03 TITLE - WHITE NAME BOSKALIS OFFSHORE...
Transcript of 03 TITLE - WHITE NAME BOSKALIS OFFSHORE...
-
SLIDE NAME IN TEMPLATE:
\
1
03 TITLE - WHITE NAME
SLIDE EXAMPLE: SET UP GRIDS AND GUIDES:
Grids and guides make it easier to align shapes and objects
(index, chart, table etc.). Grids and guides can be shown or
hidden.
Right-click on an empty area of the slide and then click Grid
and Guides.
Check under Guide settings → the button Display drawing
guides on screen.
If you want the current settings in the Grid and Guide dialog box
to be the default settings for all presentations, rather than just
this one, click Set as Default.
Drawing guides are not visible during a slide show and do not
show on prints or handouts.
BOSKALIS COLORS:
RGB values:
R 255, G 255, B 255
R 0, G 0, B 0
R 255, G 247, B 25
R 0, G 38, B 99
R 0, G 81, B 158
R 127, G 127, B 127
R 191, G 191, B 191
R 49, G 128, B 255
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
GERTJAN GRUNDLEHNER
SANDER STEENBRINK
UNDERWATER MINING INSTITUTE 2012 – SHANGHAI, CHINA 27 september 2012
16 – 17 OCTOBER 2012
BOSKALIS OFFSHORE MINING
-
SLIDE NAME IN TEMPLATE:
\
2
05 INDEX 1 COLUMN & PICTURE 50/50
INDEX
SLIDE EXAMPLE:
USE THE INDEX:
Click on the index
Please edit your chapter numbers and titles
Right-click on the rows to delete the rows you do not need.
See refer to the example slide on the right for the desired use of
font color. The font should be black, unless the index headings
corresponds to the next section of the presentation in which
case the font should be blue. For the correct blue font color go
to the Home command tab, in the font group, click font color
“Dark blue” (R0 G81 B158).
If you have more than 8 chapters, please use template:
06_ Index 2 columns 50/50.
For an index like the examples, please use an existing slide
from the corporate presentation.
USE AN EXISTING SLIDE!
Go to www.boskalisbrandportal.com guidelines \ digital
items \ presentations to download the corporate
presentation.
Find an existing INDEX slide and use this as a basis.
Copy (CTRL+C) paste (CTRL+V) the desired slide.
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
01 BOSKALIS INTRODUCTION
02 ONSHORE MINING EXAMPLE
03 OFFSHORE MINING EXAMPLE
-
SLIDE NAME IN TEMPLATE:
\
3
12 TEXT & FULL SCREEN PIC 80/20 (ANIMATED)
EXPLANATION ANIMATION IN THE PRESENTATION VIEW:
NOTE: After inserting the picture, right-click on the picture and Send to Back to place it in the background behind your text. In presentation mode, the
picture will show full screen before the text slides in to covers 80% of the picture.
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
Leading global dredging & marine expert
Provide Solution: innovative, sustainable and all-round for infrastructural
challenges in the maritime, coastal and delta areas of the world
Sustainability and safety are a top priority
Wide range of maritime services comprising dredging, dry infrastructure,
towage, salvage, transport and heavy lift
Founded in 1910
Main clients include oil and gas companies, port operators, shipping
companies, EPC contractors, government agencies, international project
developers, insurance companies and mining firms.
PROFILE
-
SLIDE NAME IN TEMPLATE:
\
4
18 EMPTY
SLIDE EXAMPLE:
OUR ACTIVITIES
-
SLIDE NAME IN TEMPLATE:
\
5
07 PICTURE FULL SCREEN
SLIDE EXAMPLE:
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
OUR WORLD
14,000 employees
1,100 vessels
75 countries
across 6 continents
-
SLIDE NAME IN TEMPLATE:
\
6
07 PICTURE FULL SCREEN
SLIDE EXAMPLE:
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
BOSKALIS ONSHORE & OFFSHORE MINING
-
SLIDE NAME IN TEMPLATE:
\
7
07 PICTURE FULL SCREEN
SLIDE EXAMPLE:
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
BAUXITE MINING LELYDORP I - SURINAM
-
SLIDE NAME IN TEMPLATE:
\
8
10 TEXT & PICTURE 50/50
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
Overburden layers
(6-25m) in large
quantities
Independent of
bearing capacity
Elevation around sea
level and availability of
water
High productions
possible with dredging
DREDGING FOR OVERBURDEN REMOVAL
-
SLIDE NAME IN TEMPLATE:
\
9
11 TEXT & TEXT 50/50
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
WORK SEQUENCE LELYDORP I PROJECT
-
SLIDE NAME IN TEMPLATE:
\
10
07 PICTURE FULL SCREEN
SLIDE EXAMPLE:
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
MOBILIZATION OF THE DREDGER TO SITE
-
SLIDE NAME IN TEMPLATE:
\
11
18 EMPTY
SLIDE EXAMPLE:
CHATHAM RISE ROCK PHOSPHATE
- 400 m
250+ nm
-
SLIDE NAME IN TEMPLATE:
\
12
18 EMPTY
SLIDE EXAMPLE:
MINING METHOD DEVELOPMENT
Lifting Method
Preparation
Extraction Mining tool(s), Support, motivation
Separation Process and installation Tailings
Environmental
criteria
Offloading
Ship and shore facilities
Transport
Same or separate ship
-
SLIDE NAME IN TEMPLATE:
\
13
18 EMPTY
SLIDE EXAMPLE:
OR IN THIS SEQUENCE … OR ?
Lifting Method
Preparation
Extraction Mining tool(s)
Support, motivation
Separation Process and installation
Tailings
Environmental
criteria
Offloading
Ship and shore facilities
Transport
Same or separate ship
-
SLIDE NAME IN TEMPLATE:
\
14
11 TEXT & TEXT 50/50
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
DESIGN PROCESS IN A NUTSHELL
-
SLIDE NAME IN TEMPLATE:
\
15
11 TEXT & TEXT 50/50
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
USUAL QUESTIONS…
• SIMPLE, ROBUST, CHEAP, CLEAN AND SAFE ?
• PROVEN AND INDUSTRY ACCEPTED ?
• DO IT WITH EXISTING EQUIPMENT ?
• TIME TO MARKET ?
• RENEWAL / REPLACEMENT AVAILABLE ?
• RE-USE THE EQUIPMENT ?
THE ANSWER…
-
SLIDE NAME IN TEMPLATE:
\
16
11 TEXT & TEXT 50/50
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
GEOPHYSICS
PRODUCTION CALCULATION
COST ESTIMATION
SEPARATION TECHNOLOGY
NAVAL ARCHITECTURE
MECHANICAL DESIGN
ECOLOGY
HYDROGRAPHIC SURVEY
DREDGING RESEARCH
PROJECT MANAGEMENT
BUSINESS UNIT MANAGEMENT
MULTI-DISCIPLINARY TEAM EFFORT
-
SLIDE NAME IN TEMPLATE:
\
17
PRIMARY EXTRACTION METHOD
Host sediment layer (35 cm avg,
silty, weakly cohesive)
Ooze (sticky, clayey chalk)
NOT to be mined
Suited for fluidisation
jet water
suction
‘Normal drag head’
-
SLIDE NAME IN TEMPLATE:
\
18
11 TEXT & TEXT 50/50
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
EXISTING SYSTEMS MAX 160 M WD…
SUPPORT / MOTIVATION
Max ~60
deg
SEABED
TRACTOR?
TRACTION =
WEIGHT = …
-
SLIDE NAME IN TEMPLATE:
\
19
10 TEXT & PICTURE 50/50
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
Our best partners:
BOSKALIS DEEPTRAIL CONCEPT
1.5 m2/sec => NO delays on seabed
+
Traditional pipe replaced by hose and
wires
Traction through tow wire equilibrium
Tolerable to heavy seas
SUPPORT / MOTIVATION
-
SLIDE NAME IN TEMPLATE:
\
20
18 EMPTY
SLIDE EXAMPLE:
ORE SEPARATION CLOSE TO SOURCE?
Pro: Near seabed gives less lifting requirements
Con: Less control of process and tailings
Con: More complexity subsea
Con: Deployment and intervention
-
SLIDE NAME IN TEMPLATE:
\
22
18 EMPTY
SLIDE EXAMPLE:
ORE SEPARATION AT SURFACE VESSEL
Con: More lifting pump power
Pro: Full control of variable separation process
Pro: Keep continuous hydraulic process
Pro: Only fully proven components subsea
1
4
3
2
-
SLIDE NAME IN TEMPLATE:
\
23
18 EMPTY
SLIDE EXAMPLE:
RETURN OF TAILINGS
CRP-target = minimal environmental effects
No tailings on areas to be mined
To keep in pace with production
Resulted in substantial return system
-
SLIDE NAME IN TEMPLATE:
\
24
18 EMPTY
SLIDE EXAMPLE:
ENVIRONMENTAL CONTROL
Detailed plume development studies
Effect of sediment resuspension on benthic life
Mining plan to enhance re-colonisation
(Building with Nature – ecological sand pit MV2)
These studies used by CRP in dialogue with NZ community
-
SLIDE NAME IN TEMPLATE:
\
25
11 TEXT & TEXT 50/50
SLIDE EXAMPLE: BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
TRANSPORT TO SHORE
Dry end product to shore
Various unloading locations
On-site transshipment max’s mining time
Harsh waves on Chatham Rise
Crew changes, bunkering, R & M
http://en.wikipedia.org/wiki/File:Turbid_Waters_Surround_New_Zealand.jpg
-
SLIDE NAME IN TEMPLATE:
\
26
18 EMPTY
SLIDE EXAMPLE:
THE RESULT
On-going (engineering, financing, environmental, …)
Decisions evolve with overall criteria
Developing insights lead to change in weighing
Design choices fully inter-linked and dynamic
Handled effectively by team with common goal
Central driver is the project (not the tools)
Other mining projects lead to other solutions
Open cooperation with concession holder
is instrumental
Boskalis can cover all these aspects
-
SLIDE NAME IN TEMPLATE:
\
27
18 EMPTY
SLIDE EXAMPLE:
THE JOURNEY HAS JUST BEGUN