SCHEDULE OF PRICES Schedule of Prices Page 1 of 36 SCHEDULE OF PRICES PROJECT : BPCL LPG IMPORT FACILITY AT HALDIA CLIENT : M/s BHARAT PETROLEUM CORPORATION LIMITED

Transcript of  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum...

Page 1:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 1 of 25

SCHEDULE OF PRICES

PROJECT : BPCL LPG IMPORT FACILITY AT HALDIA

CLIENT : M/s BHARAT PETROLEUM CORPORATION LIMITED

Page 2:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 2 of 25

SCHEDULE OF PRICES

UDescriptionU UFormNo.U

Preamble to Schedule of Prices

Summary of Lump sum Prices SP-0

Breakup of Lump sum price.

- Price of Supply of Materials SP-1

- Breakup of Lump sum Price (Services) SP-2

Annual Maintenance Contract Services SP-3

Recommended spares for two years normal operation and Maintenance SP-4Items for Addition and Deletion SP-5

Details of Excise duty, Central Sales Tax, Service Tax and Bengal VAT SP-6

CIF value of Imported Materials SP-7

Manpower during Stabilization Period SP-8

Page 3:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 3 of 25

PREAMBLE TO SCHEDULE OF PRICES

1. The entire Package consisting of Supplies and Services/ Work(s) the totality, shall be covered in the Lump sum Price.

FORM SP-0 gives the Lump sum Price by adding the price of materials given in FORM SP-1 and the price of services given in FORM SP-2. Bidder’s quoted prices shall be strictly as per various FORMS included under section Schedule of Prices. Bidder shall quote LUMPSUM PRICE for entire scope of work including Project management, Detail engineering, Procurement, supply. Fabrication, Inspection, Transportation, Storage, construction, installation, testing, pre-commissioning, commissioning and performance guarantee test run.

2. Spare for start-up /Commissioning, mandatory spares, special tools & tackles are in contractor’s scope of supplies and shall be included in the quoted lump sum prices in Form SP-1.

3. The Lump sum prices is inclusive of all taxes/duties and levies etc but excluding Service Tax , Swachh Bharat Cess & Krishi Kalyan Cess.

4. The prices quoted shall be lump sum prices on turnkey basis. Unless the basic parameter changes or additional / extra requirements are made, total payments to be made to the CONTRACTOR shall be limited to Lump sum Prices indicated in FORM SP-0, irrespective of the progressive payments made during execution based on the split up of prices.

5. Obligation of the CONTRACTOR is not limited to the quantities that the CONTRACTOR may either indicate in the Schedule of Break-up of Lump sum Prices along with his bid or in further detailed break-up of lump sum prices furnished after award of work. CONTRACTOR shall carry out entire scope of work / supplies as detailed in various sections / volumes of the Bidding Document within the quoted Lump sum Prices (Contract Price) as per FORM SP-0.

6. Lump sum prices quoted by the Bidder shall include cost of any other supplies / work(s) not specifically mentioned in the Bidding Document but necessary for the efficient, trouble free operation of the Plant and to make this package job complete in all respects.

7. Bidder shall note that break-up of lump sum prices is for interim payment purposes only and total price payable under the Contract shall be restricted to the Lump sum Price / Contract Price as per FORM SP-0.

8. Total prices for Supplies quoted in FORM SP-1 shall not exceed 60% (Sixty Percent) of the Total Lump sum Prices quoted in FORM SP-0. Total price quoted for Survey, Design & Detailed Engineering services part at Sr. No. 1 & 2 of FORM SP-2 shall not exceed 5% (Five percent) of the Total Lump sum Prices of the price of services quoted in FORM SP-0.

Page 4:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 4 of 25

9. In case the price(s) quoted exceed the limits specified at sl. 8 herein above, the excess amount shall be paid in Final Bill.

10. In case of any contradiction between Lump sum Prices mentioned in FORM SP-0 and break-up of Lump sum Prices mentioned in FORM SP-1 & FORM SP-2 the following precedence shall apply:

(i) FORM SP-0;

(ii) FORM SP-1 & FORM SP-2

11. a) Prices for annual maintenance contract (AMC) for a period of 5 years for various systems is to be quoted by the bidder in FORM- SP3, However, the prices quoted by the Bidder in FORM SP-3 shall not be considered for evaluation. The quotation by the bidder for annual maintenance contract is mandatory and shall have the option whether or not to accept the offer with respect to all or any of the said systems and/ or separately negotiate the annual maintenance contracts with the concerned manufacturers of the system or any of them as it deems fit.

b) The successful Bidder shall enter upon a suitable agreement with the relevant suppliers in accordance with FORM- SP3 covering all aspects and transfer the contract in the name of BPCL.

c) The five (5) year Annual Maintenance period shall commence with the expiry of the defect liability period for relative system.

12. Prices of two year operation & maintenance spare after defect liability period shall not be included in the lumpsum prices. Bidder shall furnish the two year operation and maintenance spares recommended manufacture suppliers for each item and the current applicable price list of such manufacturers/suppliers within six months from the date of issue of the letter/fax of acceptance. These prices shall be valid for a period of 12 months from the date of mechanical completion

13. a) If it is not feasible for the bidder to enter the items or relative values in the relevant SP forms due to limitation of space, the bidder may retype the forms wherever required and fill up the rates either by hand or by typing the values and/or items as required. The Bidder further declares that in the event of any discrepancy in the wording between the SP Forms enclosed with the Bidding Document and with any subsequent addendum and the working in the forms prepared by the bidder, the wording given in the SP Forms enclosed with the Bidding document or with any subsequent addendum as the case may be, shall prevail and the values submitted by the bidder shall be taken cognizance of and read accordingly.

b) All the original SP FORMS shall be enclosed duly signed and stamped by the bidder along with the priced sheets prepared by the bidder pursuant to (a) above.

14. Contractor to note that breakup of Lump sum price is for interim payment purpose only and total prices payable under the contract shall be restricted to the Lump sum Price/Contract Price

Page 5:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 5 of 25

15. The Bidder shall further ensure that all the originals written by hand or with signature affixed thereto shall be in Blue ink.

16. The lump sum price quoted by bidder shall be for the complete scope of work as defined in the bidding document. Any materials/services required for completion of work but not identified in the FORMS SP-1 to SP-2, the same is deemed to be included in the quoted lump sum price.

17. The incidental cost rising out of Punch list/check list issued by commissioning team of licensor or owner or operation group of owner during pre-commissioning/commissioning for smooth and trouble free operation of the system/units is deemed to be included in the quoted and accepted lump sum price against respective items of supply and services. The contractor shall not be entitled to any compensation in terms of cost and time for such additional supplies and/or services.

18. Prices for Recommended spares for two years normal operation and Maintenance to be quoted as per SP Form-4.

19. Prices for Addition and deletion of Items shall be as per SP Form-5.

20. Details of Taxes and duties to be provided in Form SP-6

21. CIF value of Imported materials to be provided in Form SP-7

22. Prices for Manpower during stabilization period in Form SP-8.

(STAMP & SIGNATURE OF BIDDER)

Page 6:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 6 of 25

SCHEDULE OF PRICES FORM-SP-0

SCHEDULE OF PRICESSUMMARY OF LUMPSUM PRICE

NAMEOFWORK: Survey, Design& Detailed engg., Supply, Insulation & Fabrication, Laying, Installation, Testing and Commissioning of 2 nos. 18” x 7.3 km (approx.) long cold insulated buried double walled metallic pipe in pipe (P-I-P) pipeline system for transportation of refrigerated/cryogenic Propane, Butane and LPG from Jetty No. 3 (HOJ-3) to BPCL LPG import terminal at Haldia including above ground piping works at Jetty & BPCL terminal & all Associated Works.

DESCRIPTION: Project management, Detailed survey and soil investigations, Design and detailed engineering, Design of insulation & Fabrication of buried double walled metallic pipe in pipe (P-I-P) system and above ground cold insulated piping system, procurement of all materials (except free issue materials) including all consumables required for execution of project, handling, loading, unloading & transportation of corrosion coated outer line pipes & bare inner pipes and other fittings (required for expansion/ contraction bulk heads etc.), bends, insulation materials and accessories, fabrication of pre-insulated double walled metallic pipe-in-pipe spools in the established fabrication yard, shop inspection & transportation of PIP spool to site (s); transportation of all other materials for buried and above ground piping items (including field insulation and joint coating materials, valves, fittings etc) to site and safe storage of all materials including maintenance of storage yard and dumpsite; receiving and taking over of all free issue materials (marine loading arms etc.) including loading unloading and transportation to contractor’s own storage yards; mobilization of all construction equipments, barges, cranes etc.; installation of all items, materials (including temporary items);data collection at site, route finalization, obtaining all approvals from statutory bodies, local authorities; liaisoning, clearance, re-habilitation, decongestion of unauthorized habitation (hutments, dwelling units, shops etc)required for installation and laying of pipeline system; laying, trenching & excavation to all depths and all types of soil, fitment, field welding, dewatering of trench where required including sheet piling as required, field insulation and field joints coating, inspection and testing, backfilling, erection, installation of cold insulated above ground station piping, hydrostatic testing, mechanical completion, cleaning, pigging, pre-commissioning, preservation, commissioning, pre-cooling works, mobilizing insulation vendor at site for close supervision; intelligent pigging; design and development of detailed specifications, drawings and other engg deliverables. Performing all works as per scope of supply/works for Cathodic protection of buried pipeline section, leak detection system, all above ground insulated piping, mechanical, civil, structural, electrical, instrumentation, telecommunication SCADA for jetty platform, tap off station for future pumping station & LPG import storage terminal and hook up at battery limits; Coordination with other agencies inside LPG import Terminal as required; restoration &as-built documentation and handing over to Owner. Performing all works as per the detailed scope of work enumerated in various sections of the bid document, P&IDs and process package, in accordance with the specifications, standards enclosed in the bid package and directions of Engineer in-Charge.

0

Page 7:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 7 of 25

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006

S.NO DESCRIPTION OF ITEM UNIT

AMOUNT IN INDIAN RUPEES (IN INR)

AMOUNT IN FOREIGN CURRENCY (IN EURO/ US$)

(IN FIG.) (IN WORDS) (IN FIG.) (IN WORDS)

1 Price for Materials as per Form SP-1 LS

2 Price for Services as per Form SP-2 LS

3 Total lump sum Price (1+2) to be considered for evaluation LS

1. The basis of prices shall be as per Preamble to schedule of prices and other provisions of the Bidding Document.

2. The Lump sum prices are inclusive of all taxes/duties and levies etc but excluding Service Tax, Swachh Bharat Cess & Krishi Kalyan Cess.

(STAMP & SIGNATURE OF BIDDER)

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

Page 8:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 8 of 25

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SUPPLY OF MATERIALS)

S.NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)

(INFIG.) (IN WORDS) (IN FIG.) (IN WORDS)

1.0Supply of all materials required for completion of all the works complete in all respects including mandatory spares, special tools and tackles etc., in the following areas:

1.1 Above Ground Piping at Jetty Platform & tap off station for future pumping station

1.1.1

Above ground insulated pipe, fittings, flanges, associated bulk piping items, insulation material, cladding, Cold Insulated Shoe Supports Strainers as per P&IDs.

LS

1.1.2 Strainers LS1.1.3 Motor operated ball valves LS1.1.4 Manual ball valves LS1.1.5 Manual butterfly valves LS1.1.6 Manual globe valves LS1.1.7 Manual non return valves LS

1.1.8 Instrumentation electro hydraulic actuated shutdown valves LS

1.1.9All other bulk instrumentation items, temperature, pressure instruments, coriolis meter, skin thermocouples, , PCV and rotameter for purging etc

LS

1.1.10 Supply of auxiliary piping for nitrogen bank

1.1.11 Electrical panels, earthing, cables, cable glands, telecom system etc LS

1.1.12 Instrumentation cables, field instruments, fittings etc LS

Page 9:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 9 of 25

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SUPPLY OF MATERIALS)

S.NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)

(INFIG.) (IN WORDS) (IN FIG.) (IN WORDS)1.1.13 All materials required for Civil and Structural Works LS1.1.14 Flow tee LS1.1.15 Monolithic Electrical Isolation Joint LS1.1.16 3 D bends as required LS

1.2 BURIED PIPELINE SECTION

1.2.1

Two nos. Low Temperature Carbon Steel Pipelines(length : 7.3 km approx. each) of Double Wall Metallic Pipe-In-Pipe (DWMPIP) of inner pipe (bare) of size 18“ OD & 3 Layer PE coated outer pipe, suitable for design temperature of(-) 48°C and design pressure of 35 kg/cm2(g). (Note-1)

LS

1.2.2 Insulation materials including all accessories for fabrication of Double Wall Metallic Pipe-In- Pipe. LS

1.2.3Long radius induction bends suited for minimum 3D radius bends for inner pipe as per detailed pipeline route

LS

1.2.4Expansion Bulkheads/ Fittings/ Accessories as per Thermal Analysis and End Bulkheads/expansion joints etc.

LS

1.2.5 Outer shells metallic bends of double walled PIP LS

1.2.6 Field Joint Kit including Insulation for Inner pipe & corrosion coating of Outer Pipe. LS

1.2.7 Supply of Casing Pipe, CS conduit for OFC at bored crossings LS

1.2.8 Pressure monitoring probe /pressure reduction equipment/leak detection methodology /OFC cable

LS

Page 10:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 10 of 25

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SUPPLY OF MATERIALS)

S.NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)

(INFIG.) (IN WORDS) (IN FIG.) (IN WORDS)sensor cable , server and associated item

1.3 LPG IMPORT TERMINAL PLOT 1.3.1 Flow tee LS1.3.2 Monolithic electrical isolation joint LS

1.3.3 Cold insulated Pig launcher and pig receivers, with pig signalers and pig handling trolley LS

1.3.4 Manual ball ,gate, globe, check valves LS

1.3.5

Piping materials such as pipes, flanges fitting, bulk piping items etc for piping associated with pig launcher and receiver up to the density meter skid including insulation and jacketing and associated insulated piping shoe supports.

LS

1.3.6 Strainers LS

1.3.7 Pig launcher and pig receiver including pig signaler , pig handling trolley, jib crane facility LS

1.3.8 Instrumentation electro hydraulic actuated shutdown valves LS

1.3.9

All other bulk instrumentation items, temperature, pressure instruments, ultrasonic meter, density meter, restricted orifice, analyzer package, skin thermocouples etc

LS

1.3.10 Instrumentation cables, field instruments, fittings etc LS

1.4 Electrical items –as required for project execution LS

1.5 Permanent Cathodic protection for the pipeline including anode bed, transformer cables etc LS

1.6 Telecom system for all the areas indicated in item LS

Page 11:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 11 of 25

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SUPPLY OF MATERIALS)

S.NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)

(INFIG.) (IN WORDS) (IN FIG.) (IN WORDS)1.1, 1.2 & 1.3 including supply of OFC along the pipeline including HDPE ducts

1.7 SCADA & LEAK detection system for the pipeline LS

1.8 Mandatory spares as enumerated in the contract document LS

Total of supply prices (1.1 to 1.8)NOTE:

1. The lump sum quoted price in for Double Wall Metallic Pipe-in-Pipe including inner & outer pipe together for 2 Nos. of 7.3 km approx. each i.e. 14.6 km. Any increase/ decrease in Pipeline length shall be regulated as per addition/deletion rates provided in FORM SP-5.

2. The basis of prices shall be as per the Preamble to Schedule of Prices and other provisions of the Bidding Document.

3. Above break-up pertains to supply of major items without identifying individual item. It will be the responsibility of the contractor to supply all materials/equipments required for completion of work as per the contract, irrespective of whether all items are identified above or not.

4. The total process of supply items, as indicated in SL.NO.1 shall not exceed 60% (Sixty Percent) of the total quoted lump sum price.

5. Prices of minor materials for Mechanical equipment, Electrical and Instrumentation and materials for Civil, Structural and General civil, Architectural, Painting works and all consumables for testing, Pre-commissioning& commissioning shall be included in prices for Construction/ Installation quoted in FORM SP-2.

(STAMP & SIGNATURE OF BIDDER)

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

Page 12:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 12 of 25

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006SCHEDULE OF PRICES

BREAKUP OF LUMPSUM PRICE (SERVICES)

S. NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)(IN FIG.) (IN WORDS) (IN FIG.) (IN WORDS)

1.

Detailed survey and investigations for Pipeline from Haldia jetty to LPG import terminal Hadlia including data collection, route finalization performing all works in accordance with the scope of works, specifications, standards of the contract document and directions of Engineer in-Charge

LS

2.

Design and detailed engineering:Design and detailed engineering for buried double walled pre-insulated metallic pipe in pipe (PIP) system and all above ground cold insulated piping works at all terminals including engineering all disciplines such as civil/structural, mechanical, electrical, instrumentation, CP, telecom & SCADA works; performing all detailed engineering deliverables and construction drawings; as-built documentation as per the detailed scope of work enumerated in various sections of the bid document, P&IDs and process package and in accordance with the specifications, standards of the contract document.

LS

Sub Total of 1 & 2 LS

3.

Fabrication for Insulation system & Double Wall Pipe-In-Pipe System:Insulation system & Double Wall Pipe-In-Pipe System including fabrication of pre-insulated double walled metallic pipe in pipe system suitable for refrigerated LPG/butane/Propane (-

LS

Page 13:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 13 of 25

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SERVICES)

S. NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)(IN FIG.) (IN WORDS) (IN FIG.) (IN WORDS)

48°C); Design for cold insulation system for above ground piping works at all terminals performing all works as per the detailed scope of work enumerated in various sections of the bid document, P&IDs and process package and in accordance with the specifications, standards of the contract document.

4.

Obtaining all approvals from statutory bodies, local authorities; liaisoning with local people & authorities, clearance, re-habilitation, decongestion of unauthorized habitation (hutments, dwelling units, shops etc) along the pipeline alignment required for installation and laying of pipeline system.

LS

5.

INSTALLATION & COMMISSIONING OF THE FOLLOWING: This includes supply of constructing material i.e. cement, reinforcement steel, structural steel, finishing materials for Civil, Structural, General Civil, and Painting and insulation for piping etc)

5.1Construction Works At Jetty Platform & Tap Off Points at Future Pump Station

5.1.1

Construction of above ground Piping and cold insulation and painting works including all foundations for Marine loading arms, fittings, pipe supports, pipe shoe, Pavements etc and other miscellaneous civil works, valve operating access platform, jump over platform for maintenance and operation, fencing and pavement work at tap – off

LS

Page 14:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 14 of 25

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SERVICES)

S. NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)(IN FIG.) (IN WORDS) (IN FIG.) (IN WORDS)

station.

5.1.2

Design, detailing, supply and construction of supporting structure for two no’s 18” pipelines and two no’s of 24” future pipelines on existing approach trestle including all modification and strengthening works.

LS

5.1.3Erection and commissioning of all manual valves/ actuated on-off shut down valves, all motor operated valves etc.

LS

5.1.4Installation of free issue Nitrogen cylinder bank and fabrication and installation of auxiliary piping & instrumentation items

LS

5.1.5 Pig signalers LS5.1.6 Isolating joint LS5.1.7 Flow Tees LS5.1.8 Electrical works LS5.1.9 Instrumentation works LS

5.1.10Hiring of suitable barge for installation of Client supplied marine loading arms including rail/road & marine transportation

LS

5.1.11Erection, installation, testing and commissioning of Marine loading Arms. (Under supervision of OEM)

LS

5.2 Installation Laying Of Buried Pipeline Section5.2.1 All field installation works related to buried

pipeline laying, field joint welding, insulation, inspection and other construction works as per detailed scope of work enumerated in various

LS

Page 15:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 15 of 25

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SERVICES)

S. NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)(IN FIG.) (IN WORDS) (IN FIG.) (IN WORDS)

sections of the bid document

5.2.2 All civil, structural works along the buried pipeline routing related to crossing. LS

5.2.3 All OFC and telecom, SCADA installation works LS

5.2.4 All major trenchless crossing execution (Such as Railway, Roads, NH & Water Crossing Etc.) LS

5.3 Construction Works For LPG Import Terminal Plot

5.3.1

Construction of all foundations for PIG launcher and receiver pig handling trolley, jib crane, analyzer shelter, density meter skid foundation, pipe support foundation, Pavements etc and other miscellaneous civil works, operating access platform, jump over platform for maintenance and operation as per requirement during detailed engineering.

LS

5.3.2 Erection of Pig receiver and pig launcher with pig handling trolley, Jib crane LS

5.3.3 Installation of Electrical insulation joint LS5.3.4 Installation of Flow Tees LS5.3.5 Installation of Strainers LS5.3.6 Fabrication and installation of above ground

piping including piping on racks (designed and installed by others) up to battery limits; support shoe (including clamped shoe), cold & protective insulation works, painting as required for project execution including utility hose station, sample connection, vent and drain system for interface with terminal piping works contractor inside the

LS

Page 16:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 16 of 25

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SERVICES)

S. NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)(IN FIG.) (IN WORDS) (IN FIG.) (IN WORDS)

terminal plot. 5.3.7 Electrical works LS5.3.8 Instrumentation works LS

5.4TCP &Permanent Cathodic protection for the buried pipeline including anode bed, transformer, CPL survey interference mitigation etc

LS

5.5 Telecom system including erection and commissioning of OFC LS

5.6 Leak detection system LS

5.7Hydrostatic testing, pigging (EGP) restoration and handing over of ROU, preservation of pipeline etc. including rail and road crossings

LS

5.8Pre commissioning and commissioning including mechanical completion, as per the contract document

LS

5.9 Miscellaneous5.9.1 Installation of geo-textile bags (wherever required) LS

5.9.2

Installation of casing pipe for double walled metallic pipe-in-pipe (PIP) and installation of double walled pipe-in-pipe inside casing pipe at cased crossings including CS conduit for OFC cables/HDPE ducts.

LS

5.9.3 NOC from respective statutory authorities as required LS

5.9.4 Installation of permanent pipeline markers i.e. Kilometer marker, Aerial Marker, warning signs

LS

Page 17:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 17 of 25

SCHEDULE OF PRICESBREAKUP OF LUMPSUM PRICE (SERVICES)

S. NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) AMOUNT IN FOREIGN CURRENCY (IN

EURO/ US$)(IN FIG.) (IN WORDS) (IN FIG.) (IN WORDS)

etc.Sub total of 3, 4 & 5

Total of Form SP 2 LS

NOTE:1. Price for supply of materials shall not be included in FORM SP-2.2. To facilitate progressive payment, billing break-up of the lump sum rates indicated above shall be made and approval of Engineer-in-Charge and

OWNER shall be obtained. 3. The breakup of prices given SP-2 above are inclusive of supply of cement, reinforcement steel, structural steel, finishing materials for Civil,

Structural, General Civil, and Painting for piping etc.4. The price for survey, design engineering services, indicated above (sum total of Sl. 1 & 2) shall not exceed more than 5.% of the Lump sum

Price/Contract Value

(STAMP & SIGNATURE OF BIDDER)

Page 18:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 18 of 25

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006

FORM SP-3PRICES FOR ANNUAL MAINTANENCE CONTRACT SERVICES

S.NO DESCRIPTION OF ITEM UNITAMOUNT IN INDIAN RUPEES

(IN INR) (IN FIG.) (IN WORDS)

1

Annual charges for maintenance of the following equipments comprising of deployment of minimum one supervisor including supply of spare parts ,rectification of software problems (wherever required) if any, including deployment of extra personnel required for repair or replacement of the above systems. The successful bidder shall enter upon a suitable agreement with the relevant suppliers of the following equipments covering all aspects and shall transfer the contract in the name of BPCL.

1.1 LEAK DETECTION of all types supplied in the Project execution scope

1 .1.1 First year after expiry of defect liability period LS

1 .1.2 Second year after expiry of defect liability period LS

1 .1.3 Third year after expiry of defect liability period LS

1.1.4 Fourth year after expiry of defect liability period LS

1 .1.5 Fifth year after expiry of defect liability period LS

1.2 Mass flow meter

1.2.1 First year after expiry of defect liability period LS

Page 19:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 19 of 25

1.2.2 Second year after expiry of defect liability period LS

1.2.3 Third year after expiry of defect liability period LS

1.2.4 Fourth year after expiry of defect liability period LS

1.2.5 Fifth year after expiry of defect liability period LS

1.3 Gas analyzer

1.3.1 First year after expiry of defect liability period LS

1.3.2 Second year after expiry of defect liability period LS

1.3.3 Third year after expiry of defect liability period LS

1.3.4 Fourth year after expiry of defect liability period LS

1.3.5 Fifth year after expiry of defect liability period LS

(STAMP & SIGNATURE OF BIDDER)

Page 20:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 20 of 25

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006

FORMSP-4PRICES SCHEDULE FOR RECOMMENDED SPARES FOR TWO YEAR OPERATION AND MAINTANENCE

S.NO Description of recommended spares UNIT RATE

(INR/ EURO/ USD $) QTYName of the

Recommended manufacturer

AMOUNT(IN FIG) (IN WORDS)

Note: These details shall be submitted by the successful bidder within six months from the date of letter/fax of acceptance. These prices shall be valid for a period of 12 months from the date of mechanical completion

(STAMP & SIGNATURE OF BIDDER)

Page 21:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 21 of 25

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006FORM SP-5

SCHEDULE OF PRICESItems for Addition and Deletion

S.NO DESCRIPTION OF ITEM UNIT QTY

Unit Rate AMOUNT IN INDIAN

RUPEES (IN INR)

AMOUNT IN FOREIGN CURRENCY (IN EURO/ US$)

INR USD (IN FIG.) (IN WORDS) (IN FIG.) (IN WORDS)1. Two nos. Low Temperature Carbon Steel

Pipelines (length : 7.3 km approx. each) of Double Wall Metallic Pipe-In-Pipe (DWMPIP) of inner pipe (bare) of size 18“ OD & 3 Layer PE coated outer pipe, suitable for design temperature of (-) 48°C and design pressure of 35 kg/cm2(g).

M 100

2. Design of HDD including supply, installation testing & pigging of DWPIP pipeline including supply of casing pipe and CS conduit.

M 200

3. Design of Bored crossing including supply, installation and testing of DWPIP pipeline section for locations other than those identified in the scope of work with supply of casing and CS conduits.

M 40

4. Tap Off Facilities including all material, services etc. LS 1

Note: Addition deletion item is for the purpose of adjusting the payment of the following

a) The above rates provided in Item no. 1 shall not be operated if the executed length of line pipe length is ± 100 m from the schedule length of 7.3 x 2 = 14.6km.

(STAMP & SIGNATURE OF BIDDER)

Page 22:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 22 of 25

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006FORM SP-6

DETAILS OF TAXES & DUTIES

S. No. DESCRIPTION

AMOUNT (INR)

Amount on which applicable

Rate (% applicable

)Total Amount of

Tax/Duty

(A) (B) (C) = (A) X (B)

1. Excise Duty included in Total Lump sum Price      

2. CST without Form 'C' on Supplies included in Total Lump sum Price      

3. VAT on Supplies included in Total Lump sum Price      

4. Service Tax excluded in Total Lump sum Price      

5. Swachh Bharat Cess excluded in Total Lump sum Price      

6. Krishi Kalyan Cess excluded in Total Lump sum Price      

7. Service Tax excluded in Stabilization Period (Form SP-8)

8. Swachh Bharat Cess excluded in Stabilization Period (Form SP-8)

9. Krishi Kalyan Cess excluded in Stabilization Period (Form SP-8)

10. Basic Custom Duty (in case of Imported items) on Finished capital goods included in Total Lump sum Price      

Page 23:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 23 of 25

11. Customs Educational Cess and Customs Secondary & Higher Education Cess included in Total Lump sum Price      

12. CVD included in Total Lump sum Price      

13. SAD/AID included in Total Lump sum Price      

14. Octroi/ Entry Tax included in Total Lump sum Price      

15. VAT on Works Contracts included in Total Lump sum Price      

16. Any other TAX/ Duties included in Total Lumpsum Price (Bidder to mention detail)      

Notes:

1. No Cenvat / Input Tax credit is available to BPCL.

2. While quoting, bidder shall have the option to decide on the method of valuation prescribed under the service tax rules, i.e. either on actual service portion or deemed service portion. Wherever Service Tax is to be paid on actual service portion, the bidder(s) shall indicate the value for service portion on which the Service Tax is applicable i.e. @ 15% (present rate) on actual value for service. Wherever Service Tax is to be paid on deemed service portion as per percentage prescribed, the bidder(s) shall indicate the percentage of the gross works contract value on which Service Tax is applicable i.e. 15% (present rate) on 40% of gross works contract value.

3. The Service Tax amount indicated by the Bidder in this Form shall include both, namely, (i) the amount of Service Tax payable by the bidder and reimbursable by Owner (ii) the amount of Service Tax, if any, directly payable by Owner , as applicable to recipient of service, as per the reverse charge rule of Service Tax.

4. The Service Tax, if any, to be payable by the Owner under reverse charge rule shall not be reimbursed to the Contractor but shall be directly submitted to the Service Tax Authorities by Owner. If the same has already been reimbursed / paid to the Contractor for whatsoever reason, the said amount, as submitted by the Owner to Service Tax Authorities, shall be deducted / recovered / adjusted from the payment due to the Contractor.

5. In case a bidder considers more than one rate of any particular at Tax/ Duty then the details above shall be furnished for each rate of such Tax/Duty.

Page 24:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 24 of 25

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006

FORM SP-7

CIF VALUE OF IMPORTED MATERIALSDESCRIPTION CIF value of

Import Content included in quoted

lumpsum prices for column (2) Qty.

(Rs.)

RATE OF CUSTOM DUTY INCLUDED IN QUOTED LUMPSUM PRICES

Sl.No Description of Imported Items

Qty. (Unit__) *(1)

CUSTOM TARRIF

NO.

BASIC CUSTOMS DUTY (%)

CVD + EDU. CESS

ON CVD (%)

EDU. CESS ON

CUSTOM DUTY (%)

SAD (%)

TOTAL CUSTOM DUTY (%)

1 2 3 4 5 6 7 8 9

i)_____                

ii)_____                

iii)______                

i)_____                

ii)_____                

iii)______                

i)_____                

ii)_____                

iii)______                

TOTAL CIF VALUE

(STAMP & SIGNATURE OF BIDDER)

Page 25:  · Web viewProviding of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No. Skilled Labour-04 Nos. Unskilled Labour-06

SCHEDULE OF PRICES Schedule of PricesPage 25 of 25

WORK: EPCM WORKS FOR REFRIGERATED PIPELINE SYSTEM

BIDDING DOCUMENT NO: AK/A872-020-MK-TN-9510/1006

FORM SP-8

Manpower during six month Stabilization Period

Sl.No Description Monthly rate (Lump sum)

1 Providing of Manpower during stabilization period on two shift per day basis (Minimum manpower per shift is Supervisor- 01 No.Skilled Labour-04 Nos.Unskilled Labour-06 Nos.)

Notes:1. Bidder price shall be inclusive of lodging, boarding, medical, all transport, all insurances including bidder’s personnel and third party insurance,

all taxes including income tax etc & all other incidental charges but excluding Services Tax, Krishi Kalyan Cess and Swachh Bharat Cess which will be paid extra.

2. Above Prices shall be inclusive of all tools and Tackles required during stabilization period.