1
Process for this Production lot is unstable and therefore unpredictable over time. Need to identify the causes of instability and excess variation remove! Process for this Production lot remaining stable and predictable over time Lot 1 Lot 2 Lot 3 Lot 1 Lot 2 Lot 3 Variation between Production Lots. Need to remove the cause of variation between Lots! Predictable processes over time. Output from the process is consistent over time. Production Lots are delivering on requirements day in day out, month in month out, year in year out! 1 2 3 4

Transcript of 03boring processes single slide

Page 1: 03boring processes single slide

Process for this Production lot is unstable and therefore unpredictable over time. Need to identify the causes of instability and excess variation

remove!

Process for this Production lot remaining stable and predictable over time

Lot 1

Lot 2Lot 3

Lot 1

Lot 2

Lot 3

Variation between Production Lots. Need to remove the cause of variation between Lots!

Predictable processes over time. Output from the process is consistent over time. Production Lots are delivering on requirements

day in day out, month in month out, year in year out!