Table of Contents Read this First ............................................................................................... 1 1 Warning............................................................................................................ 1 General information.......................................................................................... 1 Unpacking Instruction .................................................................................. 2 2 Installation ................................................................................................... 12 3 Determine the best location for the System................................................... 12 Install the Document Feed Trays................................................................... 12 Install the HCDF............................................................................................. 13 Install the maxiFeeder.................................................................................... 13 Fill the Sealing Liquid Reservoir..................................................................... 14 Connect the System to Mains Power Supply and Power Up ..................15 4 Power Up........................................................................................................ 15 Set the Service phone number....................................................................... 16 Set the Language........................................................................................... 17 Connect the System to the Internet .......................................................... 19 5 Options for Connection................................................................................... 19 Set up a Wired Connection............................................................................ 20 Set up a Wireless Connection........................................................................ 21 Test the Connection........................................................................................ 23 Test the System ........................................................................................... 24 6 Create an Automatic Job................................................................................ 24 Shut Down the System................................................................................... 25

Transcript of | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob...

Page 1: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Table of ContentsRead this First ...............................................................................................11Warning............................................................................................................1General information..........................................................................................1

Unpacking Instruction ..................................................................................22

Installation ...................................................................................................123Determine the best location for the System...................................................12Install the Document Feed Trays...................................................................12Install the HCDF.............................................................................................13Install the maxiFeeder....................................................................................13Fill the Sealing Liquid Reservoir.....................................................................14

Connect the System to Mains Power Supply and Power Up ..................154Power Up........................................................................................................15Set the Service phone number.......................................................................16Set the Language...........................................................................................17

Connect the System to the Internet ..........................................................195Options for Connection...................................................................................19Set up a Wired Connection............................................................................20Set up a Wireless Connection........................................................................21Test the Connection........................................................................................23

Test the System ...........................................................................................246Create an Automatic Job................................................................................24Shut Down the System...................................................................................25

| Page 1 | TOC | May-03-2016 03:24 |

Page 2: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

| Page 2 | TOC | May-03-2016 03:24 |

Page 3: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Read this First1

Warning

Ensure you have read and fully understood the safety requirementsas written in the Safety Guide for Document Systems.

General information

This manual describes the unpacking and installation of the complete system and the stepsfor the first use.

User GuideThe (electronic) user guide of the system is part of the User Interface. It can be found underthe question mark button on the control panel.

1

| Page 1 | May-03-2016 03:24 | Read this First

1

English

Page 4: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Unpacking Instruction2

1. Open the box and place the delivered documentation aside. The following documentsshould be delivered:Installation Guide (this document);Safety Guide;Quick Start Guide.

2

| Page 2 | May-03-2016 03:24 | Unpacking Instruction

2

English

Page 5: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

2. Remove two blocks of packaging material and 4 boxes.

2

English

3

| Page 3 | May-03-2016 03:24 | Unpacking Instruction

Page 6: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

3. Lift the box and remove it from the tray.

4

| Page 4 | May-03-2016 03:24 | Unpacking Instruction

2

English

Page 7: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

4. Remove the two blocks packaging material on both sides. Remove the bottle withsealing fluid that has been packed inside a carton packaging block.

2

English

5

| Page 5 | May-03-2016 03:24 | Unpacking Instruction

Page 8: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

5. Remove both carton packaging blocks and the packaging material located behind thecollator.

6

| Page 6 | May-03-2016 03:24 | Unpacking Instruction

2

English

Page 9: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

6. Slightly lift the system in order to remove the optional side exit catch tray (only in casean optional side exit has been ordered/delivered).

Please refer to Mounting Instruction 67 if, for some reason, it isdesired to convert your side exit catch tray from RH to LH or viceversa.

2

English

7

| Page 7 | May-03-2016 03:24 | Unpacking Instruction

Page 10: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

7. Lift the system and place it on a stable surface (e.g. optional furniture).

8

| Page 8 | May-03-2016 03:24 | Unpacking Instruction

2

English

Page 11: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

8. Remove the packaging materials from the following places: Cardboard below the loc,at the document insert position;The foam blocks at the feeders;Band and foam blockat collator.

Do not connect to mains yet.

2

English

9

| Page 9 | May-03-2016 03:24 | Unpacking Instruction

Page 12: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

9. In case of a High Capacity Document Feeder:Cut both wire straps at the High CapacityDocument Feeder;Remove the transportation plate.

10

| Page 10 | May-03-2016 03:24 | Unpacking Instruction

2

English

Page 13: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

10. Check the contents of the boxes. One box contains the document feeders, main lead,LAN cable and a plastic bag containing three spare moistening brushes and a sparemoistening cloth.The contents of the other boxes depends on what optional has beenordered:MaxiFeeder;High Capacity Document Feeder;Rear catch tray;Side exit. Inthis case the side exit catch tray is packed in the (large) system box.If no optionalaccessories have been ordered the boxes are empty. 2

English

11

| Page 11 | May-03-2016 03:24 | Unpacking Instruction

Page 14: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Installation3

Determine the best location for the System

Install the system on a stable surface.1.2. Make sure that the system is suitable for the local mains voltage. Refer to the type

plate.3. The power connection must be easily accessible, preferably close to the system. For

safety reasons, it is essential that the system is connected to a socket outlet that hasa protective earth connection.

Install the Document Feed Trays

As the paper detection actuators are fragile, take care of themwhenyou install the document feed trays.

Place the document feed trays in position:

Hold the document feed tray slightly inclined as shown in the figure.1.

2. Place the front end of the document feed tray underneath the two black rollers.3. Move the document feed tray upwards (lifting the black rollers), until it is possible to

‘hook’ the feeder into place.

4. Move the document feed tray towards the machine and move the hooks over themounting points (on both sides).

5. Let the document feed tray rest on the machine.

12

| Page 12 | May-03-2016 03:24 | Installation

3

English

Page 15: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Install the HCDF

To install the feeder tray of the HCDF:

As the paper detection actuators are fragile, take care of themwhen(re)placing document feed trays.

1. Pull down lever A.2. Hook in the feeder tray.3. Release lever A.

Install the maxiFeeder

The maxiFeeder should be installed at the position of feeder no. 1.Install the maxiFeeder as follows:

Move the feeding plate of the maxiFeeder to the rear position.1.2. Lift the paper feed rollers with the front edge of the maxiFeeder.

3

English

13

| Page 13 | May-03-2016 03:24 | Installation

Page 16: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

3. Move the maxiFeeder forward until it hooks behind the frame axle.4. Connect the connector A to the socket B.

The maxiFeeder is auto-detected by the system when the system is switched on. Thismakes it easy to switch over from the standard document feeder tray to the maxiFeederand vice versa.To make use of a maxiFeeder it is not necessary to (re-)program the jobs.

Fill the Sealing Liquid Reservoir

Open the front cover B.1.

2. Fill the reservoir A to the "Max" lip with sealing liquid.3. Close the front cover B.

Before starting the job, wait approximately 5 minutes for the brushes to moisten or usemoistened brushes. For instructions on the installation of brushes, see the User Guide,section Clean and replace brushes.If the liquid reservoir is almost empty the touchscreen shows a message to warn you thatyou should refill the reservoir.

14

| Page 14 | May-03-2016 03:24 | Installation

3

English

Page 17: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Connect the System to MainsPower Supply and Power Up

4

Power Up

To start up the system:

You can severely damage the machine if it is connected to theincorrect mains voltage. Before plugging in the machine, check ifthe local voltage is the same as the voltage mentioned on the typeplate.

1. Connect the system to the mains power supply.2. Use the power switch A to switch the system on.

15

| Page 15 | May-03-2016 03:24 | Connect the System to Mains Power Supply and Power Up

4

English

Page 18: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

3. Press the button next to the display.

The touch screen shows the Job list screen.

Set the Service phone number

Make sure that the service phone number is correct. If not, change the number. Proceedas follows:

Log in as a service technician and open the service menu.1.

16

| Page 16 | May-03-2016 03:24 | Connect the System to Mains Power Supply and Power Up

4

English

Page 19: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

2. Select the tab "Configuration" and tap [Customisation].

3. Check the Service phone number and change if necessary.4. Logout to return to the operator level.

Set the Language

Go to the (operator) settings menu.1.

4

English

17

| Page 17 | May-03-2016 03:24 | Connect the System to Mains Power Supply and Power Up

Page 20: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

2. Tap [Localisation] and select the desired language from the pull down menu.

18

| Page 18 | May-03-2016 03:24 | Connect the System to Mains Power Supply and Power Up

4

English

Page 21: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Connect the System to the In-ternet

5

Options for Connection

Connect the system to the internet in one of the following ways:

• Wired connection with the gigabit ethernet connection:Connect with DHCP (Automatic IP address)-

- Manual Configuration• Wireless connection:

Search for SSID-- Manually configure SSID

In all cases, you can use proxy for the connection.

Log on as Supervisor to complete this procedure.

19

| Page 19 | May-03-2016 03:24 | Connect the System to the Internet

5

English

Page 22: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Set up a Wired Connection

Set up a wired connection as follows:

Connect the system to a LAN with a network cable. The figure shows the LANconnector (B).

1.

2. Open the supervisor settings menu.3. Tap the Settings tab, [Connectivity].4. Tap [LAN settings].

20

| Page 20 | May-03-2016 03:24 | Connect the System to the Internet

5

English

Page 23: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

5. Select Wired from the Connection type pulldown menu.

6. Set Automatically obtain IP address (DHCP) to Yes or No. If Yes, the systemconnects automatically to the LAN. If No, set up a connection manually. Enter thenecessary details to setup a manual connection.

Set up a Wireless Connection

Set up a wireless connection as follows:

Open the supervisor settings menu.1.2. Tap the Settings tab, [Connectivity].3. Tap [LAN settings].

5

English

21

| Page 21 | May-03-2016 03:24 | Connect the System to the Internet

Page 24: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

4. Select Wireless from the Connection type pulldown menu.

5. Choose if you want to enter the SSID manually or if you want to search for a wirelessnetwork. If you want to search for a network, tap [Choose network].

6. When you have entered the network details or selected a network from the search,tap [Connect] to connect to the network.

When the system connected successfully to the network, the screen shows Connected.

22

| Page 22 | May-03-2016 03:24 | Connect the System to the Internet

5

English

Page 25: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Test the Connection

When you have connected to a network, test the connection as follows:

Open the supervisor settings menu.1.2. Tap the Settings tab, [Connectivity].3. Tap [Test connections].

4. Tap the [Test] button.

The system tests the IP addresses that are defined at the LAN settings. If the result is 'NotOK', make sure that the settings are correctly defined.

5

English

23

| Page 23 | May-03-2016 03:24 | Connect the System to the Internet

Page 26: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Test the System6

Create an Automatic Job

Proceed as follows if you want to create an automatic job:

From the Job list menu, tap [New job].1.2. Tap [Automatic] to start an Automatic job.

3. Fill the envelope hopper, load your documents and tap [1x] to create an example mailset.

4. Make sure that the address position and the envelope stop position is correct. Ifnot, adjust the address position and envelope stop position.

5. If necessary, tap the counter symbol to set the counters. See counter settings.6. Tap [Start] to start the job.7. Tap [Stop] to finish the job.

Tap [Save] if you want to save the settings of the Automatic job to a new job.

24

| Page 24 | May-03-2016 03:24 | Test the System

6

English

Page 27: | Page 1 | TOC | May-03-2016 03:24 | TableofContents · 6 TesttheSystem CreateanAutomaticJob Proceedasfollowsifyouwanttocreateanautomaticjob: 1. FromtheJoblistmenu,tap[Newjob]. 2.

Shut Down the System

Press the button next to display to shut down the system.1.

When the system is busy, it completes and inserts the current set, stops and will be shutdown.

6

English

25

| Page 25 | May-03-2016 03:24 | Test the System