Scoe
This document enumerates about de-shuttering and curing wor !rocedures which wi"" be used inA##ODE $TROA%E &'()D)#% CO#$TR'CT)O# AREA at north side
1 | P a g e
-
7/25/2019 02 MS for Curing
2/2
METHOD STATEMENT FORCURING & DE-SHUTTERING
DATE : 25-OCT-15
REV : 00
A' De-()*tter+,
De-shuttering is the acti*it+ that remo*a" o, shuttering and su!!orting accessories ,rom casted
hardened concrete
Proce.*re
1 Tie rod and connections sha"" be "oosened
2 .orm wor sha"" be stri!!ed o/ ,rom the concrete ,ace using hand too"s
Area sha"" be c"eaned a,ter remo*a" o, ,ormwor
$' C*r+,Curing is the !rocess in which the concrete is !rotected ,rom "oss o, moisture and e!t within a
reasonab"e tem!erature range This !rocess resu"ts in concrete with increased strength anddecreased !ermeabi"it+ Curing is a"so a e+ !"a+er in mitigating cracs which can se*ere"+ a/ectdurabi"it+
Met)o. o/ C*r+,
Sr+,+, ,. %et co3er+,4 once the concrete has set sucient"+ to !re*ent water erosionordinar+ "awn s!rin"ers are e/ecti*e i, good co*erage is !ro*ided and water runo/ is o, no concern )tsha"" be in !articu"ar inter*a"s in such a wa+ that dr+ing o, concrete sha"" a*oid (a+ing o, 3essian4gunn+ c"oths on concrete ,ace is more e/ecti*e
Proce.*re
A,ter initia" setting o, concrete ,orm wor wi"" be remo*ed and area sha"" be c"eaned ,rom
debris 6 shuttering materia"
$ur,ace re!airing sha"" be done i, re7uired Tie rod ho"es sha"" be c"osed using a!!ro*ed
materia"s
$!rin"ing and wet co*ering method wi"" be used ,or curing o, !edesta"s
8ater tan sha"" be e!t at site Tan wi"" be 9""ed with drining water b+ water taner
8ater sha"" be s!rin"ed using water !um! and hose !i!e or manua"
Curing acti*it+ wi"" be continued ,or at "east da+s ,rom date o, concreting
2 "a+ers o, bituminous coat sha"" be a!!"ied on concrete ha*ing contact with soi" ,or 7ua"it+
contro"
S/et C*t+o,( ;;E shou"d be worn a"" times
E"ectrica" cab"es shou"d be checed
8e"" houseee!ing shou"d be maintained