Village Disaster Management Plan
VILLAGE: DALOK
DISTRICT DISASTER MANAGEMENT AUTHORITY, GOALPARA
C O N T E N T
Chapter -I
Introduction
Purpose & Objective of the Plan
Village Profile
Chapter-II
Sources of threats to the village community
Chapter-III
Planning to cope with the specific issues of the village
Mitigation measures and linkage with Governmental scheme
Formation of various teams and their roles & responsibilities
Preparedness
Capacity Building Measures
Family Disaster Preparedness Kit
Mitigation Plan
Community Disaster Contingency Fund
Community Grain Bank
Updating the VDMP
Important contact numbers
List of departments to support in implementing the plan
Map of the village
List of Families of the village
Photo Gallery
Certificate of Approval from Villagers’
2
CHAPTER-I
Introduction
In the present day every individual is vulnerable and is threatened by the natural disasters,
which is growing in number and variety. In other words, every individual is required to be
aware and also have minimum capacity to counter such crisis. This implies that entire
population of a village forms a community and has to be involved in its safeguard in the
event of a crisis which has potential to affect all or majority of them. This plan is prepared
with the participation of local villagers including the village's heads.
Purpose of the Plan The first response to the natural hazards comes from immediate neighbourhood and spreads
into the community, while the government and other organization take some time to reach
them. The plan takes into account the status of the hazard history, vulnerability, infrastructure
availability, institutional capacities, Human Resources and other related information
pertaining to Disaster Response and Mitigation. In accordance, it provides the procedures that
may be implemented with immediate effect and subsequently upgrade as more resources
become available and capacities of the stakeholders gets built up. The immediate purpose is
therefore to bring about the greater role clarity and coordination so that it gives the outline for
mitigating future disasters. The plan would cover the operational context, preparedness,
response and mitigation procedures.
Objectives:
1. To reduce the loss of human lives, animal lives and properties during any disaster2. To ensure the availability of food, drinking water and sanitation during any disaster.3. To enhance the capacity of the villager to face any kind of disaster.4. To link up the various development schemes with disaster management in the village.5. To have a role clarity during different disaster and during response, relief & recovery.6. To protect and conserve the wetlands, available open spaces, soil health, VGR/PGR
etc.
3
VILLAGE PROFILE:
Name of the village: Dalok
Hamlets: Dalok, Haldibari, Bokdo.
Name of the Development Block: Balijana Development Block
Name of Revenue Circle: Balijana Revenue Circle
Police Station: Agia
Post Office: Agia Sub-Post Office
Total Land of the Village:
Land Type AreaMiyadi 382 BighaEksonia 984 Katha 18 LessaKhas 559 Bigha, 4 Katha, 17 Lessa
HISTORY OF THE VILLAGE:
The Dalok village is located under Agia Gaon Panchayat of Balijana revenue circle under Balijana Dev. Block. It is about 13 K.M away from District Headquarter. The village is constituted by three habitations called Dalok, Haldibari and Bokdo. Composition of the village consists of Hindu (Rajbongshi) and Christian (Garo) tribes. According to the community there is no written history of the village. But there is a story which is prevalent and being shared by the villagers that earlier people used to live in scattered form on the foothills of Ajagar Pahar located in the southern part of the village. Once Mughal Army General Mirjumllah crossed the river Brahmaputra and attacked on the southern part , which resulted into the people to unite against the Mughal army (Scattered : One of the Assamese meaning of scattered is Dale Dale ) in order to prevent the entry of Mughal Army in their village. People believed that the word “Dalok” thus emerged out. The river Jinjiram flows in parallel direction of Brahmaputra across the village from east to west. Agriculture, Pig Farming, Rubber Plantation, daily wage earner, are the main source of incomes of the villager and a very few people are there with govt. job holder.
4
Demographic Profile:
Population
Below 01 year 01 – 03 years 03-06 years 06 – 10 years Above 60 years
Male Female Male Female Male Female Male Female Male Female
51 65 168 169 223 177 253 247 142 151
Socio –Economic Profile:
1 2 3 4 5 6 7
Nos. of families under BPL Category
Nos. of families with Pucca House(Single storied/ Multi storied)
Nos. of families with Kutcha House (Assam Type/ Mud House)
Nos. of families withOwn medium of transport( 4 wheelers/ 2 wheelers/tractors/ bullock cart/horse cart)
Nos. of families with Boats( Country boat/ steam boats)
Nos. of families with landline connections(Annexure – family wise Contact Nos.)
Nos. of families with mobile phones(Annexure – family wise Contact Nos.)
SS MS Kutcha house Tractor 2 wheeler 4 wheeler
CB SB
650 20 Nil 1159 12 300 2 Nil Nil Nil Annexure enclosed
8 9 10 11 12 13 14Nos. of landless families
Nos. of Homeless families
Nos. of Marginal farmers
Nos. of Small farmers Nos. of families displaced by erosion
Nos. of families displaced by any other reasons (Civil strife, unemployment etc.)
Nos. of families identified as traditional forest dwellers
200 50 352 123 0 0 0
Topographical Features:
1 2 3 4 5Area under forest
cover( In Hect)
Area of the degraded forest cover (In Hect)
Forest area under
encroachment
Area under Agroforestry
( In Hect)
Area under wetlands(Category wise- Ponds, tanks, swamp, streams, drainage channels etc.)
On Govt. Land
On Patta Land
Pond Tanks Swamp Stream Drainage Chanel etc.
Nil Nil Nil Nil Nil Nil 0.059 Hect
0.034 Hect
0.013 Hect Nil
6 7 8Area of Wetland under encroachment Hills/ Hillocks
(Nos. Location and distance from the village)Rivers
(Name, Location and Distance from the Village)
Location Converted to Agricultural & Settlement purposes etc.
Nos. Location Distance Name Location
Nil Nil 1 Dalok Village, Lalipahar
Inside the village perimeter
Jinjiram Southern part of Dalok village
9 10Area under Common lands (separately for VGR, PGR, Playground, Reserved for community purposes, Road side Reserve and Riverside Reserve
Distance VGR PGR PlayGround
Reserved for Community Purpose
Road Side Reserved
Riverside Reserved
Area of the Common lands
under encroachment
(Hect)Nil Nil Nil Nil Nil Nil Nil Nil
Land and Soils:
6
1 2 3 4 5Area under Single crops
(Indicate the crops grown and period of year )
Area under double cropping(Indicate the crops grown and period
of year )
Area under multiple cropping
(Indicate the crops grown and period of
year )
Percentage of Land in Cl. 1,2 & 3 Under assured Irrigation
Soil Types(Sandy, Loamy, Clay etc) and Crops
grown thereon
Name of crop
Area Period Double crop
Area Period Crop
Area Period 1 2 3 sandy
loamy clay
Crops grown
Sali Paddy
1800 Bigha
June to December Sali-Ahu 200 Bigha
June-Nov, Dec to Feb-
June
Nil Nil Rain fed
Nil Nil Nil Sandy-Lome
Nil Sali, Ahu, Paddy, Potato, Mustard, Black Gram, Sweet Potato, Brinjal, Assam Lemon, Banana, Turmeric, Ginger, Area Nut, Black Pepper
Sali-Summer Paddy
350 Bigha
June-Nov, Dec to Nov-
May
Nil Nil 100% Nil Nil Do Nil
Sali-Mustard
100 Bigha
June-Nov, Dec to Oct-
Dec.
Nil Nil 20% Nil Nil Do Nil
Sali-Black gram
100 Bigha
June-Nov, Dec
Nil Nil Nil Nil Nil Do Nil
Sali-Brinjal
200 Bigha
June-Nov, Dec to Sept-
Feb
Nil Nil 100% Nil Nil Do Nil
Sali- Potato
150 Bigha
June-Nov, Dec to Oct-
Jan
Nil Nil 25% Nil Nil Do Nil
6 7 8 9 10Soil Specifications
(PH-Value, Alkalinity, Micro nutrients etc.)
Sources of Irrigation(Yes/ No),
If yes pls. specify the source
Visible evidences of degradation in Soil-
HealthSources of Degradation Impact of Soil Degradation
PH value
Alkalinity
Micro nutrient
4.81—6.10
Acidic Organic Carbon, Phosphorus, Potash, Nitrogen, Zinc,
Yes Shallow Tube-Well-150 Bigha, Natural Stream flows from
Siltation of Paddy Field.
Due to continuous rainfall and Flash Flood on 22nd and 23rd Sept., 2014
Loss of Soil Fertility & Nutrients, Decrease of Cultivable Land.
7
Molybdenum, Boron, Manganese.
Ajagar Hill-350 Bigha.
Wetlands:
1 2 3 4 5Name of Wetland
Location of the Wetland & Distant
from Village
Nature of the Wetland Encroachment free area around the
wetlands
Usage of the Wetland i.e. for what purpose it is being
utilized
Nature of water inlets
Whether Public
WhetherPrivate
NIL NIL NIL NIL NIL NIL NIL6 7 8 9 10 11
Volume of Water
Average depth(during different parts of the year)
Difference in the actual area and area in land
records
Width and Area of upland buffer
Width of Greenbelt around wetland
Major fish verities, fauna found as Wetland
NIL NIL NIL NIL NIL NIL
12 13 14 15 16Nature of Vegetative buffer around
the WetlandChemical composition of
the WaterNature of Industrial/ Commercial activity
near Wetland
The adjoin drainage systems etc.
Nature of invasive vegetation, if any
NIL NIL NIL NIL NIL
Hills:
1 2 3 4Name of Hills &
locationsWhether, it is landslide prone (Yes/
No)History of landslides Nature of Vegetation on the hill slopes
Lali Pahar No No Vegetative cover with trees of mixed species
5 6 7 8Natural water flow
channels on the hills Stability of the hills slopes Encroachment on the hills
slopes
8
slopes No NA No
Rivers and Rivulets:
1 2 3 4 5Name of River &
RivuletsNature of Embankment Encroachment on natural
course of the rivers/ streamsVegetative buffer on the
banks of RiversHistory of Floods etc.
Jinjiram River NIL Nil In some parts there are Bamboo plantations and other local tree varieties.
HFL = 48.80m, LW.L = 42.62mRiver Jinjiram is a tributary river of Brahmaputra. Dalok village is situated adjacent to the river Jinjiram near Agia. Dalok village was severely damaged by Flash Flood, 2004 & 2014. Vast cultivable and homestead land of the village were badly affected due to flood inundation.
Green Cover:
1 2 3 4Major tree varieties Minor Forest Produces Reason for depletion of Green Cover Details of JFMCs
Sal, teak, Makri sal, kathal Grass, stone, river sand gravel course
Biotic interferences JFMC is not available
9
Institutions & Infrastructure:
3 4Higher Secondary School (High School) College
Nos. of Class rom
Nos. of Toilets
Sources of Drinking water
Open Space available
Type of Building
Nos. of Class rom
Nos. of Toilets
Sources of Drinking
water
Open Space available
Type of Building
Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
5 6Health Sub-Centre PHC/MPHC
10
1 2Primary School Middle School
Nos. of Class rom
Nos. of Toilets
Sources of Drinking
water
Open Space
available
Type of Building
Nos. of Class room
Nos. of Toilets
Sources of Drinking water
Open Space available
2 2BT-1GT-1
Hand Tube well
Yes Assam Type Nil Nil Nil Nil
Location Type of Building
Nos. of Doctors/Paramedics
Nos. ofANM
Nos. of Bed
Location Type of Buildings
Nos. of Doctors/
Paramedics
Nos. of ANM
Nos. of Bed
Nil Nil Nil Nil NilAgia BPHC.Distance= 1.5 KM.
Assam Type Doctors- 3Paramedics- 22
4 5
7 8Vety Sub-Centre Vety PHC/MPHC
Location Staff Location StaffDarka 1. Arun Kalita VFA, 9864063129
2. Atma Ram Rabha Chaukudar, 985900145
Balijana 1. Dr. Moinul Hoque, BVO, 9854185738
2. Sri Jubaraj Rabha, SM, 9854292740
3. Sri Jahanuddin Ahmed, VFA, 9435313187
4. Sri Sohid Bakhs Chakidar, 9854287650
9 10 11Status of Road Connectivity (All weather
Pucca Road/ Gravel roads, Kutchha Road)Nos. &Status of the bridges, Culverts, Status of Alternative
Roads, if the main roads gets disconnected
All weather Pucca Road
Gravel roads Kutchha Road Nos. Bridges Culverts Status Status
Agia Jaganath Para Rajbongshipara Road. Total Length 4.00 KM.
1 2/1 SPT Bridge
Very poor conditio
The condition of alternative Road Jogna Rajbongshipara to Derek is very poor and it
11
n Length 98.00 M
is an earthen road.
16Triple Row 1 No and Single Row 15 Nos.
Good
1. Dalok to Bhandra Road. Length 1.20 KM.
0Nil Nil
2. NH-37 to Agia Kalitapara Road. Length 1.50 KM.
6 Nil Single Row 6 Nos.
Good.
3. Agia Kalitapara Road Length 800.00 M
2 Nil Single Row 2 Nos.
Good
1. Jognapara to Derek Road. Length 1.00 KM.
0 Nil Nil
12 13 14 15 16Sources of Drinking water Visible evidence of water
contamination and nature of contamination
Sources of water contamination
Household with Sanitation facility
Status of Community Hall
Villagers own Well, Hand Tube well etc. High Iron content. Ground water with high iron content
70% households Derek High School, Bishnu Mandir (Lali Pahar)
17 18 19
12
Availability of Upland suitable for Shelter during natural disasters
Minimum distant of the Upland suitable for Shelters( both for human being & cattle)
Availability of suitable place for Carcass disposal
Lali Pahar and Lakhinder Hillock (At nearby Jogna Rajbonshipara village)
Lali Pahar 0 kilometer, Lakhinder Hillock 0.5 kilometer No specific place for carcass disposal (Cattle etc.), generally disposed in open areas or disposed in pits. For human being there are Smashan & Graveyard at Bokdo.
Industrial/ Commercial Installation:
Following information should be collected for each Industrial/ Commercial Installation:
1 2 3 4Nature of Business/ Production Registered of the unit
at DI&CCNature of emission &
effluentsSteps taken by the Industry/ business to prevent
harmful effects
13
1. Sri Dipak Ray, Rice Mill, Vill. Dalok, P.O. Agia
2. Sri Baneswar Ray, M/S. Rice Mill, Vill. Dalok, P.O. Agia
3. Sri Dhiraj Ray, M/S. Ray Bakery, Vill. Dalok, P.O. Agia
4. Sri Karunadoi Ray, M/S. Ray By-cycle Repairing. Vill. Dalok, P.O. Agia
5. Sri Rina Roy, Tailoring Unit, Vill. Dalok, P.O. Agia
6. Sri Jitu Ray, Pan Shop, Vill. Dalok, P.O. Agia
7. Sri Amulya Roy, Pan Shop with Grocery Shop, Vill. Dalok, P.O. Agia
8. Sri Prasanmol Ray, Grocery Shop, Vill. Dalok, P.O. Agia
Not registered
Not registered
Not registered
Not registered
Not registered
.
No emission & effluents
Does not arise
Do
Do
Do
Do
Do
Do
Do
5 6 7Likely impacts of emission & effluents Visible evidences of air,
water, land pollutionSteps taken by the Industry/ business to sensitize the people
about the harmful impacts of emission & effluentsDoes not arise
Do
Do Since there is no emission & effluents no step taken to sensitize
14
Do
Do
Do
Do
Do
No
the people about harmful impact.
15
Seasonal Calendar for Agricultural Crops
Sl No
Crop Types Season (Months)
1 Rabi Crops:(Black Gram, Brinjal, Cabbage, Radish, Potato, Gourd, Oil seeds, Sweet Potato, Other Green Vegetables)
Sept Oct Nov Dec Jan
2 Ahu Crop( Ahu Rice) March April May June
3 Summer Paddy Dec Jan Feb March April May4 Sali Paddy June July Aug Sept Oct Nov Dec5 Kharif Crops:
(Jika, Bhol, Kumura, Ladies Finger and other summer Green Vegetables)
Oct Nov Dec Jan Feb March
Household Details:
Household PatternsAssam Type/RCC IAY Kutcha
Mud or Thatched HouseTotal
113 19 109 241
Occupation Pattern:
Occupation PatternGovt.
Employee/Service Holder
Cultivator/Farmer Labour Skilled Labour (Driver, Mistry
etc.)
Businessman Pension Holder
26 60 87 4 32 16
Livestock Details:
Crossbreed Cow
Local Cow
Buffaloes Sheep Goats Pigs Poultry Dogs
32 240 Nil Nil 165 54 1052 22
PRI Member Detail:
PRI Member Name Contact NumberGodhuli Ray 9508212044Tredis Marak 8822842707
Drinking Water Source & Functionality:
Tube well No. &
Location
Functional current/Disaster
Well No. & Location
Functional current/Disaster
Other sources of Drinking Water
(Natural)
Location
About 40% of Households
Mostly Functional in both conditions
About 80% of Households
In normal condition Functional, The kutcha wells without concrete ring gets submerged in flood water
Spring Water coming from Satboini range of Hillock
Bokdo
PDS Shop:
1. No PDS shop in the village.2. No Grocery shop in the village (only some small petty shops, Gumties)3. People get essential food items from Samabay Samity (Co-operative) located at Agia (1.5 kilometers away from the village)
Burial Ground: 1 no. of Samshan at Bokdo.1 no. of Graveyard at Bokdo near the Church.
17
HAZARD, VULNERABILITY AND CAPACITY SCENARIO OF THE VILLAGE
HAZARD:
During the community consultation and PRA exercise, people identified the following hazards for the village:
A. Flash Flood : The village has encountered three major flash floods in the last 10-30 years.
Flash Flood 1990: In the month of July. It damaged crop field and inundated village roads and house premises. About five nos. of residential houses were washed away by Flash Flood water.
Flash flood 2004: In the month of October. About 20 nos. of houses were completely washed away by flood water and about 12 nos. of cattles died. Standing Rabi crops were completely damaged. Sand deposition in the paddy field went up to 8-12 inch.
Flash flood 2014: In the month of September. According to the community, the water current was much intense than previous incident in 2004. About 25 nos. of residential houses were completely washed away by flood water. The wooden bridge was completely submerged. The approach road to the bridge in the northern part was eroded and the communication was completely disrupted. Boats were deployed for rescue and supply of relief materials. Standing Sali paddy was damaged. Growing Brinjal plants were damaged. People said that as the incident occurred during day time, they were able to take shelter in Lali Pahar, Bishnu Mandir for which no casualty were observed.
B. Erosion: After the flash flood erosion becomes a big problem of the Dalok village. In many parts of river Jinjiram the river bank eroded heavily leading to threatening conditions to the adjoining households which were situated near to the river bank.
C. Wild Animal Depredation: Wild animal particularly wild Elephant enters into the village from nearest hills and damage crop field and villagers’ houses. Wild Elephants crossed the Dalok village near by Bokdo L.P. School. The Elephants used to destroy the paddy crops every year. It is a very big challenge to the Dalok villagers.
18
VULNERABILITY:
People of Dalok village have identified vulnerabilities, some of which are physical, economical, environmental and situational.
i. Physical :
Jinjiram River: It is a small tributary originating from Meghalaya and flows in parallel direction of Brahmaputra across the village from east to west. People although consider the river as bless but it causes flash flood when there is heavy rainfall in Meghalaya. In Goalpara, Jinjiram is the only river which flows in western direction to fall in river Brahmaputra. It originates from foothills of Meghalaya located in south of the district Goalpara and take turn to the east and then flows across the village towards west direction through Mankachar before falling into river Brahmaputra. Before entering into the village Dalok, the river Jinjiram passes aside by Urpad Beel (the largest wetland of Goalpara district.) According to community the Jinjiram increases vulnerability of the village for flash flood due to following factors.
There is heavy siltation of the river from Derek to Deulijira for which water carrying capacity of the river reduce significantly.
Heavy rainfall in Meghalaya causes intense current of water
It carries mud, aquatic weeds and huge debris during inundation
Channels of two wetland knows as Thakurbilla Beel and Rourang Beel in the western part of the village become closed for which water from the river Jinjiram cannot go to the wetland leading to increased water level.
If there is breach of embankment in river Jinari, water enters into the river Jinjiram and causes heavy inundation in the village Dalok.
According to the villagers one of the major causes for breach of embankment in Jinari River is backflow of water due to barrier created by railway track (Located around 10 to 12 K.M away from the village at Thailapara, Dhaigaon of Krishnai area). When there is heavy rainfall in Meghalaya, the railway track prevents the flow of water in its inflow direction and causes backflow of water to enter into the river Jinari. Thus there is heavy rise of water level and causes breach of embankment and water enters into the Jinjiram River.
The rive Jinjiram has to pass through a narrow passage between the two hillocks at Rongsai in western direction. According to the community, there is heavy siltation in this portion for which it cannot carry sufficient water volume during rainy season. As a result heavy inundation observed in village Dalok.
19
5 Nos. of families residing away from about 50 meter of the wooden bridge. After the flash flood, the approach portion of bridge was completely damaged and slowly erosion is extending towards these families.
20 Nos. of families living near the bank of the river in the southern part of the villages. After the flash flood, erosion starts and it has started to engulf the residential areas of these families.
Wooden Bridge: The wooden bridge over the river Jinjiram connecting North and Southern part of the village is a big hazard for the village. The bridge is very weak and except bicycle, no other vehicle can go over the bridge. Although people can go on- foot over the bridge, but it become very risky for old, infirm, disable, children and pregnant women. Moreover debris and aquatic weeds clogs over the wooden pole of the bridge and it slows down the flow of water.
Railway track: According to the villagers one of the major causes for breach of embankment of Jinari River caused by backflow of water due to barrier created by railway track (Located around 10-12 K.M away from the village at Thailapara, Dhaigaon of Krishnai area). When there is heavy rainfall in Meghalaya, the railway track prevents the flow of water in its inflow direction and causes backflow of water to enter into the river Jinari. Thus there is heavy rise of water level and causes breach of embankment and inundation of the Jinari. If there is breach of embankment in river Jinari, water enters into the river Jinjiram and causes heavy inundation in the village Dalok.
ii. Environmental factors : Heavy rainfall in Meghalaya, Massive deforestation and siltation of river and channels.
iii. Social : There are 26 nos. of physically challenged people ( Hearing impairment: 12 , Dumb: 6 , Mentally retarded : 3, Locomotors disturbance: 5 ) in the village and they are considered one of the most vulnerable groups. There are also 74 nos. of people above the age of 60 years and 88 nos. of children below the age of 6 years. These groups are also considered as vulnerable for any natural calamities.
iv. Economic : During PRA exercise, wealth ranking tool was followed to find out the poor families as per people’s perception. Accordingly they identified 150 nos. of poor families and these families are considered as vulnerable for any kind of natural calamities.
20
RISK GROUPS:
Household Economic Status:
No of BPL Households
No of People above 60 years of age
No of Physically Challenged Persons
No of Children below 6 Years
87 74 26 nos. people ( Hearing impairment: 12 , Dumb: 6 ,
Mentally retarded : 3, Locomotors disturbance: 5 )
88
*(Details in the Annexure of Family Details.)
CAPACITY OF THE VILLAGE:
Detail about Infrastructure present in the village:
SL No. Type of Infrastructure Details with manpower related if any
Remarks
1 Primary Schools Dalok Primary school (Assamese medium)
All school buildings are of Assam type. In Bokdo Model L.P. school a rain water harvesting system is already installed, although found non-functional due to broken pipe. All schools are having their own hand tube-well installed in their campus.There was no middle school in the village.Students of the village go to nearby J.N. Memorial High school at Agia (about 1.5 KM from Dalok) and Derek H.S. school (about 0.5 KM from Dalok) for further higher studies.
Haldibari L.P. schoolBokdo Model L.P. school (Garo medium)
2 Post Office Agia Sub-Post Office. About 1.5 KM from Dalok village.
3 Health Centres Agia BPHC About 1.5 KM from Dalok village.ANM Name- Pratibha Basumatary.ASHA Name- Ritamoni Roy (Contact No. 9577800764)Raymati Ray (Contact No. 9613455887)
4 Aanganawadi Centres Bokdo AWC AWW- Rani Adhikary, (Contact No. 8134812203)
Haldibari AWCDalok AWC
21
Rumita Sarma, (Contact No. 9864860044)Tutu MarakAWH- Promoda Roy, Kanchan Roy.Renu Das
5 Fire Station Goalpara Fire & Emergency Service, Goalpara
About 13 KM from Dalok
6 Police Station Agia Police Station About 1.5 KM from Dalok
7 Veterinary Health Centers Balijana Vety. PHC About 2 KM from Dalok) Dr. Moinul Hoque, BVO. (contact No. 9854185738),Jubaraj Rabha, SM (contact No. 9854292740),Jahanuddin Ahmed, VFA (Contact No. 9435313187)
Dwarka Vety. Sub-Centre About 10 KM from Dalok. VFA- Arun Kalita(Contact No. 9864063129)
8 Agriculture Dept. VLEW- Dilip Roy (Contact No. 9854175894)
9 Roads NH37 to Dalok PWD Road via Haldibari (Road Length-1.5 KM)
Kutchha Road, not usable during high flood season.
Chandamari to Dalok PWD Road Kutchha RoadAgia to Jogna Rajbangshipara PWD Pucca Road, this
road is the main road for the village which is usable in all-weather condition.
Dalok PWD Road to Bhandra Gravel road.Balijana Bazar to Dalok PWD Road via Lali Pahar.
Kutchha road.
10 Church At Bokdo The connecting foot bridge on river Jinjiram has been washed away during flash flood 2014. There is a bamboo footbridge build by the villagers.
11 Kali Mandir At Dalok12 Sri Sri Bishnu Mandir At Lali Pahar13 Bokdo youth club At Bokdo President: Miyang Marak,
the club use to organize football match, involve in tree plantation etc.
14 Dalok Krishak Sangha Library
At Dalok Damaged by Flood 2004
22
Human Resources:
Category Name Contact No.Nurse Malika Ray D/o. Gajen Ray
Anusabita Sangma D/o. Letmison MarakBarsila Marak D/o. Ebison Marak
Lab Tech. Gyanendro Ray S/o. Probal Ray 7896612256Pharmacist Mukul Ray Prof. Good Medicos (Agia
Bazar)9859872152
Jitu Ray S/o. Aneswar Ray 9577107609Omprashad Ray S/o. Puren Ray 8011915522
ANM Anjona Ray 9401450437ASHA Raymoti Ray C/o. Anul Kumar Ray 9577536740
Ritamoni Ray W/o. Mahanta Ray 9577800764AWW Rani Adhikary Ray W/o. Lt. Sahid Ray 8134812203
Promoda Ray W/o. Lt. Rajkumar RayKanchan Ray W/o. Karnoda RayRumita Sarma W/o. Bibhuti Nath 9864860044Tutu Marak D/o. Lotif ThakuriaMerry Christina Marak W/o. Dingwen
Electrician Ajoy Ray S/o. Lt. Joshen RayJatil Ray S/o. Profulla RayDitendro Marak C/o. Lt. Lahansing Sangma
Mechanic (TV/ Cycle)
Soneswar Ray S/o. Lt. Saran RayKarnada Ray S/o. Sachimohon Ray
Ex-Army/ Police Person
Khiren Ray S/o. Mahendra Ray 9854024366Siron RaySuresh RabhaBaneswar Ray S/o. Sarup Ray 9864037718Jagadish Ray S/o. Jhauram RayJashna Ray S/o. Sailendro RayPrenkolin MarakMaliram Sangma
Army/ Police Person
Kulo Ray S/o. Khiren RayKapil Ray S/o. Narayan RayBiswajit Ray S/o. Narayan RayRenuka Ray D/o. Bipin RayGoutam Ray S/o. Siron RayKamal Ray S/o. Gojen RayMintu Ray S/o. Jogodish RayTorulota Ray W/o. Brojen RayBipro Ray S/o. Lt. Salendra RayParesh RayGrewison Marak S/o. Bridicson MarakKornunson Marak S/o. Bridicson MarakLupendra Sangma S/o. Maimonsing MarakWillipson Marak S/o. Songsin MarakDiling Marak S/o. Relwingston MominEfarson Marak S/o. Saratsing SangmaSengrak Momin S/o. Morningston Marak
Ex- teacher Hemen Ray S/o- Ramakanta RayKhirod RayMirendra Sangma
23
Teacher
Tarun Ray S/o- Phanindra RayRumamoni Ray D/o- Hemen RayRinku Ray S/o- Khiren RayPranjal Ray S/o- Probal RayPradip Ray S/o- Suresh rayMenoka Ray (Private) W/o- Khanindra RayPVT. W/o- Rajani
D/o- Jyotshna RayNonigopal Ray S/o-Trishna Ray W/o- Dipankar RayEnwally Marak D/o- Saratsing SangmaSimplem Marak S/o- Saratsing SangmaPeralish Sangma D/o- Monmonsing MarakJhanceniar Sangma S/o- Pillar MarakMeridina Sangma D/o- Tularam MarakRelwingston Momin S/o- Akpet SangmaDingwin Sangma S/o-Erojini Marak D/o- Uddhab Sangma
Self Help Group:
Name of SHG Member
Dalok SHG
Sanita Ray (Secretary)Bina Ray ( President)Kanchan RaySabita RayKusum RaySira RayJanaki RayNalita RayJhashna RayMenoka RayTarulota Ray
Deep Jyoti SHG
Chandra Prabha Ray (President)Suchitra Ray ( Secretary)Nanda RayErabati RayBatali RayBina RayPanchami RayIndu RaySarajini RayBimala Ray
Monalisha SHG
Anjali Ray (President)Sumitra Ray (Secretary)Rani AdhikaryPratibha RayMinati RayGhote Bala RayMonjula RayRohila Ray
24
Monjula RayAnita Ray
Sunakha SHG
Dipali Ray (President)Rahita Ray (Secretary)Godhuli RayBina RaySandhyabati RayRukmini RayRitashree RayDipika RayAnima RayChandana Ray
25
CHAPTER-II
Sources of threats to the village community:
1. Flood:
a. The village Dalok is situated in the bank of river Jinjiram. The river Jinjiram which originates from the Urpad Bill in the north side of Agia flows through the village Dalok from north-east to south-west direction. During flood season, occasionally huge quantity of water flows down the Garo hills and feeds river Jinari which directs the water towards the Urpad Beel which is connected to river Jinjiram, as a result river Jinjiram gets over flooded and inundates its adjoining areas including Dalok village.
b. The River Jinjiram flows through the village with no embankment of Water Resource Department or other concern Departments. Once the water level of Jinjiram River increases, due to flash flood situation, water overflows and enters into the paddy fields and the household of the villagers.
c. During the high flash flood situation, most of the village habitations (about 90 % of total area) gets inundated and people take shelter along with their animals in Lalipahar high land area (Sri Sri Bishnu Mandir, Lalipahar) and also at Farmer Training Centre near Lalipahar. The road was also got submerged in the flash flood of 2004 and 2014.
Therefore it can be said that flood is a major threat for the villagers of Dalok village and this issue has to be managed with proper planning.
Characteristics of Flood:
Particulars Flood affected Area Non-flood affected areaHeight of flood water 1.5 to 2ft above paddy 6 to 10 ft. above paddyWater level inside house 3 – 4ft inside house 5 – 6 ft. inside houseSpan of time Water stayed inside house
5- 10 days 25 – 45 days
Span of time water surrounds the house
15 – 20 days 30 – 60 days
Nos. of Flood affected families 95%Flood affected area 90% 100%
Non-flood affected area 10%Time of Flood (Day/Night) At any time At any timeEarly Warning 1. By Meghalaya’s local
persons.2. From the Administration
1. By Meghalaya’s local persons.2. From the Administration
26
FLOOD HISTORY:
Year Month Frequency in a year
Nos. of days Time of Inundation
Cause of flood
2004 Oct 1 1 week Day-night Heavy rainfall& Over flow of River Jinjiram
2014 Sept 1 15 to 17 day Day-night Heavy rainfall & Over flow of River Jinjiram
2. Road Communication/Alternate Road:
a. Road communication is a major threat for the villagers of Dalok village.
b. Sub roads from the main roads are Kutcha and very low lying. Water used to submerge all the sub roads during rainy season.
c. There is no all-weather alternative road communication from the village towards Goalpara District.
3. Health:
Agia BPHC. About 1.5 KM from Dalok village.
4. Industry:
No registered small or medium scale industry is found in the village. Only two small rice mills & some petty Pan/ Grocery shops are found in the village which is not registered as Industrial units.
5. Veterinary:
a. There is no Veterinary Sub Centre in the village.b. Nearest Veterinary Sub Centre is about 2 km away from the Dalok village.
6. Sanitation:
100% sanitation facility yet to achieve.
7. Agriculture:
90% of the total village area is Agricultural land and most of the villagers depend on Agriculture as their livelihood. The agriculture is mostly rain-fed and no irrigation facility is available for cultivation other than naturally available spring water and rain.
27
8. Economic condition:
a. Most of the families are below poverty line.b. Maximum of the people are dependent on Agriculture.c. Their main source of income is paddy farming, poultry farming and pig farming, rubber plantation and wage labour.d. They use to prepare state of the art bio-pesticides using cow urine, Neem-Cake and other biological objects which is used in Paddy cultivations. They even use to sell it at nearest market. It is a good source of income for some of the villagers of Dalok village.e. Some of the villagers have been practicing well the vermin-composed units established with the help of Department of Agriculture, Goalpara.f. They use to practice the rubber plantation and farming the black rice, which has huge demand and has a niche market in not only Assam but also in other States.
9. Embankment:
There is no embankment at Dalok Village on river Jinjiram.
10. High Land/ Raised Platform:
In Dalok village, there are only two nos. of high lands.
(a) Lalipahar,
(b) Lakkhindar Hillock. (At nearby Jogna Rajbongshipara village, .5 K.M away)
There is no Raised Platform at Dalok village.
11. Community Hall:
The villagers of Dalok village used to take shelter at Farm School at Lalipahar, Bishnu Mandir (Lalipahar). The Bokdo villagers used to take shelter at Ajagar Pahar and nearby Derek High School.
12. Rivers/ Streams:
There is only one river at Dalok village which is known as Jinjiram River. There is a natural stream coming out of nearby Satboini Range of Hillock.
13. Bridges:
There is a weak SPT bridge over river Jinjiram connecting the north and south part of Dalok village. The other SPT Bridge at Bokdo on Jinjiram River was washed away on 2014 flash flood. There is one Bamboo foot Bridge over the River of Jinjiram at Bokdo-Haldibari. Wooden Foot Bridge (at Dalok –Batenga) washed away at 2014 (not repaired yet).
28
14. Irrigation:
Irrigation is mainly done by Pvt. Shallow Tube Well, Tara Pump etc.
15. Self Help Group:
Only 4 nos. of Self Help Group. These groups were trained on handloom skills by Handloom & Textile and Sericulture Department. The Agriculture Department has distributed de-hustling machines to some NGO and other beneficiaries.
16. Boulder Pitching of Riverbanks of Jinjiram River:
Wear & Tear in the existing boulder pitching work on North & South bank of the river Jinjiram.
17. Animal Depredation:
Wild Elephants crossed the Dalok village near by Bokdo L.P. School. The elephants used to destroy the paddy crops every year and it is a very big challenge to Dalok villagers.
29
CHAPTER-III
As the major threats that have been faced by the villagers of Dalok village, have been identified, there is need of concrete planning to cope with the identified threats. The plan to cope with each and every identified threat will be of two types. One will be the activities that have to be performed or done by the entire community under the guidance of VLMCC and the second will be in collaboration of different line depts. with integration of Govt. Schemes of various departments.
A. PLANNING TO COPE WITH THE SPECIFIC ISSUES OF THE VILLAGE:
Area of threats Problems and Challenges identified
Solutions proposed
Community Level With Govt. Support
Flood/ Flash Flood a. During flood season, occasionally huge quantity of water flows down the Garo hills and feeds river Jinari which directs the water towards the Urpad Beel which is connected to river Jinjiram, as a result river Jinjiram gets over flooded and inundates its adjoining areas including Dalok village.
b. As there is no embankment when the water level of Jinjiram River increases, due to flash flood situation, water overflows and enters into the paddy fields and the households of the villagers. (about 90 % of total area gets affected)
a. Advice the community to raise the plinth level of the houses above the HFL and take other DRR measures like raising the hand pump height above HFL recorded.
b. Villagers can take DRR measures like plantation of Bamboo on the river banks and also other fast growing vegetation on the buffer zone. Vetiver Grass can be grown on the river slopes to stop erosion.
a. IAY Houses provided by the P & RD Department has to be built keeping in mind the HFL of the village.
b. Field level functionaries of the Water Resource Department will make a survey of the need of the embankment along the River Jinjiram and accordingly send proposals for construction of the embankment. Also identify the vulnerable stretches or points.
c. Field level functionaries of the Water Resource Department will keep a strict vigil on the raise in water level of river jinjiram & keep updating the VLMCC
Road Communication/Alternate
a. Sub roads from the main roads are
a. VLMCC will survey the alternative roads
a. PWD (RR) Department in
30
Road kutcha and very low lying. Water used to submerge all the sub roads during rainy season.
b. There is only one all-weather alternative road communication from the village towards Goalpara District.
available and pursue the concern line department for conversion of the existing kutcha roads to all-weather PWD Roads inside the Dalok village as per the provisions available with the govt.
b. VLMCC/Community will keep a strict vigil on the road communication & ensure the transportation during the submergence period by marking the roads using bamboo poles.
consultation with the Circle Officer has to send proposals under various schemes for construction of roads.
b. PWD (RR) will ensure the disrupted road connectivity as early as possible by doing immediate restoration activities under SDRF.
No Embankment Absence of any Embankment on the river Jinjiram has caused serious threat as it increases the vulnerability of inundation of the adjoining areas of the village when the river water level increases. This also increases the risk of erosion of the river banks
VLMCC can take DRR measures like plantation of Bamboo on the river banks and also other fast growing vegetation on the buffer zone. Vetiver Grass can be grown on the river slopes to stop erosion.
Field level functionaries of the Water Resource Department will make a survey of the need of the embankment along the River Jinjiram and accordingly send proposals for construction of the embankment. Also identify the vulnerable stretches or points.
High Land/ No Raised Platform
In Dalok village, there are only two nos. of high lands
VLMCC will identify some places in the village for developing it in to possible raised platform. Also they will identify raised locations or high lands for the live stocks to take shelter during flood season.
Raised Platform to be constructed in the Dalok village under MGNREGA by the P & RD Department for both human and livestock shelter during flood situation.
Weak Bridges a. There is a weak SPT bridge over river Jinjiram connecting the north and south part of Dalok village.
b. SPT Bridge at Bokdo on Jinjiram River
a. Local community will maintain the existing Bamboo Foot-Bridges for further use by the community.
b. VLMCC will check and verify for repairing the weak bamboo bridges
a. PWD, RR department will take measures for replacement of existing wooden bridge with RCC Bridge.
b. PWD (RR) will check and verify the physical
31
was washed away on 2014 flash flood.
c. There is one Bamboo foot Bridge over the River of Jinjiram at Bokdo-Haldibari.
d. Wooden Foot Bridge (at Dalok –Batenga) washed away at 2014
before flood season for maintenance of uninterrupted communication during flood season.
conditions and usability of the existing bridges before the onset of the flood seasons.
Community Hall a. The villagers of Dalok village use to take shelter at Farm School at Lalipahar, Bishnu Mandir (Lalipahar).
b. The villagers of Bokdo used to take shelter at Ajagar Pahar and nearby Derek High School (at nearby Jogonnarajbongsipara village)
VLMCC will take measures at the community level for Construction of community hall with the capacity of 200 people at LaliPahar and Paharkata along with drinking water and sanitation facilities.
P & RD Department may take measures for construction of Community hall at the identified locations under the existing schemes.
Health facility BPHC at Agia, about 1.5 KM away from Dalok village.
a. VLMCC will keep the contact details of all the officials of the Agia BPHC so that they can be contacted during any emergency.b. VLMCC to keep contact details of nearest Public health Centre.
a. Jt. Director of Health Services to ensure that Doctors/Paramedical staff remains in the BPHC as per provision. Sufficient medicines need to be stored to meet any emergency situations.b. Health Department to ensure the ASHA worker and ANM to maintain their field visit regularly and create awareness about health & hygiene and render swift services during any emergency.
No Irrigation System Irrigation is mainly done by Pvt. Shallow Tube Well, Tara Pump etc.
VLMCC along-with the community can built an Water tank at a high place for storing the spring water and using the gradient a viable pipe
Department of Irrigation will check the possibility establishment of an Irrigation system in the village or linkage
32
water distribution system may be built.
to any existing scheme nearby.
Wear & Tear of Boulder Pitching of Riverbanks of Jinjiram River
Wear & Tear in the existing boulder pitching work on North & South bank of the river Jinjiram.
a. VLMCC will take measures to maintain the existing boulder pitching along the river bank of Jinjiram
b. Additionally Villagers can take DRR measures like plantation of Bamboo on the river banks and also other fast growing vegetation on the buffer zone. Vetiver Grass can be grown on the river slopes to stop erosion.
The concern Department (WRD, Soil Conservation, P&RD etc.) will take necessary measures for repairing and reinstating the boulder pitching.
Veterinary a. There is no Veterinary Sub Centre in the village.b. Nearest Veterinary Sub Centre is about 2 km away from the Dalok village.
Villagers will approach to the Veterinary department for vaccination of the animals before flood season.
a. Veterinary department should organize animal health camps and vaccination camp at village level.b. The VFA will make frequent field visit to assist the villagers and assess the need of medicine & fodder during Floods.
Industry No registered small or medium scale industry is found in the village.
a. The villagers will explore the help of the schemes available with the DI&CC for entrepreneurship development, Skill training etc.
b. More Self-Help groups will be formed
a. DI&CC will try to integrate the existing schemes and will help providing maximum number of beneficiaries from the village.
b. Department will help the Self Help group with the required training on Skill development and will help in bank linkage.
Economic Condition a. Most of the families are below poverty line.
a. The villagers will explore the help of the welfare schemes available with the
a. Concern departments like Social welfare, DI&CC, P&RD
33
b. Maximum of the people are dependent on Agriculture.
concern departments like Social welfare, DI&CC, P&RD for employment generation and livelihood promotion etc.
b. Use of Vermi compost & Organic farming practice will be promoted more for better yield in Agriculture
etc. will try to integrate the existing schemes and will help providing maximum number of beneficiaries from the village.
b. Department of Agriculture will help the farmers with required help & guidance for productive Agriculture.
Animal Depredation (Elephant)
a. Wild elephants destroyed paddy crop and houses of Dalok villagers every year.
a. VLMCC will identify the elephant trespass routes & will keep habitations out of those areas
b. Villagers will intimate the Forest Department as soon as Elephant intrusion is detected.
c. Villagers can use the traditional methods to keep away the elephants
The Forest Dept. will take necessary measures to protect the villagers from Elephants. They may train some villagers for required skills to flee away the Elephants and also to help the forest Guards in keeping vigil.
B. MITIGATION MEASURES AND LINKAGE WITH THE DEPARTMENTAL SCHEME:
Sl. No. Activity Role of Family Govt. Schemes
1. Safety of the documents
All important documents will be kept in plastic bag and place it above the maximum flood level.
Local NGO, INGO should provide some plastic folders for safe the important documents of villagers before flood.
2. Safety of Books All the books should keep in plastic bag a place it above maximum flood level
SSA can think of providing water proof bags to keep the books safe
3. Making of Life Jacket with locally available items.
Should have willingness to learn it and use it.
DDMA and Panchayat should provide training at village level with the help of Civil Defence.
4. Training of Swimming
Every family member should know how to swim.
DDMA and Panchayat should provide training at village on swimming with the help of
34
Civil Defence.5. Rising of Plinth. Every family should try to raise
their plinth of the house above the HFL.
Provision should be made in IAY houses to raise the plinth above HFL.
6. Banana & Bamboo plantation,
Should plant Banana & Bamboo so that Raft can be prepared during flood.
Agriculture & Forest Department can encourage plantation and implementation of such schemes.
7. Keeping of Dry food for all family members
One food stock should be maintained in each family with dry food so that they can be used during flood.
8. Keeping fuel Every family should keep adequate amount of firewood for using during disaster. Kerosene oil should also be kept aside for using during flood.
Forest department should provide firewood during flood.
9. Important medicines, Halogen tablet, bleaching powder etc.
Every family should keep essential medicines, O.R.S., Halogen tablet, bleaching powder etc. They can collect the same from nearest Govt. Hospital.
Health Department & PHE Department should organize awareness program on this and distribute the same before flood.
10. Vaccination of domestic animals.
Approach to the Veterinary department for vaccination of the animals before flood season.
Veterinary department should organize animal health camp and vaccination camp at village level.
11. Food for Animals Every family should identify a place for fodder cultivation and cultivate fodder.
Veterinary should provide seed for fodder cultivation.
12. Transportation As road communication completely break down during flood, every family should keep one country boat if possible. They should learn Raft making technique.
DDMA should provide training on Search & Rescue.
13. Preparation of various teams.
Families should have the preparedness to face disaster and keep themselves safe.
DDMA should facilitate to form the teams like Early Warning team, Search & Rescue Team, Vigilance Team, First- Aid Team etc. and organize training for them.
35
C. FORMATION OF VARIOUS COMMITTEES AND THEIR ROLES & RESPONSIBILITIES:
The VLMCC will be the prime committee in the Dalok village for planning, implementation & monitoring the disaster management activities and the development activities in the village.
VILLAGE LAND MANAGEMENT & CONSERVATION COMMITTEE (VLMCC), DALOK
Sl. No.
Name of Member Designation Position in the committee
Contact No.
1. SadhanaSangma Ward Member Chairperson 87519-663622. LeenaSangma Ward Member Member 99547-246013. Biren Ch. Kalita Lot Mandal Member/Secretary 98592-666904. Dilip Ray VLEW Member 98541-758945. Juba Raj Rabha VFA of Veterinary
Deptt.Member 98544-22185
6. Ganesh Pathak Field level staff of Forest Deptt.
Member 98598-49309
7. Nabin Ch. Pathak Head Teacher/ Asstt. Teacher
Member 98544-22345
8. DebendraRabha SA of Irrigation Deptt.
Member 98546-92079
9. Gadhuli Ray Villager, elected in Gram Sabha
Member 9508212044
Roles & Responsibilities of VLMCC:
FLOOD:
Sl. No. Period Action to be taken
1. Before Flood
Discuss the history of floods in the village to find out what went wrong in responding to the threat at the community level and by the government agencies.
Familiarise yourself with the Flood Hazard Atlas prepared by the ISRO showing the vulnerability of the Dalok village.
Consult the report prepared by the Water Resources Department on the vulnerable sections of the embankment and share your own assessment of the same with them.
Make an assessment of the houses constructed by encroaching on the natural course or normal floodplain of the river.
Make an assessment of the houses in lower areas prone to water logging or flooding.
Update the list of vulnerable sections of population prepared
36
for facing flood. Prepare and keep updating the inventory of items that may be
helpful in facing floods. These include boats, ropes, tents, tarpaulin, torch light etc. Identify and prepare the list of useful human resources,
including persons with good swimming and diving skills, persons with knowledge of carpentry, persons who can help in administering First Aid etc.
Update contact details of the SEOC, DEOC, Circle Office and other numbers dedicated to emergency management.
Familiarise yourself with the places/sites/buildings identified to be used for temporary shelter or Relief Camps or for keeping the cattle during floods.
Familiarise yourself with the places earmarked for the disposal of carcass.
Drinking water, sanitation facility, food, fodder and medicines are the critical necessities for the flood-affected people.
Make an assessment of the stocks and resources available with the community and village level organisations and familiarise yourself with the arrangements made by the government departments.
Organise training for the villagers with the help of line departments on purifying river water to be used for drinking purposes, making temporary low-cost latrines, and medicines for common diseases.
Take stock of the problems in connectivity faced during the worst case scenario and report the weak bridges, poor approaches to bridges, non-availability of drainage facility or bypasses for the roads prone to water logging or flooding.
Identify alternative routes to be used if main arteries of connectivity get disrupted.
Identify persons who can be used to send information to the authorities if communication channels of landline or mobile phone do not work.
Form Quick Response Teams with village level volunteers for effective response to the challenges in the same manner as for the earthquake. Such Teams may be formed for:• Rescuing and carrying the persons to safer places.• Helping vulnerable sections of population in
evacuation.• Carrying the cattle to safer places.• Providing First Aid.• Carrying seriously ill persons to hospitals/Health
Centres immediately.• Setting up temporary shelters/camps.• Disposal of dead bodies and carcasses.
It is essential to know the duties and responsibilities of various government departments to demand services from them. Familiarise yourself with the provisions contained in
37
Assam Disaster Management Manual in this regard. Also familiarise yourself with the SDRF guidelines for
financial assistance to the affected persons. Awareness generation should be an on-going activity and be
intensified during pre-monsoon period. Food security is a critical issue for the perennially flood-
affected areas. It can be assured by growing appropriate flood-resistant and short-duration varieties of crops and altering the cropping pattern suitably.
Ask Agriculture Department to provide training and input support.
Agriculture department is also required to raise nurseries and have some sufficient supply of seed and saplings to help farmers cope with the crop damages caused by floods.
Ask for information on arrangements made and norms laid down in this regard.
Permanent t solution to the drinking water problem lies in construction of dug-wells or providing hand-pumps in a manner that they don’t get submerged during floods.
It is also essential to design Running water Supply schemes in a manner that they remain functional during flood season.
Take up the matter with PHE Department. Sanitation related problems become a nightmare during
floods. Innovative designs of latrines need to be introduced. Ask PHE Department what their plans are in this regard. Construction of houses in flood-prone areas also needs to be
adapted to the ground reality. Ask P. & R. D. Department and PWD (B) how they can
help the villagers. Blocking and chocking of natural drainage systems and
encroachment on wetlands adds to the severity of floods. Ask Water Resources Department to clear the natural
drainage systems and Circle officer to remove encroachment on all wetlands.
It is the responsibility of the Education and H. & F.W. Departments to construct schools and hospitals in safer and high-land areas with proper approach roads.
Take up with these departments to take remedial measures. Keeping surplus stock of food grains is the responsibility of
Food and Civil Supplies Department. Get information from them about the stock maintained.
Ask A.H & Veterinary Department about the plans to ensure adequate provision of fodder and medicines for the cattle.
Approach SDRF through the Circle Officer for conducting mock drills and training volunteers in diving and other rescue skills.
Impact of floods on soil health can both be beneficial and harmful. Soil Conservation Department is required to make an assessment of the soil health and its impact on the
38
productivity of the land. Ask the department to share its findings about the soil health
and steps planned to restore it.
2. During Flood
Floods may strike in four forms: Low floods, High floods, sudden flooding due to breach in embankment or unannounced release of water from dams, and Flash floods due to heavy downpour in the upper reaches.
Following steps should be taken: Share/disseminate the warning/information received from
confirmed sources with optimum speed. Mobilise the Quick response teams to evacuate and carry
people to temporary shelters/relief camps. Get in touch with the authorities for assistance through
DEOC, SEOC or other Helpline numbers.(1077- DEOC & 1070- SEOC)
Take other measures as discussed in respect of coping with the earthquakes.
Beware of rumours and don’t disseminate exaggerated reports of threat or damage.
3. After Flood (Damage Assessment)
SDRF provides for financial assistance to the NOK of those who lost their lives and to the affected persons for damaged houses, crop loss, damage to agricultural fields, loss of cattle, restoration of damaged infrastructure like roads, embankments, schools, AWCs etc.
Familiarise yourself with the SDRF guidelines to able to keep a tab on the Damage Assessment exercise being carried out by the Government officials.
Maximum problems are faced in the reports regarding land affected by siltation, input subsidy against damaged crops and loss of large and small cattle.
To ensure authenticity of figures, cooperate with the Agriculture and Veterinary department officials in preparing the report.
Ensure that photographs of the affected persons claiming financial assistance and damaged assets are taken at the time of damage assessment exercise.
Insist that the damage assessment report is shared with the villagers in an open meeting before it is sent to the Government.
Report the instances of under-reporting or over-reporting to the Circle Officer immediately.
39
EARTHQUAKE:
Roles & Responsibilities of VLMCC in case of Earthquake:
Sl. No. Activity Action to be takenBefore Earthquake Strikes
1. Identification of vulnerabilities
Identification of Vulnerable houses in the villages. Identification of vulnerable public buildings: schools,
temples, mosque, Church, community hall etc. Weaker sections of embankments, ramshackle bridges,
sections of road vulnerable to landslide etc. Factories or industrial establishments using/producing
poisonous gases, effluents etc. Identification of landslide prone areas, overhead HT lines,
old and unstable trees etc. Identification of vulnerable category of persons: old and
infirm, children, people with disability, mothers with infants, pregnant women etc.
2. Identification of resources
Identification of safe buildings and open spaces that can be used as shelters.
Information to be readily available about hospitals , fire stations, police station, army bases (if any), etc.
Information on item available to be used for search and rescue; like, shovel, spade, iron chain, rope, Torch Light, Vehicle etc.
Alternate routes for transportation. Alternative means of communication. Public-spirited youth agreeable to receive training on debris
removal, search and rescue operations, attending to the critically injured persons and disposal of carcases.
Male and female members of the village to receive training on providing psycho-social support to the affected families.
3. Knowledge sharing on the risk of earthquake.
Discuss the issue in Gram Sabha meetings. Organise special meetings to share the Conversation Modules
and Information Capsules. Organise debates, poster/pamphlet making competition in the
schools on important days. Take out processions in the village involving school children
and others. Encourage Youth Clubs and schools to perform street plays.
4. Creating an environment of safer buildings.
Whenever a public building (school, AWC, Sub-centre, PHC, Drinking water structure etc.) is being constructed in the village, do enquire if they are based on earthquake-resistance norms.
See if the shelves, almirahs etc. have been kept in a secure manner in schools and hospitals and corridors are not cluttered or obstructed.
Ensure that no IAY house is constructed without a written intimation in Gram Sabha that earthquake-resistance norms are built into the design.
40
Lodge formal protest with the Circle Officer and departmental authority concerned about an unsafe public building/structure.
If a person is constructing a new pucca house, do advise him to get the design prepared/ checked by a competent structural engineer and keep a tab on the compliance with the advice.
Advise everyone not to make additions or projections in the existing buildings without verifying their strength to face earthquake.
Do take up with Gram Sabha to identify and notify unsafe buildings.
In case of mud-walled or thatched houses, people should be advised to change and secure old pillars/posts and roof-supporting members etc.
Invite officials of PWD to share further information on safe building norms.
5. Every person must know
Flag following issues in regard to the personal safety in your knowledge sharing programmes:
Remember the basic principal: Fix, fasten and forget.
Fasten all shelves securely to the walls. Install shatter-safe window films to protect from
breaking glass. Use brackets to attach wall units, bookcases, and
other tall furniture to wall studs. Place large, heavy objects on lower shelves or on the
floor. They might fall during an earthquake and the less distance they have to fall, the better.
You can also screw objects onto things, such as a desk.
Use some non-slip mats to prevent heavy objects, or objects with a low centre of gravity, from sliding. For example, fish bowls vases, floral arrangements, statues, etc.
Use an invisible nylon cord to secure tall, heavy items that can topple over to the wall.
Place an eye screw in the wall, and tie the thread around the object (such as a vase) and then tie it to the eye screw.
Place breakable items (bottles, glass, china, etc.) in closed cabinets that have latches. Lock or latch them up so that the cabinet doors cannot fly open.
Use poster tack/plastic putty to keep ornaments, figurines, and glassware adhered to shelves and mantelpieces.
Heavy pictures, light fixtures, and mirrors should be hung away from beds, couches, and anywhere that someone might sit.
If you have any deep cracks in the ceiling or foundations, repair these immediately.
41
Evaluate your electrical wiring, electrical appliances, and gas connections. Do any repairs if needed. During an earthquake, faulty fittings and wiring can become a potential fire hazard.
Store flammable products in closed cabinets with latches on the bottom shelf.
Have flexible fittings placed on your gas pipes and on your water pipes.
Always remember to have a clean desk with no items on. Remove everything from the desk that is dangerous such as a knife or scissor after they are used.
Teach everyone in your household to use emergency whistles and/or to knock three times repeatedly if trapped.
Decide on a rallying point for your family for after the earthquake. It should be away from buildings.
Go over what your family should do in the event that not everyone makes it to the rallying point.
Identify an out-of-area contact person that your family can call and get in touch with one another.
Creating a family reunion point is sensible. Familiarise yourself with the main switch of the
electrical wiring in the house. Familiarise yourself with the main switch of the gas
pipeline. Keep a First- aid kit readily available in the house. Don’t forget the safety of the cattle not free to run
away. Create a Disaster Preparedness Plan incorporating all
the points mentioned above and go over it on a regular basis.
6. Maintaining the Emergency Response Kit
Have an Emergency Response Kit ready with at least the following items:
Food (Dry / Ready-to-eat) like Chira, Pithaguri, Boot-Chattu, etc. sufficient for at least three days.
Drinking Water Bottle Baby food for infants Whistle Battery operated: Radio & Torch light Spare batteries Matchbox / lighter and candles Small knife Nylon rope First aid kit (Cotton, clean cloth, bandage, antiseptic
cream, scissor, ORS packets, etc.) Prescription medicines if needed by any family
42
member Spare eye-glasses One set of cloths for each member Soaps and personal sanitary items for health &
hygiene. Xerox copy of important documents in a plastic pouch Important Phone Nos. viz. police station, hospital,
Circle Officer, BDO, etc. Utensils (Plates – 2, Glasses -2, Food Bowls – 2, etc.) Polythene sheet (6 ft. x 6 ft. – 2 sets) Blankets (one or two) in winter season Note: All these items may be kept in a 15 litres covered
bucket / container which may be used for carrying / storing water
All the family members should be aware of this Emergency Kit items should be checked / changed at
appropriate intervals7. Be the voice of
the Community The first contact person for the VLMCC is obviously the
Circle Officer and all the resolutions should be sent to him/her.
Take up following issues with the Government Departments by sending resolutions or by inviting the representatives to the village:
Weak and vulnerable public buildings – Department concerned.
Weak embankment – E.E., WRD. Weak bridges and sections of roads prone to landslide
– PWD (R). Unstable Hill slopes and hill-cutting, quarrying or
mining - Deputy Commissioner/ SDO ( C)/ DFO (T). Facilities for treatment for head injuries, fracture,
availability of ambulance, stretcher etc. – SDMHO/In-charge, PHC.
Unstable electric poles/ power lines over settlements or vulnerable to landslide – E. E., Power Department.
Safety measures taken by Industrial establishment regarding the danger of poisonous gas leaks or effluent discharge.
Learn to use the RTI Act to get information about critical areas of interest.
When earthquake strikes8. Every person
must know Never use the lift / elevators If you are living in a kutcha house, the best thing to do is to
move to an open area where there are no trees, electric or telephone wires.
- Remain calm!If inside
Stay inside: “DROP, COVER and HOLD!” Drop under
43
sturdy furniture. Cover as much of your head and upper body as you can. Hold the furniture.
If you cannot get under sturdy furniture, move to an inside wall or archway and sit bringing knees to your chest and cover your head.
Move away from windows, mirrors, bookcases and other unsecured heavy objects
If you are in bed, stay there and cover yourself with pillows and blankets.If outdoors:
Move into the open, away from buildings, streetlights, and utility wires till the quake stops.
Avoid places where there are loose electrical wires and do not touch metal objects that are in touch with the loose wires.
There may be earthquake – triggered landslide, so avoid foothill locations after an earthquakeIf in a moving vehicle:
Stop in an open area away from all structures especially bridges, over passes, tunnels, overhead power lines.
Stay inside the vehicle. Avoid bridges or ramps as that might have been damaged by
the quake.After the quake:
Be prepared for aftershocks. Though usually less intense, aftershocks may also cause additional damages and bring down weakened structures.
If you are trapped under debris, make noise for rescuers to hear you.
Ensure your own safety and then help injured or trapped persons.
Listen to a radio for the latest emergency information. Stay out of damaged buildings / houses. Return home only when authorities say it is safe. Use telephone for emergency calls only.
9. Planning and executing immediate response.
Don’t panic or get depressed. Situation might be even worse. Try to contact the DEOC or SEOC immediately to share the
first-hand information on the scenario. Landline or mobile phone may not work. Share information
by deputing someone to the nearest HF/VHF facility. It may be Revenue Circle Office or the Police Station.
Don’t feel frustrated or let down for delay in response from outside. Many others may be in greater need of help.
It is necessary to avoid chaos and confusion in the task of search and rescue operation.
Mobilise the Quick Action Teams of trained persons and apportion areas of responsibility for the search and rescue operation.
Quick Action Teams should be functionally deployed: Helping the trapped persons out – cases with the
prospect of better chances of rescue to be attended
44
first. Carrying the injured to safe places. Carrying the persons-in-need-of help, like old and
infirm, physically challenged pregnant women and women with infants etc., to safe places.
Providing First Aid. Setting up temporary shelters by arranging drinking
water and other essential items. Clearing roads by removing fallen trees, debris,
electric poles etc. to restore connectivity. Carrying critically injured to the nearest
hospital/health centre. Make a quick head count and prepare a list of missing
persons. Remain in touch with the authorities through DEOC , SEOC
and to other Emergency Helpline Numbers.10. Clear debris to
reach out to trapped victims.
Handle debris removal carefully not to cause further injury to the trapped persons.
It is essential to give hope and confidence to the trapped persons whiles the process of debris removal in on.
Share the correct assessment and don’t exaggerate the damage caused with the SDRF and PWD (B) officials to help them mobilise the search and rescue equipment and teams. Cut the trees with available equipments and remove it as far as possible.
Cooperate with the search and rescue teams and avoid indulging in blame game.
PROTECTION & MANAGEMENT OF WETLANDS:
Meaning of Wetlands
• Wetlands, one of the crucial natural resources, are areas of land that are either temporarily or permanently covered by water.
• It includes not only (a) streams, (b) ponds, and (c) marshes, but also areas such as (d) wet meadows, (e) swamps, and (f) intermittent streams that may be dry for a significant portion of the year.
• The wetlands are of varying shape, size and depth; and locally called as beels, haors, jalah, doloni, hola, pitoni etc.
Roles & Responsibilities of VLMCC in Protection & Management of Wetlands:
Sl. No. Activity Action to be taken1. Collection of
information on past and present status of the
Apprising community of the importance of wetland, threats and measures to protect wetlands.
Interaction with senior and leading citizens to know the original nature of the wetland and tracing out its history to
45
wetlands understand the nature of the threats.
2. What VLMCC should do
Organising awareness generation programmes by: Taking up plantation around the upland buffer; Organising debates, poster competitions etc. in
schools on the World water day; Mobilising public opinion against encroachment; Peaceful marches/protest against dumping of solid
waste; Sensitising the people in neighbourhood about
harmful effects of the use of chemicals and pesticides in nearby fields or lawn.
Organising community action to clear the wetland of harmful invasive weed.
Banning of use of plastics in and around wetlands
MANAGEMENT OF RELIEF AND RECOVERY (MULTI HAZARD)
Sl. No. Activity Role of VLMCC1. Setting up Relief
camps Government is committed to provide relief to the affected
population and Assam Disaster Management Manual provides for setting up of Relief Camps until people are not able to return to their houses.
State Disaster Resource Fund prescribes norms for providing relief to the affected persons.
Familiarise yourself with the Assam Disaster Management Manual and SDRF guidelines for effective oversight on the relief management.
Important points to know about Relief camps: Every Relief Camp has to have an in-charge who
shall maintain the complete record of the inmates category-wise (Male-Female, infant, Children below six year, physically challenged persons, pregnant mothers, old person).
Relief Camp should have separate lodging facility for men and women.
There shall be separate bathing and sanitation facilities for men and women.
Availability of safe drinking water should be ensured.
Cooked food or food grains shall be provided as per SDRF guidelines.
Special food should be provided to the infants and children below six years.
The ANM and AWWs of the affected villages should stay at the camp and take care of the children and persons in need of help.
School teachers of the affected villages shall conduct classes
46
in the camp itself. Medical team should visit the camps at regular intervals and
arrangement should be there to shift the sick persons or pregnant mothers to the hospital.
Bank account of all the inmates eligible to receive financial assistance under SDRF guidelines shall be opened, if not done already, at the camp itself by organising a special drive.
Proper record of the assistance received from both Government and voluntary organisations should be kept.
A status report should be sent by the camp in-charge every day.
VLMCC is expected to maintain a close vigil on the process and help with its knowledge of affected persons and local
It is the responsibility of the government to set up relief camps, but you can help by:
Sharing authentic information of the dead, injured and missing.
Identifying the affected families and making a list of the camp inmates.
Mobilising locally available resources to meet urgent requirement of firewood, kitchen utensils, materials for temporary partition to ensure privacy for female inmates, vegetables or other agricultural produce etc.
Extending a helping hand in distribution of relief. Providing psycho-social support and emotional
healing support to the inmates. Ensuring optimum transparency in the management
of relief camps.2. Damage
Assessment It is critical to assess the damage to the life and property
correctly for assisting the affected person in the recovery process.
You can help by: Asking villagers to be present on the day of the visit
of the Damage Assessment Team. Helping the Team in identifying the affected
persons. Leading the Team to the sites of damage.
Do verify the report prepared by the team of Government officials to ensure that it mirrors the ground reality.
Bring the instances of under-reporting and over-reporting to the Circle Officer and D.C/S.D.O. through DEOC or written resolution of the Committee.
Raise your voice against delay in damage assessment.3. Taking care of
the cattle Ensure that the cattle that are not free to move are made free
to move away. Temporary sheds should be constructed for them with
proper feeding arrangement. A.H & Veterinary department Officials should immediately
be contacted to share the information of the dead and
47
injured animals and requirement of fodder. Carcass disposal is of prime importance for healthy and
hygienic environment. Do report delay in or deficiencies in the treatment of the
injured cattle or disposal of the dead.4. Ensuring Early
and Effective Recovery
Keep close vigil on the recovery and restoration efforts. Report the instances of delay in disbursal of financial
assistance. Do report instances of shoddy quality od restoration works. Organise brainstorming on the problems faced and response
to the problem to identify the areas of action to improve preparedness for the future.
Every VLMCC should come out with a consolidated report on the road-map for the future.
D. PREPAREDNESS
Formation of teams and sharing responsibility: Community has proposed to form following team for better preparedness.
1. Early Warning Team
Sl. No.
Name of Person Habitation Sex Occupation/Designation
Existing specific skill
Phone Number
1 Sanjib Ray Dalok M Panchayat member Swimming2 Jitu Ray Dalok M Farmer Swimming3 Kraibit Marak Bokdo M Farmer Swimming4 Warphindra Marak Bokdo M Farmer Swimming5 Briliance Marak
(Gaonburha)Bokdo M Farmer Swimming 703568079
96 Suchen Ray Dalok M Farmer Swimming 967810226
27 Manikanta Ray Dalok M Farmer Swimming8 Akshay Ray Dalok M Farmer Swimming
ROLES & RESPOSNIBILITIES OF”EARLY WARNING TEAM”
BEFORE DISASTER DURING DISASTER AFTER DISASTER
Always keep information through radio, T.V, Gaonburha, Circle office.
Before monsoon organize mock drill within the community.
Organize meeting within the team and share about
Inform the community before time (72 hrs./48hrs/36hrs/24hrs/12hrs/ may be some minutes).
Team should have details list and idea about vulnerable families and ensure that
Keep contact and coordinate with local Govt. officials.
Inform Planning Team members to the status of the people and make list.
48
roles and responsibility of each member and dissemination strategy.
Check with the Govt. officials about authenticity of the news before warning dissemination.
Ensure different colour of flag, megaphone, battery,and equipments are ready.
every family needs to receive proper warning.
Inform the evacuation place and way to move.
Inform community about De-warning.
Continuous contact with local administration.
Trained people on EWS and meaning of showing different colour of flag, what should be done in different stages of warning?
Sensitize community on preparedness at least household level.
2. SEARCH & RESCUE TEAM:
Sl. No.
Name of Person
Habitation Gender (sex)
Occupation/Designation
Existing specific skill
Phone Number
1 Anil Roy Dalok M Farmer Swimming2 John Mercury
MarakBokdo M Farmer Swimming 986464751
03 Dhruva Roy Dalok M Farmer Swimming4 RakeshMomin Bokdo M Farmer Swimming 967874529
75 Bijen Roy Dalok M Farmer Swimming6 RomitaMarak Bokdo F Housewife Swimming7 Hemen Roy Dalok M Farmer Swimming8 Gedar Roy Dalok M Daily wage Swimming9 Raju Roy Dalok M Farmer Swimming10 Jayanta Roy Dalok M Farmer Swimming11 Roni Marak Bokdo F Housewife Swimming
ROLES & RESPOSNIBILITIES OF “SEARCH & RESCUE” TEAM
BEFORE DISASTER DURING DISASTER AFTER DISASTER Materials like 6’ -8’
bamboos 4 No., Aluminum Handi, rope, blankets, low cost life jackets to be ready.
Identify the safe place for evacuation.
Identify the most vulnerable household and people like old age, sick, pregnant mother, lactating mother, PWD etc.
Organize community meeting and inform people to be prepared with necessary food and medicines, documents,
Rescue/ evacuate the most vulnerable people and help them to reach the safe place.
Coordinate with First Aid team and provide necessary treatment.
Coordinate with nearest health Centre/ doctor for further treatment (if necessary).
Ensure the proper treatment provided to the sick persons.
Help them to return back to their home.
Help them for repairing work their shelter.
Make list of damage household.
Trained/ practice within team periodically.
49
assets for evacuation. Inform all boat owners in
the village to repair and keep ready for evacuation.
Coordinate with local administration.
Coordinate with Early warning groups.
3. FIRST AID & MEDICAL TEAM
Sl. No.
Name of Person Habitation Occupation/Designation
Existing specific skill
Phone Number
1 Anjana Roy (Nurse)
Dalok ANM Skill on paramedic 9401450437
2 Mallika Roy (Nurse)
Dalok ANM Skill on paramedic
3 Gyanendra Roy Dalok Lab Tech. Skill on paramedic 78966122564 Santanu Roy Dalok Skill on paramedic 88129176395 Anil Roy Dalok Ward Boy Skill on paramedic6 PresilaMarak Bokdo Trained Nurse Skill on paramedic7 Rita Roy Dalok ASHA Worker Skill on paramedic8 NivaBarua Dalok ASHA
SupervisorSkill on paramedic
9 Raymati Roy Dalok ASHA worker Skill on paramedic 957753674010 AnuSabitaSangma Bokdo Skill on paramedic
ROLES &RESPOSNIBILITIES: First-Aid members.
BEFORE DISASTER DURING DISASTER AFTER DISASTER List of sick person to be update & in
hand. List of pregnant women and EDD
should be in hand. List of lactating mother to be update
and in hand. Conduct a meeting in the community
and inform all the sick people to stock their necessary medicines.
Check properly the first-aid box – require medicines, ORS, Halogen tablets and other materials.
Check properly the expiry date of medicine.
Organize meeting within the team and define the roles and responsibility of each members.
Coordinate with local PHC and take necessary information and inform to keep ready materials like halogen tablets, O.R.S, bleaching powder and other medicines.
Ensure that sick people are reach in safe place.
Provide necessary first-aid treatment if necessary.
Contact with nearest PHC with next stage of treatment if necessary.
Coordinate with district health department for further assistance.
Help other team like WASH & shelter management team if necessary.
Organize health camp in the village with consultation of BHMO.
Follow-up treatment of sick people if necessary.
Mock drill within team members and also trained others on basic first-aid, ORS making at household level, water purification, basic hygiene like hand washing, etc.
50
4. SHELTER MANAGEMENT TEAM:
Sl. No.
Name of Person Habitation Sex Occupation/Designation
Existing specific skill
Phone Number
1 Jyotshna Ray Dalok M Ex-Army Swimming2 Baneswar Ray Dalok M Ex-Army Swimming 986403771
83 Phenden Marak Bokdo M Farmer Swimming4 Praneswar Ray Dalok M Farmer Swimming
ROLES & RESPOSNIBILITIES OF SHELTER MANAGEMENT TEAM
BEFORE DISASTER DURING DISASTER AFTER DISASTER
Identified the high raised areas for evacuation.
Keep ready temporary shelter materials.
Train more youths on shelter managements
Periodically check the tube- well for safe drinking water during crisis.
Keep ready halogen tablet well in advance for water purification.
Find a place outside the village where waste, debris can be dispose.
Organize periodical Mock drill and keep ready to face any challenges.
Vulnerable sections like old people, pregnant women, children, PWDs sick person should first preference to the temporary shelter.
Make separate place for male and female.
Identify 2 person {1 male & 1 female] inside the camp as leader.
Ensure temporary latrine should make one corner of the raise platform.
Keep space for cattle. Ensure everyone use safe
drinking water; if necessary halogen tablet need to be use.
Dispose the waste, debris in the identified place.
Encourage community to help them to clean their village.
More help to be given to the most vulnerable families.
Help the vulnerable families to set-up their shelter.
Ensure waste disposal done safely and outside the village.
Tube-well water need to be test once if the tube-well submerged during flood situation.
Inform Planning Team members and call for a meeting and share the condition of the no. shelter damage for pass the information to the block for Govt. assistance.
5. Water & Sanitation Team
Sl. No.
Name of Person
Habitation Sex
Occupation/Designation
Existing specific
skill
Phone Number
1 Rani Adhikary F AWW 8134812203
2 Promoda Ray F AWW3 Rumita Sarma Haldibari F AWW 98648600444 Kanchan Ray5 Hira Das
51
6 Pradip Ray M Teacher7 Pranjal Ray M Teacher8 EnwallyMarak F Head Mistress ( Bokdo L.P
School)9 Tutu Marak F Aanganwadi Worker
(Bokdo AWC)8014137506
ROLES & RESPOSNIBILITIES OF WATER & SANITATION TEAM
BEFORE DISASTER DURING DISASTER AFTER DISASTER To inspect shelter
place and household for ensuring safe water and proper sanitation.
To demonstrate the standard norms for the use of water purification materials.
To check any leakage of septic tank or pits in order to take appropriate measure for avoiding environmental contamination.
To co-ordinate with officials of PHE and Health department for controlling water born diseases.
The PHE Department will provide clean drinking water to the affected people wherever possible.
To facilitate collection and disposal of garbage, solid waste, drainage disposal.
6. Carcass Disposal Team
Sl. No.
Name of Person
Habitation Sex Occupation/Designation
Existing specific skill
Phone Number
1 Arup Ray M2 Bikash Ray M3 Bhadreswar
RayM
4 Rohini Ray F 9613365112
5 Pinish Ray M6 Akshay Ray M7 Sanjay Marak M8 Manseng Marak M9 Brazil Sangma M
ROLES & RESPOSNIBILITIES OF CARCASS DISPOSAL TEAM
BEFORE DISASTER DURING DISASTER AFTER DISASTER
52
For the purpose of carcass disposal advance rate fixation should be done with the involvement of all stake holders.
The Veterinary field officials along with the community will identify a suitable location of disposal of carcass
Community will be trained in proper handling of carcass by the Veterinary field personals.
To co-ordinate with Animal Husbandry and Veterinary Department for scientific disposal for carcass.
Ensure disposal of all carcasses in proper manner.
To dispose dead carcass at predefined areas with proper method.
To respect each religion for cremation of human dead bodies.
To protect the area demarcated for disposal from scavenging animal.
7. Damage Assessment Team
Sl. No.
Name of Person Habitation Sex Occupation/Designation
Existing specific skill
Phone Number
1 Hemen Ray M 9435875891
2 Naba Kumar Ray
M 9435323443
3 Dipankar Ray M 9854175380
4 Suschen Ray M 9678102262
5 Khiren Ray M 9854024366
6 MerendraSangma
M Retired Teacher 9435323414
7 Brilliants Marak M Gaonburah 7035680799
8 EnwallyMarak F Teacher
ROLES & RESPOSNIBILITIES OF DAMAGE ASSESSMENT TEAM
BEFORE DISASTER DURING DISASTER AFTER DISASTER To maintain a village
wise database of human resources and infrastructure alongwith their vulnerability status.
To collect sex wise, age wise information of affected community.
To collect accurate information of death cases both human and livestock. Similarly collection of information about the injured person is one of the major tasks for the team.
To use standard format for assessing damage of infrastructure and
Will facilitated detail field survey alongwith the Govt. officials and help accurate assessment of damage.
To facilitate collection of legal documents for NOKs who died during disaster.
53
agriculture crop on daily basis.
To inform the village level functionaries of Revenue Circle Office, Block Development Office PRI and other relevant line department about the status of damage on daily basis.
8. Relief & Co-Ordination Team
Sl. No.
Name of Person Habitation Sex Occupation/Designation
Existing specific skill
Phone Number
1 Hemen Ray M 9435875891
2 Naba Kumar Ray M 9435323443
3 Dipankar Ray M 9854175380
4 Suschen Ray M5 Khiren Ray M 985402436
66 Merendra Sangma M Retired Teacher7 Brilliants Marak M Gaonburah 703568079
98 Enwally Marak F Teacher
ROLES & RESPOSNIBILITIES OF RELIEF & CO-ORDINATION TEAM
BEFORE DISASTER DURING DISASTER AFTER DISASTER Be acquainted with the
relief manual and management of relief camps.
Mobilization of relief materials locally and from other agency
Ensuring specific food for pregnant, expectant, nursing mother and baby,
Ensuring quality of relief materials
Preparing correct list of eligible families for relief items.
Co-ordination with Govt. Agency and NGOs.
Ensure smooth distribution of relief materials to really needed people.
Take appropriate strategy in order to avoid chaos during relief distribution.
54
9. Patrolling Team
Sl. No.
Name of Person Habitation Sex Occupation/Designation
Existing specific skill
Phone Number
1 Prankolin Marak Haldibari M Ex-Army2 Praneswar Ray M 957744474
03 Arun Ray M 985900162
04 Fani ray M5 Sambharu Ray M 995427838
36 Maliram Sangma M Ex-Army (VDP
Nayak)9859413681
ROLES & RESPOSNIBILITIES OF PATROLLING TEAM
BEFORE DISASTER DURING DISASTER AFTER DISASTER Constitute teams for
patrolling of vulnerable areas
Disseminate information to the villagers through appropriate method
Provide support to the villagers
Assist Government in identification of material availability locally for construction of temporary sheds.
10. Awareness Generation Team
Sl. No.
Name of Person Habitation
Sex
Occupation/Designation
Existing specific
skill
Phone Number
1 Santanu Ray M 88129176392 Parameswar Ray M 9864307468/940141806
33 RuniMarak F4 IriliaSangma F5 SubhasSutradhar M Head Master6 Brilliants Marak M Gaonburah 70356807997 NabinNath M8 Hemen Ray M9 RelwingstonMomi
nM Teacher
10 Tutu Marak F 8014137506
ROLES & RESPOSNIBILITIES OF AWARENESS GENERATION TEAM
BEFORE DISASTER DURING DISASTER AFTER DISASTER Let the villagers know
about all the disasters and its do’s & Don’ts about
Help people to keep calm and help others in rescue and relief operations.
Let the people know about what to do after disaster and how to purify water and
55
disaster. Campaign will be made
village wide to let the people know in advance what to do and what not to do during any disaster.
maintain hygiene. Aware people about
measures to be taken to stop any epidemics and precautions in this regard.
CAPACITY BUILDING MEASURES
A. Building the capacity of team with awareness and training: To deliver the better service during emergency, it is required to impart training for the different team members. Accordingly a training plan is prepared as follows.
Sl. No.
Target group Type of training Duration of training
Schedule Remarks
1 Early warning team Network and linkage with IMD , WRD ,DEOC ,SEOC ,Source of information , Improvement of existing warning system , use of ICT
One day Quarterly. One compulsory just before monsoon.
2 Shelter Management Team
Identification of shelter place, repair –renovation –maintenance of shelter, linkage with line Dept. For ensuring basic needs of shelter , special care for pregnant mother and adolescent girl, ensuring separate toilet and accommodation facilities for girls and boys. Special care to physically challenged people, arrangement of fuel and light, ensuring stock of food and non-
Two days Half yearly. One before monsoon and another after monsoon.
56
food item3 Search and Rescue Various methods
of Search and Rescue including water rescue, Periodic mock drills.
Three days Every two months interval
4 First Aid and Medical team
Basic course on First Aid , Dos and Don’ts of different hazard , Mass casualty management
Three days Quarterly
5 Water and Sanitation team
Water purification method during emergency , excreta disposal , vector control , garbage disposal
Two days Quarterly
6 Damage Assessment team
Linkage with PRI , Revenue Circle ,Development Block and other line Department , use of format , Collection of information , compilation of information ,Submission to concerned authority and follow up
One Day Half Yearly.One before monsoon is mandatory.
7 Relief and Co-ordination team
Collection of relief materials, Ensuring specific food for pregnant, expectant, nursing mother and baby, ensuring quality of relief materials, Co-ordination with Govt. Agency and NGOs.
One Day Half Yearly.One before monsoon is mandatory.
8 Carcass disposal team Method of carcass disposal , Linkage with line Department
One day Half Yearly.One before monsoon is mandatory
57
Awareness Generation and Dissemination plan: Mass awareness generation through meeting and consultation can be carried out through existing local and religious institutions .Similarly distribution of leaflet, pamphlet, and banner may be carried out in local festivals. Wall writing in specific location may be carried out.
B. Strengthening of existing shelter place : People living in northern part of the villages, usually move to Lalipahar to take shelter. Lalipahar is a small hillock located in the middle of the village. There is a temple in the Lalipahar and a shade which can accommodate about 50 people. But there is enough space to accommodate about 200 people. No drinking water and sanitation facilities. It is needed to have a shade along with drinking water and sanitation facilities before flood season. There is another hillock called Lakhinder Pahar. People use this place for sheltering their livestock during flood. This place is also required to have shade and drinking water facilities for livestock.
C. Making availability of Country boat and Machine boats : There is an urgent need to deploy two nos. of boat in the village. Community feels that there should be at least two nos. of boats (machine boat or country boats) in the village during the time of monsoon. One should be placed on the northern part and another should be placed on the southern part.
D. Improving the Existing Early Warning System : There is an urgent need to improve the existing warning system. The existing warning system (striking on hollow iron electric pole) may cause accident to the user. Availability of mega phone and installation of bell at prominent places may improve the existing warning system. Similarly flow of real-time information of rainfall from Meghalaya may improve existing warning system.
E. Making availability of minimum Health care facilities : The village does not have any health institution. The nearest health institution is located one KM away from the village. Hence there is need to stock sufficient First-Aid Kits for the First-Aid and medical team in order to provide minimum health care facilities during emergency.
F. Pre-stocking of Water purification materials : The village has major problem of high iron content in the available ground water. There is an urgent need to keep ready with native filtration system along with bleaching powder, halogen tablet and other water purification materials for the water and sanitation team.
PROVISION OF FAMILY DISASTER PREPAREDNESS KIT:
As a measure of preparedness it is expected that each family of the village will keep a Disaster Preparedness Kit/Emergency preparedness kit. The Emergency preparedness kit will contain the following items which may be used in a situation like disaster.
I. Torchlight with Batteries.
58
II. First Aid Kit (Antiseptic, Bandage, Sanitary Napkin, Cotton Bandage, ORS packets Etc.)
III. Non-perishable Dry fruit, canned baby food, Ready-to-eat like Chira, Pithaguri, Boot-Chattu, etc. sufficient for at least three days.
IV. Screw driver/ Electric Tester, Hammer, Whistle, Nylon Rope, Cutter/ Small knife etc.
V. Water Bottle.VI. Matchbox / lighter and candles
VII. Essential emergency medicines. Prescription medicines if needed by any family member
VIII. Spare eye-glassesIX. One set of cloths for each memberX. Soaps and personal sanitary items for health & hygiene.
XI. Xerox copy of important documents in a plastic pouchXII. Important Phone Nos. viz. police station, hospital, Circle Officer, BDO, etc.
XIII. Utensils (Plates – 2, Glasses -2, Food Bowls – 2, etc.)XIV. Polythene sheet (6 ft. x 6 ft. – 2 sets)XV. Blankets (one or two) in winter season
XVI. Other essential items. Etc.
Note:
All these items may be kept in a 15 litres covered bucket / container which may be used for carrying / storing water. All the family members should be aware of this
Emergency Kit items should be checked / changed at appropriate intervals
MITIGATION PLAN:
The community feels that the following mitigation measure should be undertaken in order to reduce the impact of flash flood, erosion and other disasters.
Replacement of existing wooden bridge with RCC Bridge. Redesign of railway track. According to the community, Hume pipe of railway track
located around 10 to 12 K.M away from the village at Thailapara; Dhaigaon of Krishnai area should be replaced by RCC Bridge for easy passage of large water volume.
Dredging of river Jinjiram from Derek to Deulijira for facilitating de-siltation. Channels of two wetland known as Thakurbilla beel and Rourang beel in the western
part should immediately be opened. Digging and cleaning of silt at the narrow passage between the two hillocks at Rongsai
in western direction. Construction of 500 meter dyke in the eastern part of the river Jinjiram.
59
Boulder pitching from the existing wooden bridge on each side of the river Jinjiram up to 500 meter in western direction.
Construction of community hall for around 200 people capacity at LaliPahar and Paharkata along with drinking water and sanitation facilities.
Collection and treatment of water from stream originating from nearest Ajagar Pahar and Satboini Pahar and distribution of the same through pipe water supply schemes in order to ensure iron free water. A Water tank may be built at a high place for storing the spring water and using the gradient a viable pipe water distribution system may be built.
Provision of Community Disaster Contingency Fund
During discussion with the village community it has been found that after any disaster it leads to an urgent need of financial help or other resources at the community level before the intervention from the administration starts. In order to enhance the community resilience and disaster risk reduction activities there should be a provision of community contingency fund. This fund will help to organize immediate relief and rescue measures to the most vulnerable people in the village and other households who are most affected in rehabilitation. The contingency fund will be created with personal contribution from each household of the village; a bank account will be maintained by the VLMCC members of the village. The fund, if unused in any emergency situation can also be utilized in other developmental work of the village.
Creation of Community Grain bank
As a part of long term mitigation measures the community of the village had the opinion that there should be a provision of community grain bank which will be maintain by the VLMCC members. The grain bank will be a common granary for the staple food grain for meting up the need of emergency food requirement for the poor and deprived villagers during any disastrous situation like flood or any emergency when they are deprived of food etc. This grain bank will be created by voluntary contribution of food grains from each household with respect to amount of land holding and yield. For this purpose a community granary will be maintained at a safe common location in the village which is raised above the common flood level of water in the recent floods. The grains, if unused in any emergency situation for almost a year may be sold in the next year as food grain in the market or as subsidized seed to the village farmers and the money thus earn may be kept in the bank account of the community Disaster Contingency Fund or may be directly used for the development of the villagers.
Updating the Village Disaster Management Plan:
Time/date of updation Process Responsible person
January VLMCC meeting will be held regarding Chairperson and President
60
updation of village DM Plan and suggestions will be taken from the concerned deptts. and villagers
On-Desk Review of the Plan for any update
The New data will be included in the Plan and the Plan will be newly drafted.
A meeting will be called with all the VLMCC members and other villagers and the new plan will be shared and will be approved.
of VLMCC
IMPORTANT CONTACT NOS FOR THE VILLAGE :
1. Agia BPHC: Dr. M. Ali, SDM& HO, 98543-78649
2. SDRF Goalpara unit: Mr. Babool Das, Sq. Commander, SDRF, 99542-45686
3. Agia Police Station: Mr. Robin Roy, OC, Agia PS, 94352-59161
4. Balijana Revenue Circle Office: Mr. D.K .Chaudhury, CO, Balijana, 94350-22453
61
5. Balijana Development Block Office: Mr. Abdul Mazid, BDO, Balijana, 94350-24280
6. DEOC, Goalpara: 03663-243043/ 1077
7. IMD Meghalaya:
8. Water Resource Department: WRD Control Room, 03663-240029
9. Agriculture Department: Mr. A.C. Karmakar, DAO, Goalpara, 9854338572
10. State Veterinary Dispensary, Agia: Dr. D. Adhikari, DVO, Goalpara, 98591-01550
LIST OF DEPARTMENTS TO SUPPORT IN IMPLEMENTING THE PLAN
Sl. No. Name of the Department Responsible Person Contact No.1. District Disaster
Management AuthorityC.E.O., DDMA & DPO, DDMA 03663243043
1077 (Toll Free)2. Panchayat & Rural
DevelopmentC.E.O. Zila Parishad &PD, DRDA
9435035940 (CEO, Zila Parishad)9435022082 (PD,
DRDA)BDO, Balijana 9435024280
4. Health Joint Director Health Service 94351833355. PHE EE, PHE 98640355166. Revenue Circle Officer, Balijana Rev.
Circle9435022453
7. Agriculture District Agricultural Officer 98543385728. PWD (RR) AEE, PWD (RR) 97070210499. Social Welfare DSWO, Goalpara 943540243410. Forest DFO, Social Forestry 943540244811. Fishery DFDO, Goalpara 825384479412. A.H. & Vety. DVO, Goalpara 9859101550
Map of Village Dalok
62
63
64
Annexure-1
List of Family Details:
Demographic Profile of DALOK Village
Sl.No.
Head of the Family
Below 1 year
1-3 Years
3-6 Years
6 to 10 Years
10 to 60
Years
Above 60
Years
Total Populati
on
APL BPL
House Type Own Medium of Transport
Occupation Telephone
Land holdin
g
M F M F M F M F M F M F RCC
Asaam
TypeIAY Mud/Kutcha/
HutCycl
e
Motor Cycle/Scooter/Sc
ootyCar Tempo/Auto/
Power TillerThel
a
1 Pilarson Sangma
- - - - - - - - 2 2 - - 4 APL 1 1 Labour 9508211972 2 Bigha
2 Perila Marak - - - - - - - - 1 2 1 - 4 BPL 1 1 Farmer 4 Bigha
3 Merendra Sangma
- - 1 - - - - - 4 2 1 - 8 APL 1 1 3 1 Pensioner
9435323414 16 Bigha
4 Rakesh Momin
- - - - - - - 1 1 1 - - 3 APL 1 1 Labour 9678745297 2 Bigha
5 Jejuice Marak
- - - - 1 1 2 1 1 2 - - 8 APL 1 1 Labour 2 Bigha
6 Arsoni Marak
- - - - - - - - - - - 1 1 BPL 1 Labour 2 Bigha
7 Jogeshwar Marak
- - - - 1 - - - 1 1 - - 3 BPL 1 1 Labour 8761862964 1/2
Bigha8 Thilnet
Sangma- - - - - - - - 1 2 - - 3 BPL 1 1 Labour 95779159930 11/2
Bigha9 Prodeep Das - - - 1 - - - - 1 1 - - 3 APL 1 1 1 Govt.Te
acher9864571766 3 Bigha
10 Pabitra Das - - - 1 - - 1 - 1 1 - - 4 BPL 1 1 1 Businesmen
9435023885 6 Bigha
11 Pohari Singha
- - - - - - - - - 2 - - 2 APL 1 1 Pensioner
9531012438 1/2
Bigha12 Jiten Ch Rai 1 - - - - - - - 1 4 1 - 7 APL 1 1 1 Pension
er9854422486 1/2
Bigha13 Jogesh Das - - - - - - - - 1 1 1 - 3 APL 1 1 1 Business 6 Bigha
14 Aloka Rai - - - - - 1 - - - 2 - 1 4 BPL 1 Labour 1/2
Bigha15 Bipul Rai - - - - - - 1 - 2 1 - - 4 APL 1 1 Labour 8133018473
16 Chandan Rai - - - 1 - - - - 1 1 - 1 4 APL 2 1 Labour
17 Rubul Rai 1 - - - - - - - 1 1 - 1 4 APL 1 1 Business 9859044279 2 Bigha
18 Sanjib Rai - - 1 - - - - - 1 1 - - 3 APL 1 1 Business 9508984546
19 Dhiraj Rai - - - - - - - - 2 4 - - 6 APL 2 1 Business 9854006367
20 Suren Ch. Rai
- - - - - - - - 2 4 - - 6 APL 2 1 Business 9678102262
21 Kamini Rai - - - - - - - - 3 1 - - 4 APL 1 Labour
22 Bhabesh Rai - - - - - - - - 2 - 1 - 3 APL 1 Labour
23 Bhodrabati Rai
- - - - - - - - 2 3 - - 5 BPL 713
2
1 1 Labour 8822489166
24 Daibaki Rai 1 - - - - - - - 1 3 - - 5 APL 1 Labour 9707627834
25 Basudev Rai - - - - - - 1 - 2 1 - 1 5 APL 1 1 Labour 9706910744 5 Bigha
26 Rabendra Ch. Rai
- - - - 1 - - - 1 1 - - 3 APL 1 1 Labour 8474009020
27 Thineswar Rai
- - - - - - - - 4 1 - 1 6 APL 2 1 Labour 8761083185
28 Bireswar Rai - - - - - - - - 1 2 - - 3 APL 1 1 Labour 8472011461 1 Bigha
29 Bahar Rai - - - - - - - - 2 2 - - 4 APL 4 Labour 9508080988
30 Rabin Barman
- - - - - - - - 1 3 - - 4 APL 1 1 1 Businessman
9854066916 2 Bigha
31 Abinash Rai - - - 1 - - - - 2 3 - - 6 BPL 1 2 1 Businessman
9954841888 11/2
Bigha32 Dharani
Dhar Rai- - - - - - 1 - 1 2 - - 4 APL 1 2 Farmer 9954841888 2 Bigha
33 Harkanta Rai - - - - - - - - 2 3 - - 5 APL 1 2 1 Service 9854445308 31/2
Bigha34 Soneswar
Rai- - - - - - 1 - 2 1 - - 4 APL 1 1 1 Business
man9854702021 2 Bigha
66
35 Sambaru Rai - - - 1 - - - - 3 2 - - 6 BPL 1 Labour 9954278383 8 Bigha
36 Jagadish Rai - - 1 - - - - - 3 2 1 - 7 APL 1 1 1 Pensioner
9859652 8 Bigha
37 Hemen Rai - - - - - - - - 3 1 - - 4 APL 1 1 Labour 1 Bigha
38 Khirod Mohan Rai
- - - 1 - 1 - - 1 3 1 - 7 APL 1 1 1 1 Businessman
9864768175 1Bigha
39 Dhurba Lachan Barman
- - - - - - - - 1 1 - - 2 BPL 1 1 Farmer 9706801564 11/2
Bigha
40 Gabardhan Rai
- - - 2 - - - - 3 4 1 - 10 BPL 1 1 Farmer 8253868949 21/2
Bigha41 Khanindra
Rai- - - - 1 - - - 1 1 - - 3 BPL 1 1 Pvt.
Worker9401313256
42 Pradip Rai - - - - - - - 1 2 1 - - 4 APL 1 1 1 Service 1 Bigha
43 Minati Rai - - - - - - - - - 2 - - 2 BPL 1 1 Farmer 8822582957 2 Bigha
44 Jatil Rai - - - - - 1 - - 2 1 - 1 5 APL 1 2 1 Farmer 7 Bigha
45 Ranjit Rai - - - - - - - - 2 2 - - 4 BPL 1 1 Labour 11/2
Bigha46 Bhadreswar
Rai- - - - - - 1 - 2 1 - - 4 BPL 1 Labour 1
Khatha47 Doiboki Rai - - - - - - - - 2 1 - - 3 APL 1 3 Business
man9854518216 2 Bigha
48 Ajit Kr. Rai - - - - - - 1 - 1 1 - - 3 BPL 1 1 Businessman
7896355360 1 Bigha
49 Satish Rai - - - - - - - - 2 1 - - 3 BPL 1 1 Businessman
1/2
Bigha50 Robin Rai - - - - - - - - 1 1 1 - 3 BPL 1 1 Business
man
1/2
Bigha51 Chiran Ch.
Rai- - 1 - - - - - 1 3 1 - 6 APL 1 1 1 Business
man9435232266 11/2
Bigha52 Gopi Mohan
Rai- - - - - 1 - - 1 1 - - 3 APL 1 1 Business
man8822054916 1/2
Bigha53 Bokul Rai - - - - - 1 - - 3 - 1 5 APL 1 1 1 Business
man985412483 2Bigha
54 Binoy Rai - - - - - - - - 1 1 - - 2 APL 1 Farmer 1 Bigha
55 Amulya Rai - - - - - - - - 4 2 - - 6 BPL 1 2 1 Farmer 8254968823 5 Bigha
56 Keteri Bala Rai
- - - - - - - - - 2 - 1 3 APL 1 Labour Do 1/2
Bigha57 Malindra Rai - - - - - - - - - 2 1 - 3 APL 1 Labour 8134099572 1/2
Bigha58 Padmalacha - - - - 1 - - 1 1 1 - - 4 APL 1 Labour 8473002114 1/2
67
n Rai Bigha59 Moti Bala
Rai- - - - - - - 1 1 3 - - 5 APL 1 Farmer 2 Bigha
60 Renuka Rai - - - - - - - - 1 2 - - 3 APL 1 2 Pensioner
9706649718 2 Bigha
61 Bijoy Rai - - - - 1 - 1 - 1 1 - - 4 APL 1 1 1 Farmer 4 Bigha
62 Ajay Rai - - - 1 - - - - 1 1 - - 3 APL 1 1 Farmer 3 Bigha
63 Akshay Rai - - - - - - - 1 1 1 - 1 4 APL 1 1 Farmer 2 Bigha
64 Pranay Rai - - - - - - - 2 1 1 - - 4 BPL 1 Labour 2 Bigha
65 Mukul Rai - - 1 - 1 - - 1 2 2 - 1 8 APL 1 1 Bussiness
9854422351 3 Bigha
66 Rohini Kr. Rai
- - - - 1 - 1 - 1 1 - - 4 APL 1 1 Labour 9613365112 11/2
Bigha67 Dipak Rai - - - - - - 1 - 1 2 - 1 5 APL 1 2 Business 9864398875 5 Bigha
68 Prabal Rai - - - - - - - - 2 1 1 - 4 APL 1 1 2 Pensioner
7399499579 5 Bigha
69 Sobita Rai - - - - - - - - 2 1 - 1 4 APL 1 1 1 Bussiness
9854175377 6 Bigha
70 Hemendra Rai
- - - - - - - - 2 1 - 3 APL 1 2 1 Pensioner
9435875891 8 Bigha
71 Boloram Rai - - - - - - - - 1 4 - - 5 APL 1 2 1 Service 9435232302 8 Bigha
72 Gilen Marak - - 1 - - - 1 - 2 1 - - 5 APL 1 1 Labour 8822582839 7 Bigha
73 John Marcury Marak
- - - - - - - - 3 2 - - 5 BPL 1 1 Farmer 9864647510 6 Bigha
74 Jarna Das - 1 - - - - - - 1 2 - - 4 BPL 1 Labour 8135969360 1 Bigha
75 Pupu Marak - - - 1 1 - - - 1 1 - - 4 APL 1 1 Labour 1 Bigha
76 Maliram Sangma
- - - - 1 - - - 1 2 - - 4 APL 1 2 Service 9859413681 5 Bigha
77 Thaneswar Rai
- - - - - - - - 3 2 - - 5 BPL 1 1 1 Businessman
9854465464 2 Bigha
78 Nanigopal Rai
- - - - - - - - 1 3 - 1 5 APL 1 1 1 Service 9864647967
79 Rohini Kr. Rai
- - - - - - - - 1 2 - - 3 BPL 1 1 Driver 9954179744 4 Bigha
80 Sibaji Barman
- - - - - - - - 1 2 1 - 4 APL 1 1 1 Pensioner
9435148533 7 Bigha
81 Prabin Ch. Deka
- - - - - - - - 3 1 - - 4 APL 1 1 1 Service 9957413495 3 Katha
82 John - - - - - - - - 3 2 - - 5 BPL 1 1 1 Farmer 3 Bigha
68
Marcury Marak
83 Willip Marak - - - - - - - - 3 3 1 - 7 APL 1 1 1 Farmer 8011869573 5 Bigha
84 Greatwill Marak
- - 1 - - - - - 1 1 - - 3 BPL 1 Farmer 7035853963 3 Bigha
85 Withson Marak
- - - - - - - - 3 2 - - 5 BPL 1 1 Farmer 9577762129 3 Bigha
86 Dilip Rai - - - - - - - 1 2 3 - 1 7 BPL 1 1 Labour 9577741039
87 Nripen Das - - - - - - - - - 4 - 1 5 BPL 1 1 Service 8134812262
88 Bhupen Barman
- - 1 - 1 - - 1 1 1 1 - 6 APL 1 1 1 Service 9436331481
89 Dhareswar Rai
- - 1 - - - - - 1 1 - - 3 APL 1 1 Service 9613063656
90 Atul Rai - - - - - - - - 1 2 1 - 4 APL 1 1 1 Business 8822081019
91 Prafulla Rai - - - - - - - - 2 1 1 - 4 BPL 1 1 Business 9854992867
92 Pratap Rai - - - - 1 - - - 1 1 - - 3 BPL 1 Farmer 7896428921
93 Gobinda Rai - - - - - - - - 1 3 1 - 5 APL 1 2 Farmer 9859680316 5 Bigha
94 Bimal Ch. Rai - - - - - - - - 1 2 - 1 4 APL 1 1 Service 9854513227 10 Bigha
95 Ajoy Kr. Rai - - - - - - - 1 1 1 - - 3 APL 1 1 1 1 Service 9854050332 10 Bigha
96 Jhotsna Kr. Rai
- - - - - - - - 1 2 - - 3 APL 1 1 1 Pensioner
9435875988 6 Bigha
97 Baneswar Rai
- - - - 1 - - - 2 2 1 - 6 APL 1 1 1 Pensioner
9678966877 4 Bigha
98 Girin Rai - - - - - - - - 3 1 - - 4 APL 1 2 Farmer 9678124748 2 Bigha
99 Gojen Rai - - - - - - - 1 2 2 1 1 7 APL 1 1 Farmer 9864998658 10 Bigha
100 Suresh Rai - - - 1 - - - 1 3 2 1 1 9 APL 1 2 2 Pensioner
9577740969 21/2 Bigha
101 Kshiren Ch. Nath
- - - - - - - - 2 1 1 - 4 APL 1 1 3 Service 9854024366 4 Bigha
102 NaRaian Rai - - - - - - - - 3 1 - - 4 APL 1 1 Farmer 5859802376 4 Bigha
103 Kosholya Rai - 1 - - - - - 1 3 3 - 1 9 APL 1 1 Farmer 8761060652 4 Bigha
104 Arun Rai - - - - - - 1 - 1 2 - - 4 BPL 1 1 Farmer 9859001620 2 Bigha
105 Moni Kanta Rai
- - - - - - - - 2 1 - - 3 BPL 1 Farmer 8721026331 2 Bigha
106 Hiteswar Rai - - - - 1 - - 1 5 1 1 - 9 BPL 1 Labour
69
107 Dinesh Rai - - - - - - - - 1 1 - - 2 BPL 1 Labour
108 Hriday Rai - - - - - - - - 1 3 - - 4 BPL 1 1 Labour 7896425776 1 Bigha
109 Dilip Rai - 1 - - - - 1 - 1 1 - - 4 BPL 1 1 Labour 8473002769 1/2
Bigha110 Nakul Rai - - - - - - - 1 1 1 - - 3 APL 1 1 1 Business 9957092373 4 Bigha
111 Rani Adhikari
- - - - - - - - 1 1 - - 2 BPL 1 1 Farmer 9859907271 4 Bigha
112 Tarun Rai - - - - - - 1 - 2 1 - - 4 APL 1 1 Service 9854880680 4 Bigha
113 Pabitra Rai - - - - - - 1 - 3 1 - - 5 BPL 1 1 1 Business 8135968364 4 Bigha
114 Parmeswar Rai
- - - - - - - - 1 1 - - 2 APL 1 Business 9864307468 4 Bigha
115 Tipen Ch. Rai - - - - - - - - 3 1 - - 4 APL 1 2 1 Pensioner
8133874100 25 Bigha
116 Supen Rai - - - - - - - - - - 1 1 2 APL 1 Business 3 Bigha
117 Krethnila Sangma
- - - - - - - 1 - 3 - - 4 APL 1 1 Pensioner
7399680029 2 Bigha
118 Cleber Momin
- - - - 1 - - 1 4 2 - - 8 APL 1 5 Mistri 8134099353 2 Bigha
119 Relwingston Momin
- - - - - - 1 - 1 3 1 - 6 APL 1 2 Teacher 9859126138 1Bigha
120 Gaderson Marak
- - - - - 1 - 1 5 3 - - 10 BPL 1 1 Labour 8256823058 1Bigha
121 Kornenson Marak
- - - - - - - - 3 2 - - 5 BPL 1 1 Labour 8753868873 2Bigha
122 Bulat Marak - 1 - - - - - - 1 1 - - 3 APL 1 Labour 1/2
Bigha123 Clement
Marak- - 1 1 - - - - 1 1 - - 4 APL 1 Labour 8575418940 1/2
Bigha124 Simvlem
Marak- - - - - - - - 3 3 - - 6 APL 1 1 1 Govt.Te
acher8822470025 21/2
Bigha125 Berson
Momin- - - - - - - - 2 4 - - 6 BPL 1 1 Labour 8134903111 11/2
Bigha126 Mithla
Marak- - - - - - - - 1 3 1 - 5 BPL 1 1 Farmer 8876208247 5 Bigha
127 Pilarson Sangma
- - - - - - - - 2 2 - - 4 APL 1 1 Labour 9508211972 2 Bigha
128 Birendra Ch. Rai
- - - - - - - - 3 1 - - 4 BPL 1 1 1 Labour 9577767061
129 Nilima Rai - - - - - - - - - 1 1 APL 1 1 Labour
130 Paresh Ch. Rai
- - 1 - 1 - - - 4 2 - 8 APL 1 1 1 Service 8134812446
70
131 Sachindra Rai
- - - - - - - - 2 1 - - 3 BPL 3 1 Labour 8753868865 1.5 Bigha
132 Maya Rai - - - - - - - - 3 2 1 - 6 APL 3 1 Labour 9859838192 3 Bigha
133 Atul Rai - - - 1 - - - 1 1 3 - - 6 APL 1 1 Labour 8133874087 1 Bigha
134 Pratul Rai - - - - - - - - 2 1 - - 3 APL 2 1 Labour 4 Bigha
135 Bishnu Rai - - - - 1 - - 1 1 1 - - 4 APL 1 1 Labour
136 Nilo Rai - - - - - - - - 2 1 - - 3 APL 1 1 Labour
137 Naba Kr. Rai - - - - - - - - 2 2 - - 4 APL 2 1 1 Pensioner
9435323443 4 Bigha
138 Bhupal Ch. Rai
- - - - - - - - 2 2 - - 4 APL 1 1 Cultivator
9859381276 3 Bigha
139 Dipika Rai - - - - - - - - 2 1 - - 3 APL 1 2 Pensioner
9859957431 9 Bigha
140 Jintu Rai - - - - - - - - 2 2 - - 4 APL 1 1 Service 9613120978 2 Bigha
141 Tilok Rai - - - - - - 1 - 1 1 - 1 4 APL 2 1 Labour 9854109143 1 Bigha
142 Parimal Rai - - - - - - 1 - 2 1 - 1 5 APL 1 1 Labour 9854448935
143 Maimonsing Marak
- - - - - - - - 2 1 1 1 5 BPL 1 1 1 Service 967837918 2 Bigha
144 Plinther Momin
- - - - - 1 1 1 3 1 - - 7 APL 1 2 Farmer 8134099620 15 Bigha
145 Letmison Marak
- - - - - - - - 1 2 - - 3 APL 1 1 Farmer 9577144061 8 Bigha
146 Salnet Sangma
- - - - - - 1 - 1 2 - - 4 APL 1 2 1 Labour 9678966572 12 Bigha
147 Winbat Marak
- - 1 - 1 - 1 1 1 1 - 1 7 APL 1 1 Labour 2 Bigha
148 Lewina Sngma
- - 1 - - - - - 2 2 - - 5 APL 1 1 Labour 2 Bigha
149 Jendenson Momin
- - - - - - - 2 1 2 - - 5 APL 1 1 Labour 7399498981 4 Bigha
150 Promo Marak
- - - - - 1 1 - 2 1 - - 5 APL 1 1 Farmer 9401646296 6 Bigha
151 Jeting Sangma
1 - - - - - - - 4 2 - - 7 APL 1 1 Labour 1 Bigha
152 Jetin Marak - 1 - - - - 1 1 1 1 - - 5 APL 1 Labour 31/2
Bigha153 Epson Marak - - - 1 - - - - 1 1 1 - 4 APL 1 2 Labour 1 Bigha
154 Lilik Marak - - - - - - - - 1 2 - - 3 APL 1 Labour 8811917176 1/2
Bigha155 Clebirth
Sangma- - - - - - - - 1 1 - - 2 APL 1 Labour 9859435451 2 Bigha
71
156 Latus Sangma
- - 1 - - - - 1 1 1 - - 4 APL 1 1 Driver 8761863049 1 Bigha
157 Mital Marak - - - - - - 1 - 3 2 - - 6 APL 1 2 Labour 9677718702 4 Bigha
158 Sohasini Sangma
- - - - - - - - 1 - 1 2 APL 1 Service 9859839281 9 Bigha
159 Starson Marak
1 - - 1 - - - - 4 1 - - 7 BPL 1 1 Labour 2 Bigha
160 Gretingson Marak
- - - - - - - - 3 4 - - 7 APL 1 Labour 9613625895 2 Bigha
161 Dijendra Ch. Rai
- - - - - - 1 - 1 1 - - 3 BPL 1 1 Service 8415856808 1 Bigha
162 Kunja Mohan Rai
- - - - - - - - - 1 1 2 BPL 1 Farmer 7 Bigha
163 Topon Rai - - 1 - - - - 1 1 1 - - 4 BPL 1 1 Businessman
8011943522 1 Bigha
164 Karen Rai - - - - - - - - 2 2 - - 4 BPL 1 1 1 Labour 8471815239 1 Bigha
165 Rathindra Ch. Rai
- - - 1 - - - - 2 3 - - 6 APL 1 1 Service 9854565598 10 Bigha
166 Ramen Rai - - - - - - - - 2 2 - 1 5 APL 1 Farmer 9577365004 13 Bigha
167 Gautam Rai - - - - - - - 1 2 2 - - 5 BPL 1 1 Labour 8471815247 1 Bigha
168 Subal Ch. Rai - - - - - - - 1 3 - - 4 APL 1 2 Farmer 7 Bigha
169 Nitai Rai - - - - - - - - 3 1 - - 4 APL 1 2 1 Farmer 6 Bigha
170 Horeswari Rai
- - - - - - - - 3 - 1 4 BPL 1 1 Farmer 7086252025 2 Bigha
171 Baikuntha Rai
- - - - - - - - 2 2 - - 4 BPL 1 1 Labour 9859756504 2 Bigha
172 Bimal Rai - - - - - - - - 3 2 - - 5 BPL 1 2 Farmer 7896552911 2 Bigha
173 Khargeswar Rai
- - - - - - - - 1 1 - - 2 BPL 1 1 Labour 9954384985 11/2
Bigha174 Jogen Rai - - - - - - - - 2 - - 2 BPL 1 1 Labour 9954384985 1 Bigha
175 Kanai Rai - - - - - - - - 4 2 - - 6 BPL 1 1 1 1 Farmer 8253823691 3 Bigha
176 Dipankar Rai - - - - - - - - 2 2 - - 4 APL 1 1 1 1 Service 9854175380 5 Bigha
177 Sanjeev Rai - - - 1 - - - - 1 1 - - 3 APL 1 1 Business 9854473956 4 Bigha
178 Netromoni Rai
- - - - 1 - - - 1 1 - - 3 APL 1 1 1 Business 9854143284 1/2
Bigha179 Laba Rai - - - - - - 2 - 1 1 - - 4 BPL 1 1 Labour 8761060793 1 Bigha
180 Praneswar Rai
1 - - - - - 1 1 3 2 - 1 9 APL 1 1 Farmer 9577444740 6 Bigha
181 Haranath Rai - 1 - - - - - 1 1 1 - - 4 BPL 1 1 Labour 9859524736 1 Bigha
72
182 Madan Rai - - - - - - - - 2 2 - - 4 BPL 1 1 Labour 9864288012 1 Bigha
183 Dhruba Rai - - - - - - 1 - 2 2 - 1 6 APL 1 1 1 Farmer 8761862900 2 Bigha
184 Kushal Rai - - - - - 1 - - 1 1 - - 3 APL 1 Labour 9577076135 1 Bigha
185 Anil Kr. Rai - - - - - - - - 3 2 - 1 6 BPL 1 2 Farmer 9864782617 8 Bigha
186 Nalita Rai - - - - - - - - - 2 - - 2 BPL 1 Labour 9954034041 21/2
Bigha187 Kamala Rai - - - - - - - - - 1 - - 1 BPL 1 Labour 9954034041 1
Katha188 Dijen Rai - - - - - - - - 2 2 1 - 5 BPL 1 2 Farmer 9954034041 2 Bigha
189 Bipromohon Rai
- - - - - - - - 4 2 - - 6 APL 1 1 1 Service 9954693947 1/2
Bigha190 Pramada Rai - - - - - - - 1 1 2 - - 4 BPL 1 1 Labour 9613123025 1
Katha191 Mintu Rai - - - 1 - - - 1 1 1 - - 4 APL 1 1 Labour 8761895415 1
Katha192 Brajen Rai - - - - - - - - 2 1 - - 3 APL 1 2 Labour 9954692612 1
Katha193 Kanchan Rai - - - - - - - - 1 2 - - 3 BPL 1 2 Farmer 7086468614 2 Bigha
194 Bipul Rai - - 1 - - - - - 3 2 - - 6 BPL 1 1 Farmer 8811824627 1 Bigha
195 Waiston Marak
- - - - - - - 1 5 2 - - 8 BPL 1 2 1 Farmer 8486798456 8 Bigha
196 Kalingston Marak
- - - 1 2 - - 1 1 2 - - 7 BPL 1 1 1 Labour
197 Tribilson Marak
- - - - - - 2 - 1 1 - - 4 BPL 1 1 1 Labour 9707519898
198 Grebalin Marak
- - - - - - - - - 3 - - 3 BPL 1 Labour 8472848388
199 Lewitson sangma
- - 1 - - - - - 2 3 - 6 BPL 1 1 Labour 8752857444
200 Dingwen Sangma
- - - - - - 1 - 3 4 - - 8 APL 1 1 Teacher 9577899748 1.5 Bigha
201 Grenolish Marak
- - - - - - - - 3 1 - - 4 BPL 1 Farmer 9856518241 4 Bigha
202 Bearson Momin
- - - - - - - - 4 2 - - 6 BPL 1 1 Farmer 8822371875 4 Bigha
203 Latif Thakuria
- - - - - - 2 - 2 2 1 - 7 APL 1 1 1 1 Service 7896836282 8 Bigha
204 Webster Sangma
- - - - - - - - 2 3 - - 5 BPL 1 2 Labour 9859006157
205 Krepston Marak
- - - - - - - 2 1 1 - - 4 BPL 1 1 Farmer 9854126003 2 Bigha
206 Brelliants Marak
- - - - 1 - 1 - 2 2 - - 6 APL 1 1 1 Farmer 3 Bigha
73
207 Johncaner sangma
- - - - - - - 1 1 1 - - 3 APL 1 1 1 Farmer 9859126139 3 Bigha
208 Debatson Marak
- - - - 1 - 1 - 2 3 - - 7 BPL 1 1 Farmer 2 Bigha
209 Telwen Sangma
- - 1 - - - - 1 2 2 - - 6 BPL 1 1 Farmer 3 Bigha
210 Willip Marak - - - - - - - - 3 3 1 - 7 APL 1 1 1 Farmer 8011869573 5 Bigha
211 Warprinson Marak
- - 1 - - - - - 2 2 - - 5 BPL 1 1 Farmer 9577915899 2 Bigha
212 Gresilda Marak
- - - 2 - - - - 2 1 - - 5 BPL 1 Farmer 1 Bigha
213 Ebison Marak
- - - - - - - - 4 3 1 - 8 BPL 1 1 1 Farmer 9577443817 3 Bigha
214 Prencolin Marak
- - 1 - - - - - 2 1 1 - 5 APL 1 1 Farmer 8753868875 7 Bigha
215 Livingston Sangma
- - 1 - - - - - 5 5 - - 11 BPL 1 1 Farmer 78964820711 5 Bigha
216 Devi Rai - - - - - - - - 2 1 - - 3 APL 1 1 Pensioner
8472011698 7 Bigha
217 Nalini Rai - - - - - - - - 1 2 - - 3 APL 1 Labour 7399713833 3 Bigha
218 Sabita Rai - - - - - - - - 1 1 - - 2 BPL 1 1 Labour 9613021780 3 Bigha
219 Mukul Rai - - - - - - 1 - 4 2 - 1 8 APL 1 1 1 1 Business 9859872152 20 Bigha
220 Amoya Rai - - - - - - - - 2 - 1 3 BPL 1 Labour
221 Nabadip Rai - - - - - - - 1 1 1 - 1 4 APL 1 1 Labour
222 Puren Rai - - - - - - - - 2 1 - 1 4 BPL 1 1 Farmer 8011915522 4 Bigha
223 Bikeswar Rai - - - - - - - - 2 3 - 5 APL 1 1 1 Service 4 Bigha
224 Anna Rai - - - - - - - - 1 1 - 1 3 BPL 1 1 Farmer 9706590649 4 Bigha
225 Karna Rai - - - - 1 - - - 2 1 - - 4 APL 1 1 Business 9706910657 4 Bigha
PHOTO GALLERY
74
75
76
CERTIFICATE OF APPROVAL FROM VILLAGERS’:
78
79