01AL13v-line generalinstallationguide
TM
Vol 1
TM
AL13architecturalsystem
www.al13.com
Version 1
pantented product
CLAD THE WORLD
TM
How to Installv-line
01
TM
AL13architecturalsystem
MEMBRANE
SHEATHING STRUCTURAL FRAMING
V-LINE PLANK
SYSTEM CLIP
or
NOTES
The first part of the installation guide
will outline a basic install on a flat wall
as illustrated above in its completed
form. The subsequent drawings
section will outline more intricate
details like inside corners, outside
corners, windows, doors, overhangs,
and build-outs. (Please ensure to have
read the General Install section first.)
Installation Guidelines 1
IMPORTANT: Failure to follow the guidelines herein will void the AL13 warranty.
Key steps for a successful installation
Key steps for a successful installation
01
Please read and understand the entirety of this guide. Any questions or inconsistencies should be directed to [email protected]
Guidelines may vary depending on project particulars and conditions. Contact AL13™ with
questions regarding variance from this guide. Standard carpentry skills are required for optimum results.
Good health and safety practices must be followed when installing AL13™ ACM System.
01 Understand the various elements of the system.
02 Plan the installation, work schedule, layout, and material usage.
03 Ensure everyone working has read the installation guidelines.
04 Execute work in the sequence set forth in the installation guidelines.
05 Protection should be worn at all times; gloves, ear protection, safety glasses and hard hat.
06 Protect the product by storing the material in a dry and clean environment.
07 Ensure proper fit of the system.
08 Upon completion of installation, clean any debris on wall.
When materials arrive on site, ensure that all panels, extrusions, and other components are in good condition . All material
should be free of any defects.
> Shipping or packaging issues should be noted on the waybill and then reported to the distributor.
> Should any products be damaged, the receiving party is responsible for filing a freight claim to the shipping company
within 24 hours of receiving product.
> Defective materials should be reported to the distributor from which the product was dispatched from.
InstallationGuidelines 2
02
TM
AL13architecturalsystem
system parts
014
1. end frame
2. inside corner
3. outside corner
7. perimeter reveal cap assembly
5. perimeter �at cap assembly
6. reveal cap assembly
4. �at cap assembly
8. system clip
12. 10”80T non ferrous saw blade
13. 1/4” 60T non ferrous saw blade
14. gloves
15. metal/wood fastener
16. metal fastener
17. concrete fastener
9. v-line 4” plank
10. v-line 6” plank
11. 4” perforated vent Strip
system parts
014
1. end frame
2. inside corner
3. outside corner
7. perimeter reveal cap assembly
5. perimeter �at cap assembly
6. reveal cap assembly
4. �at cap assembly
8. system clip
12. 10”80T non ferrous saw blade
13. 1/4” 60T non ferrous saw blade
14. gloves
15. metal/wood fastener
16. metal fastener
17. concrete fastener
9. v-line 4” plank
10. v-line 6” plank
11. 4” perforated vent Strip
Product Legend: This installation guide will discuss various components of the system and use component reference blocks.
Please refer to the following to verify the correct component.
Installation Guidelines 3
Inventory
Tools
01
Once material is verified to be in good condition, take inventory of units according to the packing slip. Make sure all
materials - panel, extrusions, panel spacers, fasteners, and adhesive tape - and quantities are present.
- The distributor should be notified immediately if the order has any missing or incomplete components. Failure to do
so may void re-fulfillment.
AL13™ is made to be installed with general tools. A recommended tool list is as follows:
> Sawhorses/work table
> Circular saw, handheld with guide
> Table saw
> Cordless electric impact with
appropriate bits
> Non-ferrous saw blades intended
for cutting Aluminum
> Mitre saw
> Jigsaw
> Level/plumb line
> Chalk line
> Cordless electric drill
> Drill bit set
> AL13 SLED
v-lineInstall 1
Fasten vertical perimeter extrusions
fastener24” max spacing
The vertical perimeter extrusions are normally the first extrusions to be fixed to
the wall. The building wrap/envelope must be complete to spec before anything
goes on the wall. Layout end frame extrusions according to the desired location.
Ensure frames are level and plumb before fastening. Consult the fastener speci-
fications guide in this binder to determine fastener type and spacing.
Work flow is always from the bottom up. Place the first fastener near the bottom
of the vertical extrusion. Once the piece has been leveled, add a second near
the top fixing it in place. Add subsequent fasteners according to the fastener
guide spacing. An outside corner frame, inside corner frame, or a perimeter
frame assembly may be used in place of the end frame for vertical applications.
The end frame is shown here only to keep the scope of this guide relatively
simple.
01
v-lineInstall 2
Fasten horizontal baseline extrusions
fastenermin 2 per back plate
16” on centre
This will establish the horizontal datum - and will be a reference to subsequent
extrusions - so it is important that it is mounted level. Consult the fastener speci-
fication guidelines to establish fastener type and spacing.
The method of install will vary from the vertical components as the horizontal
baseline back plates will need to be segmented to keep a functioning rain
screen through the system. To function as a rain screen you need to follow the
20/80 rule. At any cross section only 20% of the horizontal plane may have and
extrusion attached, and 80% of the horizontal cross section need to be open. To
make it easy pre-cut, and pre-drill all back plate components at 3.2” (81mm) and
install them at every 16” on center.
01
v-lineInstall 3
Fasten horizontal upper extrusions
fastener24” max spacing
The final perimeter extrusion to be attached is the upper horizontal back plate.
This is the ONLY extrusion that may be used to terminate the system when
running v-line in a horizontal application. The snap lock assembly is crucial to
function, fit and finish.
Unlike the baseline row of segmented back plates, the upper row may be
installed as a solid piece. Leave each end with approx. 3” gap from verticals to
allow for proper top cap installation.
01
v-lineInstall 4
Engage baseline flat cap
or
The flat cap needs to be cut to size and engaged using an AL13 SLED before
the first row of v-line plank may be installed. A properly fit cap should tuck under
both verticals leaving approx. a 1/8” gap on either side to allow for contraction
and expansion. If a butt joint is required due to the length of the flat cap exceed-
ing 12’, the butt joint MUST occur on a shared back plate segment.
It is only necessary to engage flat cap where the back plate is present. Impact-
ing the flat cap in the voids, between back plates, may cause deformation of the
top cap.
01
v-lineInstall 5(a)
Installing v-line plank
The v-line board is to be cut to fit between the vertical frame components. A
properly cut to fit plank should have a 1/8” gap from each vertical either side
should be allowing for contraction and expansion.
It is essential the first row of v-line be tucked behind the vertical tab of the frame
components so that the fastening tongue is pointed upwards and the groove is
pointing downwards. The t-tab on the back of the v-line plank should firmly rest
on the feet of the segmented back plate extrusions.
01
v-lineInstall 5(b)
Installing v-line plank
Once the v-line plank has been fitted and leveled to an even plane, it will be secured by
attaching a AL13 system clip to the upwards pointing tongue. The narrow face of the clip should
be pointing away from the wall. Make sure the clip is fully inserted before adding fastener to the
through-hole. The function of the clip is to secure the plank in place while spacing it from the wall.
The fastener will not penetrate the v-line plank itself. This will allow each v-line plank contract and
expand through the full temperature spectrum. A clip and fastener are to be attached to each
v-line plank once every 32” MAX. A minimum of one system clip is required per v-line plank.
The maximum consecutive run of V-line plank will be 24’ without a vertical brake. (End frame,
flat cap, or reveal cap assembly) If the required v-line length exceeds 12’, butt jointing two planks
together will be required. A single system clip is to be used at the seam of the butt joint to ensure
a precision fit. As we still need to account for contraction and expansion yet require a tight butt
seam. The v line planks must have MAX ¼” gap at each side of the vertical break.
01
v-lineInstall 6(a)
Installing the final row of v-line plank
The final or top row to be installed will require the v-line plank to be ripped to
width by a table saw to its appropriate dimension. Due to this, the top rows
installation will vary from the regular installation.
The top row does not require the system clip to be held in place with a fastener.
The top row of V-line plank will be held in place by securely engaging the perim-
eter flat cap or reveal cap. A system clip is still used, but it is clipped on to the
perimeter back plate assembly. It functions as a spacer only.
01
v-lineInstall 6(b)
Installing the final row of v-line plank
intersection
To secure the final row, a perimeter cap must be cut to length to fit behind the
vertical frame extrusions. A proper fit should allow for a 1/8” gap on either side to
allow for contraction and expansion. The perimeter cap should be hammered in
place using an AL13 SLED with a rubber mallet.
01
CLAD THE WORLD
TM
Vancouver Office Los Angeles Office
Toronto Office Chicago Office
Calgary Office Houston Office
Montreal Office New York Office
778 724 0813
323 486 0111
www.al13.com
647 478 7726
312 424 9905
403 910 2433
713 714 4441
514 316 7160
646 741 7222
01 05
03 07
02 06
04 08
patent product