01 site location & surrounding...
Transcript of 01 site location & surrounding...
WALTHAMSTOWCENTRAL
BLACKHORSE ROAD
TOTTENHAM HALE
SOUTH TOTTENHAM
BRUCE GROVE
ST JAMES STREET
WALTHAMSTOW QUEENS ROAD
SEVEN SISTERS
VICTO
RIA LINE
HIGH MAY
NARD
RESER
VOIR
WALTHAMSTO
W
RESER
VOIRS
LOW M
AYNARD
RESER
VOIR
LOCKWORD RES
ERVO
IR
STAMFORD HILL
MandoraTAYLOR WIMPEYMACDONALD EGANWATKINS JONES
site area: 2.76 ha
density: 836 hr/ha
residential: 483 residential
519 student housing
commercial: 1,080m²
parking: 133 spaces
Royal StandardTFC
site area: 0.23 ha
density: 609 hr/ha
residential: 50 (private sale)
commercial: 1,741m²
parking: 19 spaces
Ferry WayLEGAL & GENERAL
site area: 1.6 ha
density: 684 hr/ha
residential: 440 private rented sector
commercial: 2,069m²
parking: 29 spaces
N
N
01 site location & surrounding development
under construction
permitted
submitted for planning
initial design stage
proposed green infrastructure
PERMITTEDUNDER
CONSTRUCTION
SUBMITTED FOR PLANNING
PERMITTED
Site Location Plan
MasterplanNTS
02 site history
Aerial photo of the Associated Equipment Factory
Buses under construction on the assembly room floor
Assembled buses on the dog-leg site
Marine Engine House
The AEC Routemaster
1909 | X Type
1909-1919 | B Type
1919 | K Type
1920-1927 | S Type
1923-1930 | NS Type
The Associated Equipment Factory
The current site boundary can be traced back to the establishment of the Associated Equipment Factory in 1908.
The Associated Equipment Company manufactured motorised London buses
on the site until 1927.
The forms and layouts of the modern London bus which were developed and
established in the vehicles designed here would later evolve to become the
ubiquitous Routemaster.
03 masterplan evolution
Current Proposals
- Redesign of massing to increase dual aspect units
- Improved site permeability
Section B-B
Section A-A
Ferry Way Transport for London RoyalStandard
EquipmentWorks
2
16
indicative for TfL car park site
8 7
Ferry Way Equipment Works Mandora
10 9 8 8
12
10
109
9
8
5
10
10
8
7
8/9 4/5
4/6
4/6 4
5
6
78
12
14
16
*
under construction
permitted
submitted for planning
initial design stage
AA
B
B
Feasibility Scheme
- Feasibility based on council’s masterplan
- Courtyard typology
Informal Pre-Application
- Hybrid typology responding to new Ferry Way application
- Introduction of commercial hub within Local Neighbourhood Centre
- New route through site introduced
First Formal Pre-Application
- Revised massing following planning officers’ comments
- Consideration of emerging Transport for London scheme design
Cycl
es
Cycl
es
Cycl
es
Cycl
es
Cycl
es
Bins
Bins
Bins
Bins
Ener
gy
PlantPlant Plant
Plant Plant
Plant
Retail
Retail
Plan
tPl
ant
Core
Core
Core
Core
Core
Core
Mandora
L&G
Standard
EquipmentWorks
TfL
Station
1An active central community heart
3Extending the
green layer
5Landscape
hierarchy
6Road types
7Pedestrian circulation
and entrances
4Place-making
and wayfinding
2Creating a journey...
and stops
Shared Surface
Public Square& Blackhorse Passage
Private Courtyard
Road - providing two way access and parking
Existing trees
Shared Surface
Walking
Cycling
Seating
Blackhorse Passage & Public Square
Lines
Activity
Industrial
Hard
Private Courtyard
Soft
Form
Vehicular
Road - Two way access
Road - One way access
Turning head and delivery/drop off zone
Road Types
Existing adopted highway
Potential to be offered for adoption
Unadopted / private road
Pedestrian priority area
Shared surface
Linear park
Forest Road
Blac
khor
se L
ane
Pedestrian & cycle circulation
Main access route to core
Private access to courtyard
Public space
Private space
Entrances
Circulation
Core & concierge
Stores, bins & services
Residential private entrance
Retail & commercial
04 urban strategy and opportunities
1
Linear Park
Gree
n Fe
rry O
pen
Spac
e
Publ
ic Sq
uare
Blac
khor
se
Pass
age
Priva
teCo
urty
ard
1 1
1
Nature / Forest
Industrial Heritage
to increase biodiversity &
microclimate and people’s relationship
to nature
to create a rich,
textured & diverse
community landscape
using of a variety of
trees grouped
informally
historic landscape pattern outside the Royal Standard
heritage of a range of factories on site - toy, transport, stationery
modern sign of the factories/workshops in Waltham Forest
a celebration of Arts & Crafts Tradition andWaltham Forest’s tradition of making & creating
floor pattern to inspire the landscape
pattern
using the shapes of the windows for play and planters
create a bus
seating area
Equipment Works
2 WorkshopsCafés RestaurantsOffice Space
front of bus signs to inspire signage / way finding as free standing elements, paving patterns or signage on buildings
Equipment Works
1-50 Wells Toy Core
play elements, seating inspired from the interior of the bus
explore & celebrate
the Routemaster
to ensure an unique, future proof approach to tree planting in an urban environment
to create a distinct place inspired by and celebrating the rich industrial heritage of the site
PUSH
ON C E
‘make’ a series of
stops
inspired bybeautiful
retroelements
‘Making’
05 creating a place
treelayer
create a landscape pattern
06 masterplan
Parking:
Disabled parking
Car club parking
Visitor parking
Adoptable / wheelchair
unitsground
floor
0m 5m 10m 20mN
Using paving lines to create legible routes
Planting beds breaking up the hard landscape
Subtle changes in material
Planting islandsPlayful paths with planting
Interesting seating Buffer planting to buildings
Bespoke bus seating play sketch Seasonal colour
Meanwhile Use
1
3
View from Blackhorse Road Station
Plaza
Aerial view of the workshop building
07 views
1
354
78
2
6
2 View down Blackhorse Passage
Workshop Building First Floor Layout1:250
Workshop Building Ground Floor Layout1:250
in collaboration with
Create an eye-
catching ‘base’ for the meanwhile use
which embraces the creative feel of the
local area
Ensure that the meanwhile use
is easy to find and captures peoples’
attention
Create space for makers to
showcase or sell their goods
A space which can be used by
the team for on-site meetings as well as
local community groups
08 views
4
5
78
Public Courtyard
Residential entrance
‘Working with makers’
Link between public and residential courtyards
Residential courtyard
Shared green corridor with Ferry Way scheme
1
354
78
2
6
6
residential / ancillary
residential entrances
retail / commercial
1Design precedents
- local historical and civic
architecture
2Design precedents
- London bus
3Architectural Precedents
Indicative elevational treatment
09 elevational concept
Key
1B1P Studio
1B2P
2B3P WC
2B4P
2B4P WC
3B5P
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_202
AVL CL
22/11/16
SECOND FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
PRIVATE BLOCKSECOND FLOOR FFL
+15.515
AFFORDABLE BLOCKSECOND FLOOR FFL
+15.675
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)Second-Third Floor Layout
1:500
10 residential layouts
AFFORDABLE BUILDINGF.F.L. @ + 9.300
Key
A3 Retail
1B1P Studio
1B2P
1B2P WC
2B3P
2B3P WC
2B4P
2B4P WC
Concierge
Ancillary
Plant
PRIVATE BUILDINGF.F.L. @ + 9.140
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_200
AVL CL
22/11/16
GROUND FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)Ground Floor Layout
1:500
Key
1B1P Studio
1B2P
2B3P WC
2B4P
2B4P WC
3B5P
3B5P WC
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_201
AVL CL
22/11/16
FIRST FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
PRIVATE BLOCKFIRST FLOOR FFL
+12.440
AFFORDABLE BLOCKFIRST FLOOR FFL
+12.600
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)First Floor Layout
1:500
Key
1B1P Studio
1B2P
2B3P WC
2B4P
2B4P WC
3B5P
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_206
AVL CL
22/11/16
SIXTH FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
AFFORDABLE BLOCKSIXTH FLOOR FFL
+27.975
PRIVATE BLOCKSIXTH FLOOR FFL
+27.815
BLOCK F(AFFORDABLE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK A(PRIVATE)
BLOCK D(PRIVATE)
BLOCK E(AFFORDABLE)
Typical Upper Floor Layout1:500
The scheme complies with all Priority One Criteria set out in the London Housing Design Guide:
1 Shaping Good Places
2 Housing for a Diverse City
3 From Street to Front Door
4 Dwelling Space Standards
5 Home as a Place of Retreat
6 Climate Change and Mitigation
AFFORDABLE BUILDINGF.F.L. @ + 9.300
Key
A3 Retail
1B1P Studio
1B2P
1B2P WC
2B3P
2B3P WC
2B4P
2B4P WC
Concierge
Ancillary
Plant
PRIVATE BUILDINGF.F.L. @ + 9.140
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_200
AVL CL
22/11/16
GROUND FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)
AFFORDABLE BUILDINGF.F.L. @ + 9.300
Key
A3 Retail
1B1P Studio
1B2P
1B2P WC
2B3P
2B3P WC
2B4P
2B4P WC
Concierge
Ancillary
Plant
PRIVATE BUILDINGF.F.L. @ + 9.140
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_200
AVL CL
22/11/16
GROUND FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)
AFFORDABLE BUILDINGF.F.L. @ + 9.300
Key
A3 Retail
1B1P Studio
1B2P
1B2P WC
2B3P
2B3P WC
2B4P
2B4P WC
Concierge
Ancillary
Plant
PRIVATE BUILDINGF.F.L. @ + 9.140
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_200
AVL CL
22/11/16
GROUND FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)
Key
1B1P Studio
1B2P
2B3P WC
2B4P
2B4P WC
3B5P
3B5P WC
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
F
1 : 500 @ A3
2014-162_201
AVL CL
04/11/16
FIRST FLOOR PLAN
BLACKHORSE LANEWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
0 50 m20105
N
PRIVATE BLOCKFIRST FLOOR FFL
+12.440
AFFORDABLE BLOCKFIRST FLOOR FFL
+12.600
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)
AFFORDABLE BUILDINGF.F.L. @ + 9.300
Key
A3 Retail
1B1P Studio
1B2P
1B2P WC
2B3P
2B3P WC
2B4P
2B4P WC
Concierge
Ancillary
Plant
PRIVATE BUILDINGF.F.L. @ + 9.140
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_200
AVL CL
22/11/16
GROUND FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)
AFFORDABLE BUILDINGF.F.L. @ + 9.300
Key
A3 Retail
1B1P Studio
1B2P
1B2P WC
2B3P
2B3P WC
2B4P
2B4P WC
Concierge
Ancillary
Plant
PRIVATE BUILDINGF.F.L. @ + 9.140
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_200
AVL CL
22/11/16
GROUND FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)
AFFORDABLE BUILDINGF.F.L. @ + 9.300
Key
A3 Retail
1B1P Studio
1B2P
1B2P WC
2B3P
2B3P WC
2B4P
2B4P WC
Concierge
Ancillary
Plant
PRIVATE BUILDINGF.F.L. @ + 9.140
FILE PATH
DRAWING NO REVISION
DRAWN REVIEWED
SCALE DATE
TITLE
PROJECT
T E
www.dla-architecture.co.uk
REVISIONS
Note: This is a colour drawing, in order to ensureany subsequent reproduction is viewed correctly itis to be re-printed in full colour
1 Naoroji Street | Clerkenwell | WC1X 0GB
: 0207 553 3030 : [email protected]
C:\RevitLocal ~\2014.162-A-DLA-XX-M3-MainBlock_alex.luria.rvt
G
1 : 500 @ A3
2014-162_200
AVL CL
22/11/16
GROUND FLOOR PLAN
EQUIPMENT WORKSWALTHAMSTOW, LONDON
FOR INFORMATION
A Layout Revisions 09/09/16AVL CL
B Layout Revisions 16/09/16AVL CL
C Layout Revisions 03/10/16AVL CL
D Layout Revisions 14/10/16AVL CL
E Layout Revisions 21/10/16MD CL
F Layout Revisions 03/11/16AVL CL
G Layout Revisions 22/11/16MD AVL
0 50 m20105
N
BLOCK F(AFFORDABLE)
BLOCK D(PRIVATE)
BLOCK C(PRIVATE)
BLOCK B(PRIVATE)
BLOCK E(AFFORDABLE)
BLOCK A(PRIVATE)
A3 Retail
Concierge
Ancillary
Plant
1B1P Studio
1B2P
1B2P WC
2B3P WC
2B4P
2B4P WC
3B5P
3B5P WC
Main Entrance
Secondary Entrance
Cycle Store Entrance
N