00-V005 Document Control Procedure Rev 180311

download 00-V005 Document Control Procedure Rev 180311

of 21

Transcript of 00-V005 Document Control Procedure Rev 180311

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    1/21

    TM

    R

    CROWNBrand-Build ing Packagin

    DOCUMENTATION CONTROL

    Class Description : 00 - POLICY / SYSTEM Doc No. : 00 - V005

    Document Description : DOCUMENT CONTROL PROCEDURE Revision : 18/03/11

    Page : 1 of 18

    Requesters Name : Nguyen Thi Nhan SIGNATURE:

    Requesters Plant : CROWN Beverage Cans Saigon Limited.

    REVISION HISTORY

    Revision Requester Description Of Change

    14/10/2002 Le Thanh Lam Revise Document

    06/11/2002 Lu Thuy Van Revise Document

    17/09/2003 Lu Thuy Van Revise Document

    01/10/2004 Nguyen Thanh Phong Revise Document

    01/05/2005 Nguyen Thanh Phong Revise Document

    15/02/2006 Nguyen Thanh Phong Add new logo

    06/08/2007 Nguyen Thanh Hai Change Format

    10/12/2007 Nguyen Thi Nhan Refer Below

    30/07/08 Nguyen Thi Nhan Revise

    18/03/11 Nguyen Thi Nhan See below

    DOCUMENTATION CHANGE APPROVAL

    Initiate Change Obsolete

    Reasons :

    1. Revise in section 1.0, 3.5, 3.6, 3.7.

    Approval Name Signature Date

    Quality Manager Nguyen Thanh Hai

    Plant Director Nguyen Ngoc Minh

    General Director Nguyen Minh Trung

    All information herein is company proprietary and property of CROWN Beverage Cans Saigon

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    2/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title:Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 20/090/7

    Page 2 of 16

    Limited. It shall not be reproduced or copied unless as expressively permitted or directed by CROWN

    Asia Pacific Holdings Limited.

    I:\DOCC\CLASSOO\00-V005Rev200907.doc 2

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    3/21

    1 TMR

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 20/090/7

    Page 1 of 18

    *

    1.0 PurposeThis document describes the documentation system of CROWN Beverage Cans Saigon Limited to

    compliance to the requirements of ISO 9001:2008, ISO 14001:2005 and OHSAS 18001:2007and the

    documentation requirements of the CROWN Asia Pacific Holdings Limited. It also describes the

    procedure of writing, reviewing, approving, issuing and controlling the documents.

    2.0 Scope

    Apply to CROWN Beverage Cans Saigon Limited.

    3.0 Reference

    3.1 Quality Manual (Doc. # 00-V001)3.2 Regional Documentation System (Doc. #00-A005)

    3.3 ESM-Change Request Procedure (Doc. # 05-GEN-V005)

    3.4 Disciplinary Policy (Doc. # 00-V029)

    3.5 ISO 9001: 2008 Requirement Clause 4.2, 4.2.2

    3.6 ISO 14001: 2005 Clause 4.4.4

    3.7 OHSAS 18001: 2007 Clause 4.4.4

    4.0 Definition

    4.1 Document: Hard / Soft copy of the controlled procedures applies to Quality

    Management system.

    4.2 Data: Data which recorded in the quality forms / SPC programme.

    4.3 Controlled Documents: Specific document which relates to the detail of quality and

    manufacturing requirement.

    4.4 DOCC: Document Control which locates in the QA Dept. ISO/OHSAS

    Coordinator shall co-ordinate the document control system.

    4.5 DOCS: Document Control Station is where controlled documents are needed

    for reference for on-job training and implementation at Operationallevel and Admin office, refer map location at appendix 7.

    4.6 AP DOCC: CROWN Asia Pacific Holdings Limited.

    4.7 CBCS: CROWN Beverage Cans Saigon Limited.

    4.8 HOD: Head of Department

    4.9 Admin: Administration

    4.10 DWI: Drawnwall Iron

    4.11 SOP: Standard Operating Procedure

    I:\DOCC\CLASS00\00-V005 Rev.20.09.07.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    4/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 2of 18

    5.0 Responsibilities

    5.1 Quality Manager

    5.1.1 To manage and be in-charge of ISO 9001:2008 QMS and Corporate Standard

    Reference Material.

    5.1.2 To review and approve controlled documents and Quality Forms from HOD submission.

    5.1.3 To prevent unauthorised and outdate documents from being used in the plant.

    5.1.4 To ensure the document availability.

    5.1.5 To seek approval from Regional Quality for Plant Documentation System

    5.1.6 To allocate location code for each DOCS within the company

    5.1.7 To create Plant Map to identify the DOCS location

    5.2 EHS Officer

    5.2.1 To maintain and be in-charge of ISO 14001:2005, OHSAS 18001:2007 & Corporate

    EHS Standard Reference Material.

    5.2.2 To audit and maintain effectiveness of the document control system in the plant.

    5.2.3 To ensure the procedures are effectively been introduced, implemented and understood

    at each level.

    5.3 ISO/OHSAS Co-ordinator

    5.3.1 Report to Quality Manager

    5.3.2 To edit, update, distribute and control the release of controlled Documents and Quality

    forms

    5.3.3 To maintain External/Internal Master Document Control List.

    5.3.4 To track and issue Form # and Doc # upon request by each HOD.

    5.4 Head of Department (Operation level)

    5.4.1 To manage and be in-charge of their respective DOCS.

    5.4.2 To maintain the controlled documents in DOCS.

    5.4.3 To ensure that required controlled documents are available in the DOCS.

    5.4.4 To prevent uncontrolled documents from being used to manufacture/inspect/test product

    or for purchasing of material.

    5.4.5 To remove and return all obsolete document in the DOCS to DOCC.

    5.4.6 To brief new policy/system/procedure to their subordinates.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    5/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 3of 18

    5.5 Admin Office (2nd level)

    5.5.1 HR Manager to manage, maintain & in-charge of assigned DOCS#01

    5.5.2 To ensure only active controlled documents are available for reference.

    5.5.3 To remove & return all obsolete document to DOCC

    5.5.4 To sign-in/signout of controlled document to be taken out from DOCS#01 for

    reference and on-job training purposes.

    5.6 Requester/Process Owner

    5.6.1 Will initiate, write or change the controlled document to comply with ISO and CROWNQMS.

    5.6.2 Submit to its own HOD for review and approval on the document / form before releasing

    to DOCC to update

    5.6.3 Must request new document and form number from DOCC

    5.6.4 Ensure each departments form is linked and traceable to document.

    5.7 DOCC

    5.7.1 To ensure all controlled document are kept up to date within the whole organization.

    5.7.2 Internal Document Control listing and External Document Control Listing (Doc. # 00-

    A005, Appendix 1) shall be used to control the issuance, revision and receivers of

    documents.

    5.7.3 Issue Document Control number for all newly initiated document.

    5.7.4 Keep track of the Documentation Control Number Tracking

    5.7.5 File the obsolete document.

    5.7.6 All soft copies must be controlled by DOCC. It should be stored and maintained in the

    company server as security reason.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    6/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 4of 18

    6.0 Procedure

    6.1 Introduction

    All controlled documents are proprietary and the property of CROWN Beverage Cans Saigon

    Ltd. It shall not be reproduced in any form or removed from the company premises without the

    approval of the Quality Manager.

    6.2 Any Sister Plant or Customers approach CBCS for documents (hard copy/soft copy) for their

    reference to bring out of the plant. CBCS should seek AP DOCC for permission and approval.

    6.3 Plant Documentation Structure

    6.3.1 The structure of document control in CBCS starting the DOCC as the main control

    centre and other DOCS

    DOC CENTRE

    (QA)

    DOCS #

    1

    DOCS #

    2

    DOCS #

    3

    DOCS

    # 5

    DOCS

    # 7

    DOCS

    # 11

    DOCS

    # 13

    DOCS

    # 17

    DOCS

    # 19

    The detail of DOCS as following below table:

    No. DOC Number Department / Section

    1 DOCC Quality

    2 DOCS # 1 Administrative Office (2nd Level)

    3 DOCS # 2 Engineering

    4 DOCS # 3 Front-end

    5 DOCS # 5 Middle-end

    7 DOCS # 7 Back-end

    8 DOCS # 11 Manufacturing (DWI) L1

    9 DOCS # 13 Security

    10 DOCS # 17 EOE

    11 DOCS # 19 Manufacturing (DWI) L2

    Location of DOCC and DOCS show in the appendix 7

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    7/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 5of 18

    6.3.2 The documentation control is grouped into 11 classifications. The description of each

    documentation control class is in the Appendix 1.

    6.3.3 Document structure in CBCS is as follows:

    6.4 Documentation Control Numbering Format

    6.4.1 Each controlled document should be assigned a number, and the number shall be

    traceable to the format given by the AP DOCC, refer to DOC# 00-A005.

    6.4.1 For new document, the number will be assigned to the process owner by the DOCC.

    6.4.2 Numbering format for all classes are also given in the following table:

    Class Numbering format

    00, 06 and 09 XX-YZZZ

    02 N/A (ESM Intranet)

    03 XX-SSS-YZZZ

    01, 04 and 05 XX-KKK-YZZZ

    07 XX-KKK-RRRR-ZZZZ

    08 N/A (APCPS Portfolios)

    10 Y-JZZZ

    Where

    - XX is class number.

    - Y is plant location identification, V

    - ZZZ is running number from 001 to 999

    - SSS is material grouping.

    - KKK is product type.

    - RRRR is specific container characteristic such as diameter, volume, etc.

    - J is Department Process Ownership

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

    Level 1: Policy and System Document

    Level 2: Procedure Document which includes

    all Class 01, 02, 03, 04, 05, 06,07

    Level 3: (Class 10)

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    8/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 6of 18

    The code description detail is indicated in Appendix 4.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    9/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 7of 18

    6.4.3 The running number for Class 06 and 10 are provided to each department following the

    table:

    Department Class 06 (ZZZ) Class 10 (ZZZ)

    General Administration From 800 to 999

    Quality Assurance

    From Q001 to Q099 For QMS

    From Q100 to Q199 For DWI

    From Q200 to Q299 For EOE

    Supply & Logistics From 001 to 199 From L001 to L199 for Logistic

    From L200 to L399 for Purchasing

    Human Resource From 200 to 299 From H001 to H999

    Sales & Marketing From 400 to 599 From S001 to S999

    Finance From 600 to 799 From F001 to F999

    ManufacturingFrom P000 to P499 for DWI

    From P500 to P999 for EOE

    Engineering From E001 to E999

    EHS From T001 To T 999

    6.5Document Controlled Format

    6.5.1 Each controlled document has page 1 as the Document Cover Page (see appendix 5 as

    sample).

    6.5.2 Subsequent pages will be identified with the box on the top of the page that will contain

    the logo, title, document number, revision and page. (See above box as an example.)

    6.5.3 Revision date of each controlled document is determined by the actual date of document

    changed. The format is day/month/year.

    6.5.4 When a document is revised, all prior revisions must be removed from the DOCC andDOCS. Copies in the Electronic documentation system will be stored under Obsolete.

    6.5.5 Each hardcopy of the controlled document is identified by red stamp on the bottom right

    hand side of the page 1. Sample of the stamp:

    (Note: stamp at the bottom right hand side of each cover page)

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

    Controlled DocumentValid only if this stamp is red

    Location : _____________________________________

    Release Date : __________________________________

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    10/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 8of 18

    6.5.6 The Release Date is the same as the Effective Date in which the process are implemented

    according to documented procedures

    6.5.7 Controlled document shall be filed in the identified controlled document location with a

    proper filing system.

    6.5.8 Each hardcopy of the controlled document for Class 03, 07 and 08 shall be printed in the

    paper marked CONFIDENTIAL.

    (Confidential document should not be duplicated/photocopied without prior approval by

    the respective Plant manager and Quality Manager)

    6.6Uncontrolled Document6.6.1 Unstamped copy or one in which the stamp is not red is uncontrolled document.

    6.6.2 Uncontrolled copy will not be kept up to date and is issued for information purposes

    only. The user is responsible to ensure fitness for use.

    6.6.3 Uncontrolled copy must not be used in purchasing design, manufacture, inspection or

    testing product.

    6.7Correction in Measurement Data / Sentences

    6.7.1 Changes/Modifications of any sentences in controlled document by means of

    Correction Fluid/Correction Pen/Liquid Paper or by handwriting is not allowed exceptfor spelling errors.

    6.7.2 Changes/Modifications of any sentences/measurement data in the Quality Records by

    means of Correction Fluid/Correction Pen/Liquid Paperis not allowed.

    6.8Control and Issuing of ESM Drawing Specification (Class 02)

    6.8.1 Corporate Technology Centre, Wantage, will maintain and control the manufacturing

    drawing specifications of all product range specified under Class 02 from CROWN

    corporate.

    6.8.2 The Class 02 will not be applicable at the CBCS from 1st September 2004.

    6.8.3 DOCC shall maintain an update printed copy of CBCSs ESM drawing specification for

    reference as well as a backup copy from engineer Manager, ESM Authoriser.

    6.8.4 Pant manager and Engineering Manager should determine on issuing the ESM drawing

    specifications to DOCS and kept DOCC informed, refer to 05-GEN-V005.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    11/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 9of 18

    6.9Control and Issuing or distributing of Plant Controlled Document

    6.9.1 Controlled document is issued only when it has full signature for approval.

    6.9.2 The ISO/ OHSAS Co-ordinator shall be responsible to inform respective HOD / Admin

    Office about the changed documents by issuing the Document Control Request Form

    (00-A005, appendix 2).

    6.9.3 Upon receipt of new document, respective HOD/Admin office has to sign and

    acknowledge the Form and submit the obsolete documents if any.

    6.10 Control and Issuing or distributing of AP Controlled Document

    6.10.1 When DOCC receives AP Controlled Document by hardcopy (Document Class 03, 07and 08 Using Confidential paper), QA Manager must sign on Documentation Control

    Request form and send back to AP Manufacturing office by fax.

    6.10.2 DOCC shall release the AP Controlled Document to respective managers for review and

    approval before releasing to DOCS.

    6.10.3 Corporate Process Control Manual, Corporate Gauge Manual and Corporate Training

    Manuals, will be controlled by Quality Manager.

    6.10.4 DOCC shall control the AP Controlled Document the same way as Plant Controlled

    Document in the item 6.8.1 to 6.8.4.

    6.11 Obsolete Document.

    6.11.1 All obsolete copies of the controlled document must be returned to DOCC. DOCC keeps

    one copy with stamp OBSOLETE on all pages for identification in the Obsolete

    Document file and destroy the rest. Software copy will remain in the electronic

    documentation system but will not be able to retrieve by all personnel except the

    ISO/OHSAS Co-ordinator and Quality Manager.

    6.11.2 DOCC should record and maintain the last 2-reversion date of obsolete documents,

    before sorting as archive document, refer to appendix 12, Obsolete Controlled Document

    List (00-A005).

    6.11.3 DOCC shall prevent OBSOLETE controlled document from being copied orelectronically re-produced within the company.

    6.12 Customer Supplied Specification/Drawing

    6.12.1 Where customer supply any copies of drawings and specification, they shall be checked

    and verified by the Quality department or Technical department. Such verification may

    include:

    - Part number

    - Model

    - Dimension

    - Materials

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    12/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 10of 18

    - Tolerances

    - Unknown details

    6.12.2 All correct supplied drawings and specification will be indexed before passing on for

    reproduction for in-house manufacturing drawing.

    6.13 National and International Standards

    6.13.1 All master copies of these documents shall be retained by the DOCC.

    6.13.2 Copies of extracts from such documents shall be issued for reference purpose.

    6.13.3 Every year, the DOCC shall review the list of such documents to evaluate whether they

    are still valid. Arrangement shall be make to replace any obsolete documents.

    6.14 Translation of the Controlled Document

    Controlled Document may be translated to Vietnamese language and should be attached

    together with original Document or preferably both languages (English and Vietnamese) be

    found in the same Document.

    6.15 Initiate New, Change Controlled Document

    6.15.1 All process owners / requesters are to be trained by the Quality Manager, they must

    strictly adhere to the ISO document format guideline released by AP DOCC.

    6.15.2 A clear flow chart and process steps with reference to 2 templates shown in appendix

    14 & 15 (Doc. # 00-A005) must be documented. Train the respective personnel is

    compulsory.

    6.15.3 The document section and paragraph shall write as follows. Any other format will

    request the approval from the DOCC.

    1.0 Level 1

    1.1 Level 2

    1.1.1 Level 3

    6.15.4 Indicate * on the top right hand corner of the page, this applies only to the changes

    made on the specific page.6.15.5 Indicate I:\DOCC\CLASS XX\File Name RevDDMMYY.doc / .xls at page footer

    starting from page 2 for documentation and traceability purposes.

    6.15.6 Upon completion, the filename should be saved according to 6.15.5 in the company

    network server.

    6.15.7 Highlight Bold and Italic on statements/words/new pragraph on existing controlled

    Document when comes to revising new revision.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    13/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 11of 18

    7.0 Attachment

    7.1 Appendix 1 - Documentation Control Classification

    7.2 Appendix 2-Distribution List for Hardcopy Document

    7.3 Appendix 3 - Approval of Documents

    7.4 Appendix 4 - Document Control Number Code

    7.5 Appendix 5 - Documentation Cover Page

    7.6 Appendix 6 - How to Initiate, Change and obsolete Document flow

    7.7 Appendix 7-Document Station Layout

    8.0 Environment, Health and Safety

    8.1 Company ISO/OHSAS procedures and forms should be stored in the network server for

    8.1.1 Daily Backup

    8.1.2 Preventing from leaking out to external/3rd party by any other personnel

    8.1.3 Direct control and access by Quality Manager, ISO/OHSAS Coordinator, IT Officer

    8.2 Regular update on the whole system by writing into the CD-RW as a backup copy for Plant

    DOCC incase of network breakdown as well as submitting a copy to AP DOCC.8.3 Companys ISO controlled document and CROWN reference material should not be taken out

    of the premise without the permission and official signature approval by

    i)Plant Directorfor Manager Level

    ii) Quality Manager for all Administrators, Executives, Technicians, Engineers level

    8.4 Upon detection by Security Guard without the approval signature, the controlled/uncontrolled

    documents will be confiscated and report to Disciplinary Committee, refer 00-V029.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    14/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 12of 18

    7.1 Appendix 1 - Documentation Control Classification

    Class Class Description Description

    00 Policy / System This class of document consists of Policies/Systems that embraces general

    goals, value and acceptable methodologies applicable to all Asia-Pacific

    region or individual plant.

    01 Quality Detail Quality Requirements, methodologies, criteria and monitoring.

    02 Container ManufacturingStandard

    This is not applicable at plant level, refer to ESM intranet (http: //6.29.10.19)

    03 Procurement General purchase requirements for Direct and Indirect material supplies

    incorporate: material specification and part #, approved supplies list for

    materials and services, and procurement related procedures.

    04 Standard Operation

    Procedure

    Equipment Operating Procedures, step by step instruction for process and

    process flow. Detailed requirement, limit or pass/fail conditions for

    performing manufacturing steps.

    05 Calibration and Preventive

    Maintenance

    Procedures for calibrating production, test and inspection equipment. Also

    procedure to conduct preventive maintenance.

    06 Non Production Procedures that are used in service and support for production.

    07 Customer Specification Document that translates the customers requirements.

    08 Product Specification Specification to produce a specific container for a specific customer which

    includes reference to process flow, material used, container manufacturing

    standard, customer specification, special instructions and other required

    information.

    This is not applicable at plant level, refer to AP CPS Portfolio

    09 Environment / Health /

    Safety

    Any procedure/work instructions to be implemented in the plant to satisfy

    environment, health & safety requirements. This includes ISO 14000/OHSA

    18000

    10 Quality Records Forms/Checklist, which are used for transaction data, issuance recording and

    documenting

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    15/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 13of 18

    7.2 Appendix 2 - Distribution List for Hardcopy document

    Document Control Centre

    (DOCC)

    00 01 03 04 05 06 07 09 10

    Quality

    Document Control

    Station (DOCS)

    00 01 03 04 05 06 09 10

    Administrative Office

    (DOCS #1)- 2nd Level

    Engineering (DOCS #2)

    Front-end (DOCS #3)

    Middle-end (DOCS # 5)

    Back-end (DOCS # 7)

    Manufacturing (DWI) L1

    (DOCS # 11)

    Security (DOCS # 13)

    EOE (DOCS # 17)

    Manufacturing (DWI) L2

    (DOCS # 19)

    : Regional or code A documents

    : Local or code V documents.

    : Document (any of A or Q documents) upon request

    Note :

    Although indicated that departments may receive copy of documents in the above matrix, they only

    receive the documents that relate to their department function.e.g. : DWI will only receive their copy of class 01 or class 04 documents.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    16/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 14of 18

    7.3 Appendix 3 - Approval of Documents

    Document Control Station

    (DOCS)

    00 01 02 03 04 05 06 07 08 09

    General Director

    Plant Director

    Quality Manager

    Respective Manager/HOD

    : Documents that are issue by the Regional Office or Code A Documents.

    : Documents that are issue by the local office or Code Q Documents.

    Note : General Director only approve Quality Manual and document which is written by managers who

    direct report to General Director. If document is not under Quality Assurance, Quality Manager will

    approve the format of the document only.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    17/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 15of 18

    7.4 Appendix 4 - Document Control Number Code

    1 Description of code Y (Plant location Identification) is:

    A - CROWN Asia Pacific Holdings Limited

    V - CROWN Beverage Cans Saigon Limited.

    2 Description of code SSS (material grouping)

    ALU - Aluminium

    CLA - Lacquer

    CSZ - Sizing

    CVA - Varnish

    CWC - White Coat

    COM - CompoundINK - Ink

    PKG - Packaging

    MFS - Manufacturing Spares

    CON - Consumable

    GEN - General Procedure

    3 Description of code KKK (Product type)

    DWI - 2 PC Drawn Wall Iron

    EOE - Easy-Open-Ends

    GEN - General Procedure

    4 Description of code RRRR (Container Characteristic)

    Volume (DWI) - 250ml, 330ml, 375ml, etc.

    Diameter (EOE) - 206

    5 Description of code PP (Specific Process/Operation)

    For DWI For EOE

    SO - Source Sheet PL - Plate / Lacquer Layout

    CS - Coil Stamping SH - Shell Stamping

    BD - Blank and Draw SR - Score and Rivet Operation

    RD - Redraw TB - Tab Operation

    DI - Drawn / Wall Iron Operation CP - Compound PlacementDO - Base Doming

    TR - Trimming

    PV - External Print

    NF - Neck and Flange

    FL - Flanging

    LS - Lacquer Spray

    BP - Base Panel

    6. Description of code J (Department Process Owner)

    E Engineering/Technical L-Logistic Purchasing S-Sales

    F Finance P- Production T- EHSH HR Q- Quality

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    18/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 16of 18

    7.5 Appendix 5 - Documentation Cover Page

    TM

    R

    CROWNBran d-Build ing Packagin

    DOCUMENTATION CONTROL

    Class Description : Doc No. :

    Document Description : Revision :

    Page :

    Requesters Name : SIGNATURE :Requesters Plant :

    REVISION HISTORY

    Revision Requester Description Of Change

    DOCUMENTATION CHANGE APPROVAL

    Initiate Change Obsolete

    Reasons :

    Approval Name Signature Date Stamp

    All information herein is company proprietary and property of CROWN Beverage Cans Saigon Limited. It

    shall not be reproduced or copied unless as expressively permitted or directed by CROWN Asia Pacific

    Holdings, Limited.

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    19/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 17of 18

    7.6 Appendix 6 - How to Initiate, Change and obsolete Document flow

    Requester

    Initiate Change Obsolete

    - Get Documentation #

    - Write Document

    -Fill up New Documentation

    cover page

    - Get Documentation text file

    (for non-class 02)

    - Revise and identify changes

    (use *)

    - Fill up New Documentation

    cover page

    - Get the hardcopy of filled up

    New Documentation Cover

    page

    Requester

    Obtain necessary approval

    Requester

    - Send to DOCC the approved new / revised document.

    - Include the diskette of the updated files.

    Requester

    - Review the approval required.

    - Review the Document Control requirement.

    Requester

    Initiate Obsolete

    - Issue the new controlled

    Document to the DOCS

    (specify in the scope of doc)

    - Update the document list

    - File Controlled Document

    - Issue the revised controlled

    documentation to the DOCS

    according to the distribution list.

    - Update the Documentation

    - File the Controlled Document

    -Remove the Controlled

    Document from the DOCC

    - Inform the DOCS to remove

    the Controlled Document

    - Update the Documentation

    Controlled List.

    Change

    Requester

    Make changes, or

    may abandon the doc.

    not approved

    not approved

    not

    OK

    Review OK

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    20/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 18of 18

    7.7 Appendix 7 Document Station Layout

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311.doc

    EOE Office

    ST.#17

    Engineering Office

    ST.#2

    Back End AreaST.#7

    Production Office L1

    ST .#11

    Middle End

    Area ST.#5

    00,03,06Office

    lockST.#1

    Front end Area ST.#3

    Production Office L2DWI Line ST.#19

  • 7/30/2019 00-V005 Document Control Procedure Rev 180311

    21/21

    TM

    R

    CROWNBrand-Build ing Packagin

    Title: Doc no. 00 - V005

    DOCUMENT CONTROL

    PROCEDURE

    Revision 18/03/11

    Page 19of 18

    I:\DOCC\CLASS00\00-V005 Document Control Procedure Rev 180311 doc