1. Students attend 8 hr workshop on Problem Solving2. Students choose a problem in classroom to solve3. Student then breaks down the steps of the problem4. Instructors and AMT Leader mentor and coach
students5. Students visualizes problem on white boards6. Students presents problem solving boards to
manufacturers7. This should also be happening on the manufacturing
floor
Classroom Instruction
ll PROTECTED 関係者外秘
Classroom instuction
ll PROTECTED 関係者外秘
1.) Clarify the Problem 4.) Root Cause AnalysisUltimate Goal:
Ideal Situation:
Current Situation:
Problem Statement: Downtime is over target by 15'/shift.
2.) Breakdown the problem
5.) Develop Countermeasure & 6.) See Countermeasure Through
Upper Line Process 1 causes downtime due to a shortage of Pallets 7.) Evaluate Results
3.) Target Setting
8.) Standardize Success for Processes
UPPER LINE DOWNTIME IMPROVEMENT
Meet Vehicle Plant demand for AR Engines
Maintain æ 96% R/A per shift on Final Line.
Current avg. 30' Downtime per shift on Final Line yields a 92% R/A.
30
0
5
10
15
20
25
30
35
Upper Line Downtime
30
15
0
10
20
30
40
50
60
Actual Plan
Downtime
Minutes
GAP:15' Downtime/
Shift Avg.
What When Who
1 Yokoten Buffer requirements to Alabama for AR2 12/E PE
2 Yokoten alignment Kaizen to Alabama for AR2 2/B O/S
Root Qual ProdStatus No. Countermeasure Cause Cost Resrcs Risk Risk Selected NOV DEC JANFEBWHO
Ö 1 Add 2 Stoppers before Process 1 á Û á á á á O/S
Ö 2 Change Program for Data Read/Write in Process 1 Û á á á á á O/S
Õ 3 Change Program to Operate OS Buffer in Process 1 á á á á á á O/S
Upper Line Stop Time
Over Target
Process 1
Process 7
Process 12
Pallets
Attachment Child
Pallet must travel 3 pitches to first
Process
AM-186
ZY-588
Pallet
Process 9Nutrunner
ZY-620
AM-188
N/G Seal Press Pre-Tightening
Mechanical
Electrical TBD
SBS Conveyor Mother
Buffer
No Stopper in Place
Area not designed as
Buffer
X
á
×
á
á
×
×
ZY-620
Robot
Overrun
M/C Tightening
Cycle Time
Bolt Alignment
M/C Fault
Jig Alignment
Pallet
Jig only has alignment pins on one side
Jig does not self align
N/G Tightening
Overrun
Real Tightening
ReverseTightening
Torque Under
Pre-Tighten N/G
Angle N/G
Excessive Torque between
Bolt Jig & Washer
Mis-Alignment
Contamination
Minimal Clearance
between Jig Bolt & Washer Sleeve×
á
Û
Û
×
×
á
á
×
á
á
×
á
×
á
×
á
×
×
á
× ×
á
á
×
Û
á
×
á
á
á
Final Line Stop Time
FINAL Full 20'
Process 1 Downtime Process 7 Downtime Process 12 Downtime
16
4
02468
1012141618
Full Final ~ Upper Full Final ~ Test
Final Full Time
66'
24' 23'12.5' 10' 9.5'
0
20
40
60
80
1 8/9 7 12 4 2
Upper Line Downtime BY Process
Process #Do
wn
tim
e (M
inute
s)
0
10
20
30
40
50
60
70
Process 1 Process 7 Process 9 Process 12
Problem Types By Process
Mid-Test
Final
UpperRobot Test
30'
FINAL Short 4'
FINAL
å 15'/shift
13
0
2
4
6
8
10
12
14
16
18
20Process 1 Downtime
5
0
2
4
6
8
10
Process 7 Downtime
6
0
2
4
6
8
10
Process 9 Downtime
3
0
2
4
6
Process 12 Downtime
å 9'/shift
å
å 3'/shift å
1.5'/shift
= + + +
AR Assembly Layout
Pallets N/R Faults Pallet Lifter Work Delay
13
0
2
4
6
8
10
12
14
16
18
20Downtime/Shift
5
0
2
4
6
8
10
Downtime/Shift
30
0
5
10
15
20
25
30
35
Downtime/Shift
6
0
2
4
6
8
10
Downtime/Shift
Total Reduction
<15
Mi n
ute
s
Mi n
ute
s
Mi n
ute
s
Mi n
ute
s
Mi n
ute
s
Eliminate Pallet Downtime in Process 1 by Jan. 2010
Downtime/shift Downtime/shift Downtime/shift Downtime/shiftDowntime/shift
Do
wn
tim
e (M
inute
s)
Mi n
ute
s
Mi n
ute
s
Mi n
ute
s
Mi n
ute
s
Before/After Before/After Before/After Before/After
AMT Leader coached TBP principles one on one with students
ll PROTECTED 関係者外秘Students prepared their Problem Report on Board
ll PROTECTED 関係者外秘Some benefits of using the white board:•Makes activity easy for other to see•Easy to make changes
ll PROTECTED 関係者外秘
More benefits of using the white board:•Keeps the activity fresh when in view daily•Helps show a better picture of the program to visitors•Helps recruit new companies because they can see student activities
ll PROTECTED 関係者外秘
More benefits of using the white board:•Develops Public Speaking skills and presentation skills.
ll PROTECTED 関係者外秘
Other benefits of using the white board:•Save a good “example” to serve as a guide for students when preparing their own project boards.
ll PROTECTED 関係者外秘
Questions?