INTEGRATED LAND ADMINISTRATION SYSTEM...

20
INTEGRATED LAND ADMINISTRATION SYSTEM PROJECT PROJECT FINANCIAL STATEMENTS DESIGNATED ACCOUNT STATEMENT TOGETHER WITH INDEPENDENT AUDITORS' REPORT FOR THE YEAR ENDED DECEMBER 31, 2015 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of INTEGRATED LAND ADMINISTRATION SYSTEM...

Page 1: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

INTEGRATED LAND ADMINISTRATION SYSTEMPROJECT

PROJECT FINANCIAL STATEMENTS

DESIGNATED ACCOUNT STATEMENTTOGETHER WITH INDEPENDENT AUDITORS' REPORT

FOR THE YEAR ENDEDDECEMBER 31, 2015

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

INTEGRATED LAND ADMINISTRATION SYSTEM PROJECT

CONTENTS

PageProject Financial Statements and Independent Auditors' Report:

Independent Auditors' Report 1 -2

Statement of Assets and Liabilities 3

Statement of Sources and Uses of Funds 4-7

Statement of Expenditure by Components - Loan 8

Notes to the Project Financial Statements 9 - 12

Annex I - Reconciliation of the Loan Account 13

Independent Auditors' Report on the Designated Account 14

Designated Account Statement 15

Management letter to the Project implementation Unit 16 - 17

Checklist 18

Page 3: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

Tel: +385 1 2395 741 BDO Croatia d.o.o.Fax: +385 1 2303 691 10000 ZagrebE-mail: [email protected] Trg J. F. Kennedy 6b

Republic of CroatiaMinistry of JusticeUtica grada Vukovara 4910000 Zagreb

and

Republic of CroatiaState Geodetic AdministrationGru9ka 2010000 Zagreb

INDEPENDENT AUDITOR'S REPORT

We have audited the accompanying Statements of assets and liabilities of the IntegratedLand Administration System Project (the Project) financed under the International Bank forReconstruction and Development Loan (the Loan) No. 8086-HR as at December 31, 2015and the related Statement of sources and uses of funds and Statement of expenditure bycomponents (Project Financial Statement). These statements are the responsibility of theProject Implementation Unit. Our responsibility is to express an opinion on this statementbased on our audit.

We conducted our audit in accordance with International Standards on Auditing. Thesestandards require that we plan and perform the audit to obtain reasonable assurance aboutwhether the Project Financial Statement is free of material misstatement. An auditincludes examining, on a test basis, evidence supporting the amounts and disclosures inthe Project financial statements. We believe that our audit provides a reasonable basis forour opinion.

Page 4: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

IB D O BDO Croatia d.o.o.

In our opinion, the Project Financial Statements as at December 31, 2015 present fairly inall material respects, the cash receipts and payments in the year 2015 of the Project inaccordance with the World Bank's requirements.

The supplementary information included in Annex I to the Project Financial Statements arepresented for the purpose of additional analysis and is not a required part of the basicProject Financial Statements. Such schedules have been subject to the auditing proceduresapplied in our audit of the basic Project Financial Statements and, in our opinion, arefairly stated in all material respects when considered in relation to the basic ProjectFinancial Statements taken as a whole.

Zagreb, June 21, 2016

BDO Croatia d.o.o.

Zagreb, Trg J. F. Kennedy 6

110 Crowiia (Lo.o.Z., pruiuni tvNizorskili,konlingi ratun1oldsA inih uslua

Zdenko Balen, certified auditor,member of Management Board

2

Page 5: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

INTEGRATED LAND ADMINISTRATION SYSTEM PROJECT

STATEMENT OF ASSETS AND LIABILITIESas at December 31, 2015

(EUR)

31 Dec 2015 31 Dec 2014

Assets

Cash on the Loan Designated Account 160,255 586,500Project expenditures 9,976,224 5,141,144

10,136,479 5,727,644

Liabilities

Loan IBRD 8086-HR 8,300,798 5,102,914Republic of Croatia 1,126,768 624,730Activities financed 100% from the State Budget 708,913 0

10,136,479 5,727,644

3

Page 6: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

C) 0 O 00 CO c - ' 0 a0 0C) CD C w '0 't %0 Ln L 00 M N00 m ' 00

I14 LC< 10 r* C' '4o00 r - os - o -

ao ooý -ýen

-. -. 00 00-ooN

vi oc

o a c, m o n T

oS o % Cs r-, _ --oC- , -p os4 m ( c

-n CY r , C7I

ato

m_ moa m o, .n n ,- D (,, Ln Ln m oD mn n Cy,, ,O - Ln" L 0 - 0o N 00 L"a -L N N

-0o-- 0'- oc ~ r- l' -n W' 0 D 0 C- 0

al CD0 q^ r-,^- 0n^ m^I 0%

l -- - o'-

Eo

Z

O

on m o - ý -- 4 C) C) C) o oI-~~~0 en ý;-a e n o -e

0 o00 C , O' U. CO r o - 0 o o

0 N '0- N U- - 00 L 0 N - NoNg g0r 000 0r,U<ýN æc c j L q L

Z7 CD C,)o m e o C)

N Ln 0, m

L -

Z<

QQ

z0

LU <

ze c

w u.

z o

u E U

fa ý C) k O

00 E L>nEE

n - 0 0- c -0 GE

C L.

LL N- c'< E

m~ en ''- on cm>o 2 - -_ E =3 > M .

onEâ *w 0E · E 0 .- Y

E u Lo u En En (D>© ©<

2 E E tEr E U D a Ec, U W V) u

u- uý <0 -0 OL(U C) = 0

z 2 J

J c~ m Cl 0 0m

0~ M u0 0- E« <l ~-. I CO - = u -i Ln - a L

Page 7: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

C) E n L Ln Co Ln

00 y0 -oo

e MM

C) C N4 n r") Ln o C> C> 0C) 0 r N O n , <- N q- Ln

CD ~ ~ o Ln 0 c, 0

Ln æ q- N ra 00 q - '- - -

c - -

c

00co Ln Ln N N4 r- Ln o C M 0o(7 a Ln Ln Ln L 4 N q- Ln o

o. co ) o g Ln Ln - N, C00 e 'T CD r- 00 0

00~ r-4 00'00 000 -

>L o

z0

L00 Ln CDl <'4 m r- C> '00 l 0>00 00 r_' r- - <'4 00r-

,q" 00

Ln 0 C N0

10 a, L700 <n co 0 0 %N 0

<n z W 0<4.

i <' '

0 Eu 5

Z

z00C

wO

I-

00

tn E

0 a.

w E Ee . o

of a aLn E

Z -È G>?

U0

0ns . - U-

O on i- - a .

1- E u o o E a *on on0 * '

:: 0 w ru. O - vi~L

LL .. on Ø.o -

<-i w*~

ra cn _i Ln E

L^ -- u o - a° E U- " -

D LJ. -J-¡ LL. a - W

Page 8: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

rON 00 L N m 0 oN00 00 00 Nr,, r_~ 0

N O T O N O

,go IT Ln C- ?2 v o a

qrnOCP rl- rid a, 0

b - Co o - o

0f m- m0 0- Y, 00 n rn

N. oo o2 0 o m i 0' -440 CD p,q- o - a 0

-, r- Ln 0' fNn

-- am * '

00 r11 -I g- ; 00 r, fn -,0 co 0 00 10 r-N u; 00

N6O'R ý r-O Ny 00' r 0cr wrc4 CD m 1 NNO'00r00 C)

mO 000 0 00 00

rn Ln c14 < L' Ln Ln

E

0u

00O -0 N ' NO*

LL-0 £Lato

uuw

<0

. 41 0

N W

00

0 0z[ 0 ej

CLu W

< a o

u E

o O 0>o - a000 a to .E o .c

E0~ ~ ~ p, 1:- E

CD ý <0 VI

O .0-

o~ Q) VI 0 O

I E vi t u r_o ctt In on ( oJ 0

UJ¶ EË o

m O a. e - ..-- c as

1 0 ... i .L.il""~t L-' W j - 5 On unc 54f EI-Ei O !: . E ' -

< .wu <u

klt 0. 0 ci<0. EL.9rdm tn < F- vi EJ a-' - <u F-

Page 9: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

STATEMENT OF SOURCES AND USES OF FUNDS - continuedas at December 31, 2015

Comments on Statement of Sources and Uses of Funds

(1) The budget is based on total estimated expenditures needed to complete theProject. The Project is expected to be completed by April 30, 2017.

(2) The first expenditure related to the Project was made on December 7, 2010.

(3) The total Project budget is 19,114,163 EURand consist as follows:

IBRD Loan No. 8086-HR 16,500,000Budget of the Republic of Croatia 1,905,250Activities financed 100% from the StateBudget 708,913Total 19,114,163

(4) Expenditures in Croatian Kuna were translated into EUR at the exchange rateruling at the date of the transaction.

7

Page 10: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

STATEMENT OF EXPENDITURE BY COMPONENTS - LOANas at December 31, 2015

(EUR)

Component For year ended31 December Cumulative

2015

A - Land registration System Development 0 124,780

B - Spatial information and Cadastre System Modernization 1,137,001 2,897,426

C - Improving Digital Services 2,725,032 3,915,382

D - Project management, Training and Public Awareness 264,134 1,193,825

Refund of the Advance P459-HR 0 922,026

Financing of activities from the Preparation phase 0 172,623

Front-end Fee 0 41,250

Activities financed from the Budget of the Republic of Croatia 708,913 708,913

TOTAL 4,835,080 9,976,225

8

Page 11: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

NOTES TO THE PROJECT FINANCIAL STATEMENTSas at December 31, 2015

1. GENERAL

The objective of the Integrated Land Administration System Project is to modernizethe land administration system in order to improve the government services from thepoint of view of efficiency, transparency and cost. The project represents acontinuation of the Real property Registration and Cadastre Project and it furtherdeepens the reforms and integration of the land administration system.

Performance indicators are as follows:

- higher customer satisfaction with the services of the land administration- reduced processing time of transactions in the Land Registry and Cadastre- higher percentage of users that send requests/transactions online- greater use of spatial data to be exchanged between state institutions/ministries.

Beneficiaries of the Project are:

- the public, since they will have greater access to information and better serviceswith fully integrated digital data;

- the entire business community, again with faster access to information andservices;

- other government bodies that will share more easily and have a better insight intothe government spatial data.

The Project encompasses the following four components:

Component A. - Land Registration System Development

Component B. - Spatial Information and Cadastre System Modernization

Component C. - Improving Digital Services

Component D. - Project Management, Training and Public Awareness

The Project is being implemented over a five ande half year turn.

The Advance agreement for the Project preparation No. P459-HR between the Republicof Croatia and the International Bank for Reconstruction and Development (the Bank) inthe amount of 1,450,000 USD was signed on August 3, 2010. Advance funds, pursuant tothe Agreement, financed the purchase of goods and consulting services for:

- preparatory analysis and studies for preparation of detailed project implementationplan

- pilot project of the system expansion (roll-out) of JIS on four locations

- execution of the project.

Advance funds were used by November 15, 2011.

9

Page 12: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

NOTES TO THE PROJECT FINANCIAL STATEMENTS (continued)as at December 31, 2015

The Loan agreement for the Project No.IBRD-8086-HR between Republic of Croatiaand the Bank in the amount of 16.5 million Euros was signed on August 17, 2011. The goatof the Project is to modernize the land administration system to improve governmentservices in terms of efficiency, transparency and cost.

Law on ratification of the Loan agreement between Republic of Croatia and theInternational Bank for Reconstruction and Development for the Implementation of theIntegrated Land Administration System Project was adopted on 24th session of the CroatianParliament on October 21, 2011 and published on November 7, 2011 in the OfficialGazette, International Agreements No. 13/2011.

The Loan became effective on November 15, 2011.

This report contains an overview of the use of funds in 2015 and the total for theperiod from the effective date of the advance agreement No. P459-HR and the IBRD LoanNo. 8086-HR to December 31, 2015.

2. BASIS OF ACCOUNTING AND SUMMARY OF ACCOUNTING POLICIES

2.1. Accounting Records and Basis of Presentation

The Project maintains its accounting records using the World Bank guidelines(Annual Financial Reporting and Auditing for World Bank - Financed Activities, ProcurementHandbook and Disbursement Handbook).

2.2. Implementation of the Project

Ministry of Justice and State Geodetic Administration, by the relevant Ministry ofconstruction and spatial planning (hereinafter: MGiPU) concluded the Agreement onImplementation of the Integrated System of Land Administration Project on May 16, 2011and on 14 March 2012 and 13 February 2014 agreement on amendments to the Agreementon the Implementation of the Integrated Land Administration System.

The Agreement was concluded for the purpose of the regulation of mutual relationsand responsibilities in the Project implementation, determining body for implementationof the Project and allocation of responsibilities.

The bodies responsible for implementing the Project are Project SteeringCommittee, Coordinators of components of the Project in the Ministry of Justice and theState Geodetic Administration and the Project Implementation Unit.

The Project Steering Committee has two co-chairs: Assistant Minister of Justice forcivil, commercial and administrative law in the Ministry of Justice and the Director of theState Geodetic Administration.

Members of the Project Steering Committee are: MGiPU Assistant Minister, Head ofthe Land Registry Management Service in Ministry of Justice, Head of the Division ofCadastral System of the State Geodetic Administration, named representative of theSupreme Court of the republic of Croatia and a named representative of the Ministry ofFinances.

10

Page 13: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

NOTES TO THE PROJECT FINANCIAL STATEMENTS (continued)as at December 31, 2015

2.2. Implementation of the Project (continued)

The Project Steering Committee manages the Project, monitors the implementationof individual phases of the project, spending, discusses the reports of the Land RegistryManagement Service, Division of Cadastral Systems and Project Implementation Unit,determines the priority areas, monitors the budget spending, coordinates the donorengagement and makes decisions related to the implementation of the Project and givespermissions for all the key plans and changes of plans.

Coordinators of the Project components at the Ministry of Justice and StateGeodetic Administration coordinate the implementation of the activities of individualcomponents for which they are nominated and are accountable for their work to theinstitutions that nominated them.

The Project Implementation Unit, whose superior is Project Steering Committee, isresponsible for the procurement, financial management, disbursements, monitoring andevaluation and compliance of safeguard mechanisms within the Project and it serves as theSecretary of the Project Steering Committee.

On the side of the lender the Bank, there is a Project team with the leader of theProject team responsible for the coordination and monitoring of the implementation of theProject.

Realisation of the Project is determined by the regulations of the Bank for theProject implementation, procurement, contract management, use of the Loan, auditingand reporting to the Bank and the EU.

2.3. Project Expenditure

The Project Expenditure is stated at original cost on the Statement of Assets andLiabilities.

2.4. Liabilities

The Advance agreement No. P459-HR between Republic of Croatia and the Bank inthe amount of 1,450,000 USD was signed on August 3, 2010. Advance was approved for thepreparation of the Project whose aim is to modernize the Land Administration System toimprove government services in terms of efficiency, transparency and cost. Project leadersand beneficiaries are the Ministry of justice and the State Geodetic Administration.Advance funds were used by November 15, 2011.

In accordance with the Decision of the Croatian Government to initiate proceedingsfor the making of the Loan agreement for the Project, authorised Croatian delegation hasmade final negotiations with the Bank in June 2011 and the Loan agreement was signed onAugust 17, 2011.

Contracted amount of the Loan is 16.5 million Euros. The Loan became effective onNovember 15, 2011.

The Project completion is expected by April 30, 2017.

11

Page 14: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

NOTES TO THE PROJECT FINANCIAL STATEMENTS (continued)as at December 31, 2015

2.4. Liabilities (continued)

The principal and the interests are the responsibility of the Republic of Croatia.

Return of the principal starts on November 15, 2015 with final maturity onNovember 15, 2030. Payment dates of principal are May 15 and November 15.

The amount of interest paid by the Borrower for each interest period is equal to thereference rate for the Loan currency plus the fixed spread, provided that upon conversionof all or partial amount of the principal of the Loan, interests, which the Borrower paysduring the conversion period, are determined in accordance with the relevant regulationsof the Article 4 General Conditions.

Republic of Croatia is obligated to pay the Front-end Fee for the use of the Loan inthe amount of 0.25% of the Loan.

2.5. Contributions by the Republic of Croatia

The Republic of Croatia is responsible for paying Project expenditures in accordance withthe Loan Agreement. The total amount of Project expenditures paid by the Republic ofCroatia for the year ended December 31, 2015 amounted to 1,210,951 EUR.

12

Page 15: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

ANNEX I

RECONCILIATION OF THE LOAN ACCOUNT

(EUR)

The amount of the loan used by December 31, 2015 8,300,798

Cash on the Designated Account 160,255

Increase: total expenditure stated in the Statement of Sources and Use of Funds 8,140,543

Total expenditure 8,300,798

13

Page 16: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

Tel: +385 1 2395 741 BDO Croatia d.o.o.Fax: +385 1 2303 691 10000 ZagrebE-mail: [email protected] Trg J. F. Kennedy 6b

Republic of CroatiaMinistry of JusticeUtica Grada Vukovara 4910000 Zagreb

and

Republic of CroatiaState Geodetic AdministrationGru9ka 2010000 Zagreb

INDEPENDENT AUDITORS' REPORT

We have audited the accompanying Designated Account Statement of the Integrated LandAdministration System Project (the Project) financed under International Bank forReconstruction and Development Loan No. 8086-HR as at December 31, 2015. TheDesignated Account Statement is the responsibility of the Project implementation Unit.Our responsibility is to express an opinion on the Designated Account Statement based onour audit.

We conducted our audit in accordance with international Standards of Auditing. Thosestandards require that we plan and perform the audit to obtain reasonable assurance aboutwhether the Designated Account Statement is free of material misstatements. An auditincludes examining, on a test basis, evidence supporting the amounts and disclosures inthe Designated Account Statement. We believe that our audit provides a reasonable basisfor our opinion.

In our opinion, the accompanying Designated Account Statement as at December 31, 2015present fairly, in all material respects, the movements in the year 2015 on the DesignatedAccount of the Project, in accordance with World Bank guidelines.

Zagreb, June 21, 2016

BDO Croatia d.o.o.

Zagreb, Trg J. F. KennedyBa)O Cr in I1l;.T

i I nl llo odshL el ill %IliI I.(fl,41 iiI

Z 112 JX) ' Kellllvdl 6/1)

Zdenko BaLen, certified auditor,member of Management Board

15

Page 17: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

DESIGNATED ACCOUNT STATEMENTas at December 31, 2015

Bank: Raiffeisenbank Austria d.d., ZagrebAccount No.: 2484008 - 1300158260

(EUR)

Balance as at 1 January 2015 586,500

Increase

Withdrawal 3,197,885

Decrease:

Payments from the Designated Account (3,624,130)

Balance as at 31 December 2015 160,255

Note: Designated Account for the Loan was opened on February 27, 2012 in Raiffeisenbank Austria d.d.,Zagreb. Account No. 2484008-1300158260.

15

Page 18: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

Tel: +385 1 2395 741 BDO Croatia d.o.o.Fax: +385 1 2303 691 10000 ZagrebUD_ _ E-mail: [email protected] Trg J. F. Kennedy 6b

Republic of CroatiaMinistry of JusticeUtica Grada Vukovara 4910000 Zagreb

and

Republic of CroatiaState Geodetic AdministrationGru9ka 2010000 Zagreb

Dear Sirs,

We are pleased to submit this letter, containing our comments, observations, and recommendations

concerning the internal control structure and other matters which resulted from our audit of the

Integrated Land Administration System Project ("the Project") financed under International Bank for

Reconstruction and Development Loan No. 8086 - HR at December 31, 2015.

In planning and performing our audit we considered the project's internal control structure in order to

determine our auditing procedures for the purpose of expressing an opinion on the financial statements

taken as a whole, and not to provide assurance on the internal control structure. Our report cannot,

therefore, be expected to include all possible comments and recommendations that a more extensive

special examination might indicate. We also considered the degree of compliance of the Project with any

loan covenants, the World Bank Procurement guidelines, World Bank Disbursement guidelines and the

World Bank financial reporting guidelines.

This report is intended solely for the information and use of the International Bank for Reconstruction

and Development and the Project Implementation Unit. We would be pleased to discuss our comments,

observations, and recommendations with you.

Zagreb, June 21, 2016

With respect,

BDO Croatia d.o.o.

Zagreb, Trg J. F. Kennedy 6b J

100 L III Wk d.o.11UI

Zdenko Balen, certified auditbf,' Kinnedc we

member of Management Board

16

Page 19: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

MANAGEMENT LETTER TO THE PROJECT IMPLEMENTATION UNIT

as at December 31, 2015

ACCOUNTING RECORDS, SYSTEMS AND CONTROLS

None significant noted.

DEFICIENCIES AND WEAKNESSES IN THE INTERNAL CONTROL SYSTEM

None significant noted.

COMPLIANCE WITH THE FINANCIAL COVENANTS AND WORLD BANK GUIDELINES

Our audit is conducted in accordance with International Standards on Auditing, designed to obtain

reasonable assurance that the financial statements are free of material misstatement. Therefore, our

audit included testing of evidence supporting the amounts and other disclosures in the financial

statements.

Based on our audit procedures and the selected items which we examined, we did not note any instances

of non-compliance of financial information with the World Bank guidelines.

OTHER MATTERS

None significant noted.

17

Page 20: INTEGRATED LAND ADMINISTRATION SYSTEM …documents.worldbank.org/curated/en/232871467847747150/...klt 0. 0 ci

CHECKLIST

NAME OF THE LOAN: IMPLEMENTATION OF THE INTEGRATED LANDADMINISTRATION SYSTEM PROJECT

LOAN: Loan IBRD 8086-HR

AUDITED PERIOD December 31, 2015

Included N/AI. Audit Report (Opinion):A. Applicable accounting standards noted XB. Applicable auditing standards noted XC. Opinion rendered on all forms of withdrawals:

1. Statement of Expenditures X2. Designated Account X

D. Alt sources of financing for the project noted XII. Financial Reports:

A. Revenue Earning Entity (all of the following arerequired):

1. Balance Sheet X2. Cash Flow Statement X3. Income Statement X

B. Non-Revenue Earning Entity (all of the followingare required):

1. Balance Sheet X

2. Summary of Sources and Uses of Funds XC. If applicable (refer to the Loan Agreement):

1. Statement of Expenditure (SOE) X

2. Designated Account Statement XIII. Notes to the Financial Statements XIV. Reconciliation between World Bank andProject records X

V. Management Letter to the Projectimplementation Unit

18