Pearl GTL Project

LINDE ENGINEERING

Contractor Project No: 5887 Shell Project No: HP-3000-QAT

Project Document Number: T- 4.234.083 Project Rev.: A Page 2 of 15

Purchase Order Number: 2MH127

N/A Tag/Item Number(s):

ASU Unit(s):

Z PCWBS:

Page 4: 017-CIVIL-MS for Installation of Fence & Gate.pdf

QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

D A 09.01.2008 Ready For Construction SB UA/MC ZG RFC

C O 30.09.2007 Issued for Company comments IO MC ZG ICC

B 29.09.07 Issued for Review IO MC ZG IFR

A 27.09.07 Issued for Internal Review IO MC ZG IIR

Approved By

GAMA Project Rev Rev. Date Description Prepared

By Checked

By Status

No. No. ORIGINATOR

Document Title:

LINDE ENGINEERING AG

METHOD STATEMENT FOR INSTALLATION OF FENCE AND GATE

Document No.

GAM MTS CIV GTL 017 D LOC470

Contractor

Gama Qatar Co. W. L. L. Org.

Code Doc. Type

Disc. Code

Geogr. Area

Seq. No

Rev. No Vendor Code

Project Document Number: T- 4.234.083 Rev No: A

Page 5: 017-CIVIL-MS for Installation of Fence & Gate.pdf

Doc. Title : MS FOR INSTALLATION OF FENCE AND GATE

Doc. No. : GAM-MTS-CIV-GTL-017 Date : 09.01.2008 REV. D

T-4.234.083 Rev. A Page 4 of 15

QQQ AAA TTT AAA RRR

TABLE OF CONTENTS

1. PURPOSE __________________________________________________________________________5

2. SCOPE _____________________________________________________________________________5

3. HSSE ______________________________________________________________________________5

4. REFERENCES ______________________________________________________________________6

5. DEFINITIONS ______________________________________________________________________6

6. RESPONSIBILITY ___________________________________________________________________7 6.1. Site Manager ___________________________________________________________________________ 7 6.2. Civil Works Manager____________________________________________________________________ 7 6.3. Site Engineer ___________________________________________________________________________ 7 6.4. Work Supervisor________________________________________________________________________ 7

7. EQUIPMENT & MANPOWER _________________________________________________________8 7.1. Equipment _____________________________________________________________________________ 8 7.2. Manpower _____________________________________________________________________________ 8

8. METHOD OF EXECUTION ___________________________________________________________9 8.1. Pre-Commencement Works_______________________________________________________________ 9

Existing Underground Facilities __________________________________________________________________________ 9 Access Roads_________________________________________________________________________________________ 9 Barricades, Safety Signboards & Night Activities ____________________________________________________________ 9 Order of Precedence ___________________________________________________________________________________ 9

8.2. Installation of Fence and Gate____________________________________________________________ 10 Surveying and Mark-Up _______________________________________________________________________________ 10 Foundation Works and Installation _______________________________________________________________________ 10

9. ATTACHMENTS____________________________________________________________________11 9.1. JSA__________________________________________________________________________________ 11 9.2. Fence and gate diagram _________________________________________________________________ 11 9.3. TSF area layout________________________________________________________________________ 11

Page 6: 017-CIVIL-MS for Installation of Fence & Gate.pdf

Doc. Title : MS FOR INSTALLATION OF FENCE AND GATE

Doc. No. : GAM-MTS-CIV-GTL-017 Date : 09.01.2008 REV. D

T-4.234.083 Rev. A Page 5 of 15

QQQ AAA TTT AAA RRR

1. PURPOSE

This document describes the methods proposed to be used for the installation of temporary fence that will be carried out as part of ASU Construction Works of Qatar Shell GTL Plant (Pearl) in Ras Laffan Industrial City of Qatar including the works in the TSF Area.

2. SCOPE

The fence components will be transported to site on trucks and will be offloaded near the area. This document covers the installation of delivered components to form a temporary fence.

The fence will be installed in Gama TSF Area as per the attached layout (Please see Attachment)

3. HSSE

All works will be in compliance with the State of Qatar laws and regulations, Ras Laffan Industrial City and international standards/codes, and Company and Contractor requirements and instructions.

All personnel will go through Gama, Linde and Company Safety Induction courses as well as other trainings as identified by their supervisor. Please see Document Number GTL-GM-001-A-5635 for details.

A Job Safety Analysis (JSA) specific for this work including a Risk Assessment, is prepared as per Gama procedure GTL-GM-001-A-5626 and is attached herein. Such JSA addresses the hazards associated with each task within the scope of this Method Statement and introduces the controls that will be implemented to reduce the associated risks to acceptable levels. The JSA will be used by the Site Supervisor as the basis of his TSTI / TSTO and Toolbox Talks.

All personnel will have PPE required for their specific tasks in addition to the minimum PPE (coveralls, safety goggles, safety shoes, high-visibility vests, gloves) at site at all times as required.

In the event of a release, fire or explosion, employees will secure their area and evacuate to the nearest muster point. Once all employees are evacuated the supervisor will conduct a headcount to verify all employees are out of harms way. The supervision will report this to Contractor. Emergency Contact numbers for Company, Contractor and Gama will be posted onsite.

All vehicles and equipment used for the subject work will be inspected and certified as required.

Drivers and operators will be competent and will have attended all required trainings set forth in project procedures and specifications.

Page 7: 017-CIVIL-MS for Installation of Fence & Gate.pdf

Doc. Title : MS FOR INSTALLATION OF FENCE AND GATE

Doc. No. : GAM-MTS-CIV-GTL-017 Date : 09.01.2008 REV. D

T-4.234.083 Rev. A Page 6 of 15

QQQ AAA TTT AAA RRR

4. REFERENCES

DEP 34.13.20.31-Gen : Roads, Paving, Surfacing, Slope Protection and Fencing (Technical Specification)

T-13.376.353 : Amendments and/or Supplements to Roads, Paving, Surfacing, Slope Protection and Fencing

T-4.234.084 : Method Statement for Lifting (General) DEP 34.19.20.31-Gen : Reinforced Concrete Foundations and Structures

T-13.376.358 : Amendments and/or Supplements to Reinforced Concrete Foundations and Structures

5. DEFINITIONS Company : QSGTL or its PMC (JK) Contractor : Linde Engineering AG Subcontractor : Gama Qatar Co. W. L. L. Contract : QSGTL Pearl Plant – C2 ASU Construction Works QCP : Quality Control Procedure ITP : Inspection and Test Plan QA/QC : Quality Assurance / Quality Control JSA : Job Safety Analysis

Page 8: 017-CIVIL-MS for Installation of Fence & Gate.pdf

Doc. Title : MS FOR INSTALLATION OF FENCE AND GATE

Doc. No. : GAM-MTS-CIV-GTL-017 Date : 09.01.2008 REV. D

T-4.234.083 Rev. A Page 7 of 15

QQQ AAA TTT AAA RRR

6. RESPONSIBILITY

6.1. SITE MANAGER

The site manager will provide inputs to the project execution plan to ensure that strategies & philosophy are properly addressed.

6.2. CIVIL WORKS MANAGER

The Civil Works Manager is responsible for the overall management of the project construction team to ensure that safe and effective operations are conducted and properly documented.

6.3. SITE ENGINEER

He will be overall responsible for safe execution of the whole job including:

• Confirming the installation location from schedule of approved construction drawings.

• Organizing of equipments and tools needed for the job.

• Assigning skilled personnel for the job.

• Sequence of activities to be carried out for the work as per this method of statement.

• Conduct inspection and surveillance.

• Notify to Contractor engineer for inspection as applicable.

• Ensure all Contractor and Company regulations are followed.

• Ensure all personnel involved are in safe working condition.

6.4. WORK SUPERVISOR

He will be responsible for safe execution of the following activities: • Conduct TSTI with the concerned work force prior to start the work.

• Ensure that relevant work permits for the job are obtained prior to start the work.

• Conduct daily toolbox talks for the entire work force prior to start day work.

• Assigning a competent work crew for specific activities, details of activities and task information will be given to the work crew.

• Organizing tools and equipment needed to the work site.

• Inspection and supervision of work.

• Ensure all Contractor and Company safety regulations are followed as applicable.

Page 9: 017-CIVIL-MS for Installation of Fence & Gate.pdf

Doc. Title : MS FOR INSTALLATION OF FENCE AND GATE

Doc. No. : GAM-MTS-CIV-GTL-017 Date : 09.01.2008 REV. D

T-4.234.083 Rev. A Page 8 of 15

QQQ AAA TTT AAA RRR

7. EQUIPMENT & MANPOWER

All equipment will be inspected and approved by the Contractor, when required, and all personnel will be inducted and trained before and during mobilization.

7.1. EQUIPMENT

• Temporary Fence Components

• Hand Tools

• Boom-Truck

7.2. MANPOWER

• Site Engineer

• Foreman (Work Supervisor)

• HSSE Officer(s)

• Common Labourer(s)

If the above-listed equipment or manpower proves not sufficient for the timely completion of the facilities and project; additional will be provided to complete the works on time and in line with rules, regulations and specifications of Contractor, Company and RLIC.

Page 10: 017-CIVIL-MS for Installation of Fence & Gate.pdf

Doc. Title : MS FOR INSTALLATION OF FENCE AND GATE

Doc. No. : GAM-MTS-CIV-GTL-017 Date : 09.01.2008 REV. D

T-4.234.083 Rev. A Page 9 of 15

QQQ AAA TTT AAA RRR

8. METHOD OF EXECUTION

8.1. PRE-COMMENCEMENT WORKS

Existing Underground Facilities

Prior to work commencement, the existing and possible underground structures and installations will be checked by means of As-Built Drawings issued by the Contractor or the Company. The locations of such installations will be marked at site and posted with signs. After the area has been barricaded, possible relocation or removal applications for the same will be studied. Same studies will be submitted to the Contractor and the Company for approval. Should any underground facility be encountered in spite that they have not been pointed out in the drawings, Contractor will be informed immediately; and approval of Contractor and Company will be waited before proceeding with the relocation or removal of the same. The barricades for such activities will be temporary.

Access Roads

The locations of access roads within the execution area will be pointed out by the Contractor. These access roads will be used for the planning of concrete activities within the area. However, the access roads may be diverted for some periods during the execution of the works in order to ensure smooth execution of the works in the area. Nevertheless, no such diversion will take place without prior written consent of the Contractor or the Company. After the locations of access roads have been excavated, they will be backfilled to allow traffic in and within the area.

Barricades, Safety Signboards & Night Activities

All work areas will be barricaded and posted with signs before any work starts. Barricades will be formed by black pipes (steel); and the signboards will be placed as needed. Barricades will be kept in place until the work done and the areas have been filled.

Since no night activities are foreseen for the time being, the site will be kept closed during the night preventing any pedestrian or vehicle traffic. The requirement for illumination will be reviewed by Contractor, when this condition is expected to change due to other works or a change in the work schedule. Or by the time, night-work activities are foreseen, the site will be illuminated for workers to execute relevant works. Order of Precedence

In case of any conflict with this document and Project Specification “Roads, Paving, Surfacing, Slope Protection and Fencing (DEP 34.13.20.31-Gen)” and all its Amendments and/or Supplements, the latter (Project Specification) will prevail.

Page 11: 017-CIVIL-MS for Installation of Fence & Gate.pdf

Doc. Title : MS FOR INSTALLATION OF FENCE AND GATE

Doc. No. : GAM-MTS-CIV-GTL-017 Date : 09.01.2008 REV. D

T-4.234.083 Rev. A Page 10 of 15

QQQ AAA TTT AAA RRR

8.2. INSTALLATION OF FENCE AND GATE

Surveying and Mark-Up Corners of the area or end point of the line to be fenced will be determined and marked by the usage of existing monuments. Between marked corner points or end points, fence line, gates and terminal post will be located with stakes not exceeding 152 m distance or line of sight between each other. After determining fence line alignment within 12 mm tolerance, footings locations will be marked for excavation and further progress. Distance not exceeding 3 m between two adjacent line post, and 1 intermediate pull post at every 150 m (max.) interval will be the criteria for marking, except for gate locations.

Foundation Works and Installation Excavation for foundation will be performed according to footing dimensions which are tabulated in Table-1 below.

Table 1 – MINIMUM FOOTING DIMENSIONS

Post Description Depth (mm) Diameter (mm)Line Posts 1000 300 Corner/End post 1250 450 Pull posts 1250 450 Gate posts for gate leaf up to 1.5 m width 1250 450 Gate posts for gate leaf between 1.5 m and 3.0 m 1500 600 Gate posts for gate leaf between 3.0 m and 5.0 m width 1500 700

Depth of excavation will be modified in order to provide proper vertical alignment. All debris and water will be removed from the excavation and, plain concrete, of which mix and construction will be in accordance with the project specifications DEP 34.19.20.31-Gen and T-13.376.358 (See references) will be poured. In case of excavation of granular soil, mold will be provided. Post will be supported preventing misalignment during pouring of concrete.

Access to the post will be prevented by soft barricades in order to prevent misalignment up to setting of concrete.

The depth will be measured from finished grade to bottom of concrete. The bottom of concrete will be at least 100 mm below the bottom of the line post and 150 mm below the bottom of the corner/end post, pull post and gate post.

Footings will be cylindrical in shape with a top of concrete being 100 mm above finished grade as measured at the post and sloping away from the post with at least a 12 mm drop.

After erection of posts and setting of concrete, fence and gate fabric barbed wires, tension wires, top rail, stretcher bars, braces, extension arms and gate hardware will be installed in accordance with the approved drawings. Both sides of fence will be cleared and graded for a distance of 600 mm at each side of fence line in order to remove or fill irregularities causing clearance more than 50mm below the bottom of the fence and gate. Openings such as drainage areas, culverts or troughs will be closed by barriers, or as approved by the Contractor, without preventing the water flow.

Any work described herein will be carried out as per the relevant Method Statement.

Page 12: 017-CIVIL-MS for Installation of Fence & Gate.pdf

Doc. Title : MS FOR INSTALLATION OF FENCE AND GATE

Doc. No. : GAM-MTS-CIV-GTL-017 Date : 09.01.2008 REV. D

T-4.234.083 Rev. A Page 11 of 15

QQQ AAA TTT AAA RRR

9. ATTACHMENTS

9.1. JSA

9.2. FENCE AND GATE DIAGRAM

9.3. TSF AREA LAYOUT

Page 13: 017-CIVIL-MS for Installation of Fence & Gate.pdf

JSA For: T-4.234.083

Normal Approvals: Name DateJSA by:

Job Supervisor:

Name DateDiscipline Superindent (Linde)

HSSE Representative (Linde)

2.Permit To Work.

LINDE EMERGENCY TELEPHONE NO. HSSE MANAGER: Pearl HOT LINE :

JOB SAFETY ANALYSIS FORM

Page No: 1 of 3 Job being analysed: Installation of Fence and GateDepartment/Section doing JSA: HSSE & Construction JSA Members:

Job Performers:General job requirements / Common Personal Protective Equipment.

Signature

1. The following Personal Protective Equipment shall be worn:Approved coveralls, safety goggles, safety helmet, safety shoes and gloves. Signature

OTHERS (List Below):

Additional Approvals (Determined by Job Supervisor in correlation with Linde HSSE Manager).

Approval required for hazardous work detailed in the Linde Work Permit Procedure.Changing conditions and emergency proceduresStop work. Switch off equipment.Supervisor directs personnel to nearest and safest muster point considering wind direction. Supervisor counts all employees. Missing employees are reported to Linde HSSE Dept. When all clear is given check with Linde HSSE before returning to work.

NEW REVISED

QQQ AAA TTT AAA RRR

Page 14: 017-CIVIL-MS for Installation of Fence & Gate.pdf

RISKRANK

1.1 1.1.1 Ensure employee use proper lifting techniques i.e. lift with their legs not their back.

1.1.2 Use the "Buddy System" get help.1.1.3 Break the job down into manageable

portions.1.2 1.2.1 Area shall be properly maintained

and all materials must be properly stored and picked up.

1.2.2 Housekeeping shall be on on going and picked up at the end of the day.

1.3 1.3.1 Ensure all employees use proper PPE i.e. coveralls, helmet, safety goggles, gloves and safety shoes.

1.3.2 Use the right tools for the job.2.1 2.11 Area shall be properly maintained all

equipment and materials must be properly stored and picked up.

2.1.2 Housekeeping shall be on going and picked up at the end of the day.

2.2 2.2.1 Ensure equipment operators and all others that can be exposed to loud equipment noise wear hearing protection.

2.2.2 Install warning signs in high noise areas.

2.2.3 Discuss working at height hazards in daily TSTI.

2.3 2.3.1 Equipment operators shall be competent in the safe use and operation of their equipment.

2.3.2. Provide fire extinguisher in the area.

JOB SAFETY ANALYSIS / RISK ASSESSMENTFOR T-4.234.083

SCOPE : INSTALLATION OF FENCE AND GATE

Residual RiskInitial Risk

ITEM ACTIVITY CPCONSEQUENCESHAZARDS / POTENTIAL ADDITIONAL

CONTROLSMAIN

CONTROLS

LOW

LOW

A

RP C

1

2

LOW

1 Installation of fence. Back injury ( Manual handling).

A

Slip, trip and fall hazards.

B

Hand & Finger caught during fixing fence wires. A

3 LOW A

1 LOW

2 LOW A

2

Slip, trip, and fall hazards.

B 2 LOW A 2 LOW

Exposure to Loud Noise (hearing damage).

B 2 LOW A 2 LOW

Improper use of equipment

B 3 LOW

2.3.1.12.3.1.22.3.1.3

Inspected before use.Discuss in daily TSTI.Updated color coded equipment. A 3 LOW

2 Backfilling and Compaction Works.

QQQ AAA TTT AAA RRR

Page 15: 017-CIVIL-MS for Installation of Fence & Gate.pdf

RISKRANK

JOB SAFETY ANALYSIS / RISK ASSESSMENTFOR T-4.234.083

SCOPE : INSTALLATION OF FENCE AND GATE

Residual RiskInitial Risk

ITEM ACTIVITY CPCONSEQUENCESHAZARDS / POTENTIAL ADDITIONAL

CONTROLSMAIN

CONTROLS RP C

QQQ AAA TTT AAA RRR

3.1 3.1.1 Mouisturize debris to control dust.3.1.2 Ensure employees wear dust masks.

3.1.3 Ensure employees wear goggles.3.2 3.2.1 Provide warning signs.

3.2.2 Barricade and secure the working area.

3.2.3 Unnecessary personnel shall be excluded from the removal of debris working area.

3.2.4 An adequate number of trained Banks-men shall be assigned as necessary to control work. Ensure Banks-men shall wear high-visibility vest.

3.2.5 Discuss in daily TSTI.3.3 3.3.1 All materials on the trucks should be

effectively secured during transportation.

3.3.2 Operators and Supervisor shall ensure that the vehicle is not overloaded.

A

3

3 Removal of Debris. Dust hazards.

B 2 LOW

LOW

2 LOW

People struck by trucks and loaders.

B 3 LOW

3.2.1.1 Audible Reverse Alarm.

A LOW

Debris materials falling from trucks.

B 2 LOW A 2

Page 16: 017-CIVIL-MS for Installation of Fence & Gate.pdf
Page 17: 017-CIVIL-MS for Installation of Fence & Gate.pdf

II11/I~

Ii 0.,e-I

:>:>~-

l..!:J

0I.-u"'~

0I -'"ur--ai~ N

"I

~~~ "'

I

N~

\0 Uo

" "'a

'm W~E '0Ad

~":':'RY)

0 '9I ," ..'cr> 0

N NIocr>

a- I-'00 '" FUEL GAS LINE' FIB" OPT" CABLE

-

e-[L",ZOU<I

[LV>

I~!g~,>-;:5:;)~

01;;:3:(:5

V>CD

AVENUE-+- -\---

!! Ii" "

ITES

""ERS UNLESS NOTED OTHERWISE

ICES SHOWN ON THIS ORA.,NG ARE

INED DURING EPG PHASE.

.0000INATESBY C'OSS '''ERENCE TO

I 7

I

0UIU

Uo

"'~U::'

-

0 '0 160 240 J20

I I I I ~SC<LE . ,"000

"ETRES

~

~~0ow.

~~~

,~~~''7'

(7;W

hll

i II

~ ~ Il' I ~'-..'1

I

"' !"Z.'</

II l'..' ~ ~ ~~DODOO ( ~~~M~~i 000.000 (.opBY OTHER"

..

-==tl

~.' II1I

I'llII

e-,W

~?

1+;

:1II!IIIIIItIIIIIIIIII~

~III III IIIIII~

+~I~IIIIII I

I!

~ I~~t;'E I!~ I

~-,IIII

"

REFERENCE DRAWINGS

SITE "ASTER PLAN- 'AS WFAN OATAR

DFFSITES CABU' ROUTING LAYOUT

JETTY. PlPERAG</ UWTY GRID CONNECTION

TITlE

OFFS"ES lJ\YOCWN CONCEPT

PHASE' lJ\YOOWNAREAS

KEY PlJ\N OFF-SITE "<-ONS - RAS WFAN OATAR

THIS DRAWINGINCORPORATES'''''StON 'G" OF THESITE MASTERPU\N - RAS lJ\FFAN OATAR l

I 6 I

BENCH"ARK DRAWINGS

"'N ROAD CD-ORID'NATES

5

549

1

0I

"'r--Uo

~

'" 0We-I~~[;;5[L:2

"!!.,

-\1~i!.,

DRA.,NG NU"BER

H3."9,'DI

H3.377.264

H3.377..61

T-".377.459

T-".3",'"

T-'.D.9,99'

T-'.599.419

4

,/1/ II--

1\,~!

0I

"'"Uro~

!IEj

Ii

51

U

/0

NI

U~"

0I

0N

1'6~~e~o~~~~~~~~~

1

;1a'a!

I--

Pearl GTL Project-Qatar ImI!IKBRI"-~~.__.---ThOdoc,m~1" ",'Id~tlol. N.'h~ ~. whoi."" °"1'po" 01 'hi, do..~"' mo, b. ~..,~p""~", ..,;.d, ..~d " ooy~I,"~ ."I.m " ,,,,,m,,.d " 00, I~ " '" ~, m~",~~~~~r,~;';:~~1:!;, '=~f~1' '>:'~:'~~I ~rn'~;~"~, o;.,~::"~~~.'" 'h;" po'"

I--

CONSTRUCTIONOFFSITE LAYDOWN AREAS

PROJECT/GROUP/LDCATI~ CONTRACTORPROJECTNo 5887

CONTRACTORCONTRACTN, OR~INATINGO'GANlSATION JKP IAM W KELLOGG

3 '1

PewBSI Y

SCALEI 1:4000 T-4,599.412 REVI H2 1

990

\\ ))

II -I/!!>F: BDlffH LAY DDWN AREA Ie

LEGEND I H ,7SEP07 eM AC JDP RE-ISSUED FOR CONSTRUCTION

G '3JUL07 BM AC RB RE-ISSUED FOR CONSTRUCTION

F '4JUN07 JM AC Re RELEASED FOR CONSTRUCTION JBE 19MAR07 JC AC RB RE-ISSSUED FOR INFORMATION

"SSUE DATE MADE CHECK'D APPR'D DESCRIPTION