05-JADUAL3

17

Click here to load reader

description

Kontraktor

Transcript of 05-JADUAL3

Page 1: 05-JADUAL3

(1) Pasir

Sand

Pasir sungai 2011 Dis 34.79 66.64 58.31 37.67 23.28 31.00

River sand 2012 Jan 34.79 66.64 58.31 38.00 23.28 31.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(2) Batu baur

Aggregates

Granite 10mm (3/8") 2011 Dis 40.00 54.00 35.33 26.58 57.00 51.00

Granite 10mm (3/8") 2012 Jan 40.50 54.00 35.33 26.58 57.00 51.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Granite 20mm (3/4") 2011 Dis 54.00 70.00 40.50 34.23 49.50 na

Granite 20mm (3/4") 2012 Jan 57.00 70.00 40.50 34.23 49.50 na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.

The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.

** Harga pasir di Sarawak adalah untuk tujuan kerja-kerja konkrit sahaja.

** The sand price in Sarawak is for the purpose of concrete works only.

RM Per Metric Ton

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

RM Per Tan Metrik

Region

TempohSabah Sarawak

PeriodG H I J

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail

Kawasan*

Item

LK

-6 -

Page 2: 05-JADUAL3

(2) Batu baur (samb.) Aggregates (cont'd)

Granite 40mm (11/2") 2011 Dis 48.50 na 38.00 21.30 47.00 45.00

Granite 40mm (11/2") 2012 Jan 49.50 na 38.00 21.30 47.00 45.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Crusher run 2011 Dis 40.75 59.00 33.67 18.50 41.00 45.00

Crusher run 2012 Jan 41.25 59.00 33.67 18.50 41.00 45.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Sandstone 20mm (3/4") 2011 Dis 46.00 49.00 37.00 na na na

Sandstone 20mm (3/4") 2012 Jan 47.50 49.00 37.00 na na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

na = Tidak diperoleh/Not available

L

RM Per Tan Metrik

PeriodItem

G

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

RM Per Metric Ton

TempohSabah Sarawak

KH I J

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Region

-7 -

Page 3: 05-JADUAL3

(2) Batu baur (samb.) Aggregates (cont'd)

Limestone 20mm (3/4") 2011 Dis na na na 26.30 47.00 52.00

Limestone 20mm (3/4") 2012 Jan na na na 26.30 47.00 52.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(3) Premix asphaltic concrete Premix asphaltic concrete

AC 10 (Wearing course) 2011 Dis 236.67 300.00 na 192.00 200.00 220.00

2012 Jan 236.67 300.00 na 192.00 200.00 220.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

AC 14 (Wearing course) 2011 Dis 236.67 300.00 230.00 192.00 200.00 210.00

2012 Jan 236.67 300.00 230.00 182.50 200.00 210.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

na = Tidak diperoleh/Not available

Item

K L

RM Per Tan Metrik RM Per Metric Ton

I J

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

Kawasan*

Region

Tempoh

PeriodG H

Sabah Sarawak

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

-8 -

Page 4: 05-JADUAL3

(3) Premix asphaltic concrete (samb.) Premix asphaltic concrete (cont'd)

AC 28 (Binder course) 2011 Dis 231.67 300.00 na 182.50 200.00 220.00

2012 Jan 231.67 300.00 na 177.50 200.00 220.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

ACW 20 (Wearing course) 2011 Dis 233.33 300.00 230.00 199.50 200.00 210.00

2012 Jan 233.33 300.00 230.00 190.00 200.00 210.00

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

BMR40 (Bound roadbase) 2011 Dis na na na 170.00 na na

2012 Jan na na na 170.00 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

na = Tidak diperoleh/Not available

Item

Sabah Sarawak

K L

RM Per Tan Metrik RM Per Metric Ton

I J

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

Region

Tempoh

PeriodG H

-9 -

Page 5: 05-JADUAL3

(3) Premix bituminous macadam Premix bituminous macadam

BMR28 (Bound roadbase) 2011 Dis na na na 170.00 na na

2012 Jan na na na 170.00 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

BML10 (Levelling course) 2011 Dis na na na 170.00 na na

2012 Jan na na na 170.00 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

BMB28 (Binder course) 2011 Dis na na na 175.00 na na

2012 Jan na na na 175.00 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

na = Tidak diperoleh/Not available

Item

Sabah Sarawak

K

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

Region

RM Per Metric Ton

I J

Tempoh

PeriodG

RM Per Tan Metrik

LH

-10 -

Page 6: 05-JADUAL3

(3) Premix bituminous macadam (samb.) Premix bituminous macadam (cont'd)

BMB20 (Binder course) 2011 Dis na na na 175.00 na na

2012 Jan na na na 175.00 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

BMW14 (Wearing course) 2011 Dis na na na 180.00 na na

2012 Jan na na na 180.00 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

BMW 20 (Wearing course) 2011 Dis na na na 180.00 na na

2012 Jan na na na 180.00 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

na = Tidak diperoleh/Not available

Sarawak

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Item

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

K L

RM Per Tan Metrik RM Per Metric Ton

I J

Tempoh

PeriodG H

Sabah

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

Region

-11 -

Page 7: 05-JADUAL3

(4) Fabric reinforcement

Fabric reinforcement

A4, MS145 2011 Dis 4.06 3.97 3.86 3.10 4.66 4.18

2012 Jan 3.76 3.97 3.86 3.10 4.82 4.18

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

A5, MS145 2011 Dis 3.57 3.53 3.43 3.15 4.15 3.71

2012 Jan 3.35 3.53 3.43 3.15 4.28 3.71

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

A6, MS145 2011 Dis 3.52 3.42 3.33 3.15 4.02 3.60

2012 Jan 3.30 3.42 3.33 3.15 4.15 3.60

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Mulai Januari 2010, harga fabric reinforcement tidak termasuk kos pemotongan.

Starting from January 2010, the fabric reinforcement prices do not include cutting services fee.

Item

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

RM Per Kg

RM Per Kg

I J

Kawasan*

Region

Tempoh

PeriodG H

Sabah Sarawak

K L

-12 -

Page 8: 05-JADUAL3

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)

A7, MS145 2011 Dis 3.50 3.31 3.22 3.15 3.89 3.48

2012 Jan 3.27 3.31 3.22 3.15 4.01 3.48

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

A8, MS145 2011 Dis 3.72 3.30 3.21 3.15 3.87 3.47

2012 Jan 3.49 3.30 3.21 3.15 4.00 3.47

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

A9, MS145 2011 Dis 3.47 3.22 3.13 3.18 3.78 3.39

2012 Jan 3.25 3.22 3.13 3.15 3.91 3.39

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Item

Sarawak

K

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

Tempoh

PeriodG H

Sabah

RM Per Kg

Kawasan*

Region

I J L

RM Per Kg

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

-13 -

Page 9: 05-JADUAL3

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)

A10, MS145 2011 Dis 3.52 3.42 3.33 3.18 4.02 3.60

2012 Jan 3.29 3.42 3.33 3.15 4.15 3.60

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

B5, MS145 2011 Dis 3.00 3.37 3.27 3.20 3.95 3.54

2012 Jan 3.00 3.37 3.27 3.20 4.08 3.54

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

B6, MS145 2011 Dis 3.51 3.37 3.27 3.20 3.95 3.54

2012 Jan 3.28 3.37 3.27 3.20 4.08 3.54

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

ItemTempoh

PeriodG

Sabah Sarawak

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

RM Per Kg RM Per Kg

I JH K L

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

Region

-14 -

Page 10: 05-JADUAL3

(4) Fabric reinforcement (samb.)

Fabric reinforcement (cont'd)

B7, MS145 2011 Dis 3.73 3.37 3.27 3.20 3.95 3.54

2012 Jan 3.51 3.37 3.27 3.20 4.08 3.54

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

B8, MS145 2011 Dis 3.50 3.31 3.22 3.20 3.89 3.48

2012 Jan 3.28 3.31 3.22 3.20 4.01 3.48

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

B9, MS145 2011 Dis 3.51 3.39 3.30 3.23 3.98 3.56

2012 Jan 3.29 3.39 3.30 3.20 4.11 3.56

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Item

I J

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

RM Per Kg

RM Per Kg

Kawasan*

Region

Tempoh

PeriodG H

Sabah Sarawak

K L

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

-15 -

Page 11: 05-JADUAL3

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)

B10, MS145 2011 Dis 3.05 3.49 3.39 3.23 4.09 3.67

2012 Jan 3.05 3.49 3.39 3.20 4.23 3.67

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

B12, MS145 2011 Dis 3.02 3.48 3.38 3.20 4.08 3.66

2012 Jan 3.02 3.48 3.38 3.20 4.21 3.66

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

C5, MS145 2011 Dis 3.07 3.33 3.24 3.20 3.91 3.51

2012 Jan 3.07 3.33 3.24 3.20 4.04 3.51

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

RM Per Kg

Item

RM Per Kg

Region

Sabah

G H

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

Sarawak

K

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

I J L

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Tempoh

Period

-16 -

Page 12: 05-JADUAL3

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)

C6, MS145 2011 Dis 3.08 3.56 3.47 3.20 4.19 3.75

2012 Jan 3.08 3.56 3.47 3.20 4.23 3.75

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

C7, MS145 2011 Dis 3.06 3.51 3.41 3.20 4.12 3.69

2012 Jan 3.06 3.51 3.41 3.20 4.25 3.69

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

C8, MS145 2011 Dis 3.08 3.56 3.47 3.20 4.19 3.75

2012 Jan 3.08 3.56 3.47 3.20 4.32 3.75

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

L

RM Per Kg

Item

Sabah

K

Sarawak

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

RM Per Kg

I

Kawasan*

Region

Tempoh

PeriodG H J

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

-17 -

Page 13: 05-JADUAL3

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)

C9, MS145 2011 Dis 3.04 3.48 3.38 3.23 4.08 3.66

2012 Jan 3.04 3.48 3.38 3.20 4.21 3.66

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

C10, MS145 2011 Dis 3.06 3.52 3.42 3.23 4.13 3.70

2012 Jan 3.06 3.52 3.42 3.20 4.27 3.70

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

DA4, MS145 2011 Dis 3.11 3.61 3.51 3.25 4.24 3.80

2012 Jan 3.11 3.61 3.51 3.20 4.37 3.80

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

H K

RM Per Kg

L

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

RM Per Kg

Item

Kawasan*

Region

Tempoh

PeriodG

Sabah

I J

Sarawak

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

-18 -

Page 14: 05-JADUAL3

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)

DA5, MS145 2011 Dis 3.31 3.65 3.55 3.23 4.29 3.84

2012 Jan 3.31 3.65 3.55 3.20 4.43 3.84

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

DA6, MS145 2011 Dis 3.23 3.54 3.45 3.23 4.16 3.73

2012 Jan 3.23 3.54 3.45 3.20 4.29 3.73

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

DA7, MS145 2011 Dis 3.12 3.43 3.34 3.23 4.03 3.61

2012 Jan 3.12 3.43 3.34 3.20 4.16 3.61

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Region

TempohSarawak

G H

Item

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

K L

RM Per Kg RM Per Kg

I JPeriod

Sabah

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

-19 -

Page 15: 05-JADUAL3

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd)

DA8, MS145 2011 Dis 3.07 3.38 3.28 3.23 3.97 3.55

2012 Jan 3.07 3.38 3.28 3.20 4.09 3.55

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

DA9, MS145 2011 Dis 3.07 3.37 3.27 3.23 3.95 3.54

2012 Jan 3.07 3.37 3.27 3.20 4.08 3.54

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

DA10, MS145 2011 Dis 3.20 3.51 3.41 3.23 4.12 3.69

2012 Jan 3.20 3.51 3.41 3.20 4.25 3.69

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

PeriodG H

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

K L

RM Per Kg RM Per Kg

I J

ItemTempoh

Sabah Sarawak

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

Region

-20 -

Page 16: 05-JADUAL3

(5) Guardrail Guardrail

Single mounted 2011 Dis 268.80 na na 298.13 na na

i)1.95m Post spacing 2012 Jan 268.80 na na 298.13 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

ii) 3.8m Post spacing 2011 Dis 197.27 na na 314.00 na na

2012 Jan 197.27 na na 314.00 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Double mounted 2011 Dis na na na 371.88 na na

i) 1.95m Post spacing 2012 Jan na na na 371.88 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.

The prices for guardrail are inclusive of transportation charges for 30km from the outlets.

na = Tidak diperoleh/Not available

K L

RM Per Meter RM Per Metre

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

ItemTempoh

Region

PeriodG H

Sabah Sarawak

I J

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

-21 -

Page 17: 05-JADUAL3

(5) Guardrail (samb.) Guardrail (cont'd)

ii) 3.8m Post spacing 2011 Dis na na na 357.75 na na

2012 Jan na na na 357.75 na na

Feb

Mac

Apr

Mei

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

na = Tidak diperoleh/Not available

* Kawasan/Region

G = Kota Kinabalu

H = Sandakan

I = Tawau

J = Kuching

K = Sibu

L = Miri

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)

Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)

Kawasan*

Region

Sarawak

ItemPeriod

G H I J

RM Per Meter RM Per Metre

K L

TempohSabah

-22 -