) Premix bituminous macadam Premix bituminous macadam
BMR28 (Bound roadbase) 2011 Dis na na na 170.00 na na
2012 Jan na na na 170.00 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BML10 (Levelling course) 2011 Dis na na na 170.00 na na
2012 Jan na na na 170.00 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BMB28 (Binder course) 2011 Dis na na na 175.00 na na
2012 Jan na na na 175.00 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
na = Tidak diperoleh/Not available
Item
Sabah Sarawak
K
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
Region
RM Per Metric Ton
I J
Tempoh
PeriodG
RM Per Tan Metrik
LH
-10 -
(3) Premix bituminous macadam (samb.) Premix bituminous macadam (cont'd)
BMB20 (Binder course) 2011 Dis na na na 175.00 na na
2012 Jan na na na 175.00 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BMW14 (Wearing course) 2011 Dis na na na 180.00 na na
2012 Jan na na na 180.00 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BMW 20 (Wearing course) 2011 Dis na na na 180.00 na na
2012 Jan na na na 180.00 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
na = Tidak diperoleh/Not available
Sarawak
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Item
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
K L
RM Per Tan Metrik RM Per Metric Ton
I J
Tempoh
PeriodG H
Sabah
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
-11 -
(4) Fabric reinforcement
Fabric reinforcement
A4, MS145 2011 Dis 4.06 3.97 3.86 3.10 4.66 4.18
2012 Jan 3.76 3.97 3.86 3.10 4.82 4.18
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
A5, MS145 2011 Dis 3.57 3.53 3.43 3.15 4.15 3.71
2012 Jan 3.35 3.53 3.43 3.15 4.28 3.71
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
A6, MS145 2011 Dis 3.52 3.42 3.33 3.15 4.02 3.60
2012 Jan 3.30 3.42 3.33 3.15 4.15 3.60
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Mulai Januari 2010, harga fabric reinforcement tidak termasuk kos pemotongan.
Starting from January 2010, the fabric reinforcement prices do not include cutting services fee.
Item
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
RM Per Kg
RM Per Kg
I J
Kawasan*
Region
Tempoh
PeriodG H
Sabah Sarawak
K L
-12 -
(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)
A7, MS145 2011 Dis 3.50 3.31 3.22 3.15 3.89 3.48
2012 Jan 3.27 3.31 3.22 3.15 4.01 3.48
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
A8, MS145 2011 Dis 3.72 3.30 3.21 3.15 3.87 3.47
2012 Jan 3.49 3.30 3.21 3.15 4.00 3.47
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
A9, MS145 2011 Dis 3.47 3.22 3.13 3.18 3.78 3.39
2012 Jan 3.25 3.22 3.13 3.15 3.91 3.39
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Item
Sarawak
K
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
Tempoh
PeriodG H
Sabah
RM Per Kg
Kawasan*
Region
I J L
RM Per Kg
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
-13 -
(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)
A10, MS145 2011 Dis 3.52 3.42 3.33 3.18 4.02 3.60
2012 Jan 3.29 3.42 3.33 3.15 4.15 3.60
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B5, MS145 2011 Dis 3.00 3.37 3.27 3.20 3.95 3.54
2012 Jan 3.00 3.37 3.27 3.20 4.08 3.54
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B6, MS145 2011 Dis 3.51 3.37 3.27 3.20 3.95 3.54
2012 Jan 3.28 3.37 3.27 3.20 4.08 3.54
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ItemTempoh
PeriodG
Sabah Sarawak
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
RM Per Kg RM Per Kg
I JH K L
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
-14 -
(4) Fabric reinforcement (samb.)
Fabric reinforcement (cont'd)
B7, MS145 2011 Dis 3.73 3.37 3.27 3.20 3.95 3.54
2012 Jan 3.51 3.37 3.27 3.20 4.08 3.54
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B8, MS145 2011 Dis 3.50 3.31 3.22 3.20 3.89 3.48
2012 Jan 3.28 3.31 3.22 3.20 4.01 3.48
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B9, MS145 2011 Dis 3.51 3.39 3.30 3.23 3.98 3.56
2012 Jan 3.29 3.39 3.30 3.20 4.11 3.56
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Item
I J
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
RM Per Kg
RM Per Kg
Kawasan*
Region
Tempoh
PeriodG H
Sabah Sarawak
K L
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
-15 -
(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)
B10, MS145 2011 Dis 3.05 3.49 3.39 3.23 4.09 3.67
2012 Jan 3.05 3.49 3.39 3.20 4.23 3.67
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B12, MS145 2011 Dis 3.02 3.48 3.38 3.20 4.08 3.66
2012 Jan 3.02 3.48 3.38 3.20 4.21 3.66
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
C5, MS145 2011 Dis 3.07 3.33 3.24 3.20 3.91 3.51
2012 Jan 3.07 3.33 3.24 3.20 4.04 3.51
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
RM Per Kg
Item
RM Per Kg
Region
Sabah
G H
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
Sarawak
K
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
I J L
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Tempoh
Period
-16 -
(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)
C6, MS145 2011 Dis 3.08 3.56 3.47 3.20 4.19 3.75
2012 Jan 3.08 3.56 3.47 3.20 4.23 3.75
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
C7, MS145 2011 Dis 3.06 3.51 3.41 3.20 4.12 3.69
2012 Jan 3.06 3.51 3.41 3.20 4.25 3.69
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
C8, MS145 2011 Dis 3.08 3.56 3.47 3.20 4.19 3.75
2012 Jan 3.08 3.56 3.47 3.20 4.32 3.75
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
L
RM Per Kg
Item
Sabah
K
Sarawak
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
RM Per Kg
I
Kawasan*
Region
Tempoh
PeriodG H J
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
-17 -
(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)
C9, MS145 2011 Dis 3.04 3.48 3.38 3.23 4.08 3.66
2012 Jan 3.04 3.48 3.38 3.20 4.21 3.66
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
C10, MS145 2011 Dis 3.06 3.52 3.42 3.23 4.13 3.70
2012 Jan 3.06 3.52 3.42 3.20 4.27 3.70
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA4, MS145 2011 Dis 3.11 3.61 3.51 3.25 4.24 3.80
2012 Jan 3.11 3.61 3.51 3.20 4.37 3.80
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
H K
RM Per Kg
L
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
RM Per Kg
Item
Kawasan*
Region
Tempoh
PeriodG
Sabah
I J
Sarawak
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
-18 -
(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)
DA5, MS145 2011 Dis 3.31 3.65 3.55 3.23 4.29 3.84
2012 Jan 3.31 3.65 3.55 3.20 4.43 3.84
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA6, MS145 2011 Dis 3.23 3.54 3.45 3.23 4.16 3.73
2012 Jan 3.23 3.54 3.45 3.20 4.29 3.73
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA7, MS145 2011 Dis 3.12 3.43 3.34 3.23 4.03 3.61
2012 Jan 3.12 3.43 3.34 3.20 4.16 3.61
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Region
TempohSarawak
G H
Item
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
K L
RM Per Kg RM Per Kg
I JPeriod
Sabah
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
-19 -
(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)
DA8, MS145 2011 Dis 3.07 3.38 3.28 3.23 3.97 3.55
2012 Jan 3.07 3.38 3.28 3.20 4.09 3.55
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA9, MS145 2011 Dis 3.07 3.37 3.27 3.23 3.95 3.54
2012 Jan 3.07 3.37 3.27 3.20 4.08 3.54
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA10, MS145 2011 Dis 3.20 3.51 3.41 3.23 4.12 3.69
2012 Jan 3.20 3.51 3.41 3.20 4.25 3.69
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
PeriodG H
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
K L
RM Per Kg RM Per Kg
I J
ItemTempoh
Sabah Sarawak
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
-20 -
(5) Guardrail Guardrail
Single mounted 2011 Dis 268.80 na na 298.13 na na
i)1.95m Post spacing 2012 Jan 268.80 na na 298.13 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ii) 3.8m Post spacing 2011 Dis 197.27 na na 314.00 na na
2012 Jan 197.27 na na 314.00 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Double mounted 2011 Dis na na na 371.88 na na
i) 1.95m Post spacing 2012 Jan na na na 371.88 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.
na = Tidak diperoleh/Not available
K L
RM Per Meter RM Per Metre
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
ItemTempoh
Region
PeriodG H
Sabah Sarawak
I J
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
-21 -
(5) Guardrail (samb.) Guardrail (cont'd)
ii) 3.8m Post spacing 2011 Dis na na na 357.75 na na
2012 Jan na na na 357.75 na na
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
na = Tidak diperoleh/Not available
* Kawasan/Region
G = Kota Kinabalu
H = Sandakan
I = Tawau
J = Kuching
K = Sibu
L = Miri
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sarawak
ItemPeriod
G H I J
RM Per Meter RM Per Metre
K L
TempohSabah
-22 -