Wake Chatham Harnett Wayne Johnston Sampson Duplin Cumberland Lee I-5986A I-5986B PROJECT BREAKDOWN MAP PROJECTS SCHEDULES AND COSTS ARE ACCURATE AS OF DATE SHOWN I-5986 CUMBERLAND, HARNETT, JOHNSTON COUNTIES I-95 UPDATED - 12/3/2020 μ STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST I 5986A I 95 BUSINESS/US 301 (EXIT 56) TO SR 1002 (LONG BRANCH ROAD EXIT 71). WIDEN TO EIGHT LANES. 6 15.5 UNDER CONSTRUCTION FY 2019 FY 2019 $30,400,000 $265,300,000 I 5986B SR 1002 (LONG BRANCH ROAD EXIT 71) TO I40 (EXIT 81). WIDEN TO EIGHT LANES. 4&6 10.1 LETTING TO BE COMBINED WITH I5878 AND I 5883. FY 2020 FY 2022 $42,100,000 $700,000 $70,800,000 I 5986BA SR 1001 (LONG BRANCH ROAD EXIT 71) TO I40 (EXIT 81). CLEARING FOR UTILITIES. 4 CLEARING FOR UTILITIES FY 2020 $144,000 I 5986C INSTALL BROADBAND FIBER ALONG I95 FROM SOUTH CAROLINA LINE TO VIRGINIA STATE LINE. 1, 4 & 6 LETTING TO BE COMBINED WITH R5777D. FY 2021 $27,667,000

Transcript of μ I-5986 CUMBERLAND, HARNETT, JOHNSTON COUNTIES … Breakdown Maps/I-5986.pdfDec 03, 2020  ·...

Page 1: μ I-5986 CUMBERLAND, HARNETT, JOHNSTON COUNTIES … Breakdown Maps/I-5986.pdfDec 03, 2020  · i-5986 cumberland, harnett, johnston counties updated - 12/3/2020 i-95 μ stip description

Wake

Chatham

Harnett

Moore

Wayne

Johnston

Bladen

Sampson

Duplin

CumberlandLee

I-5986A

I-5986B

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c)OpenStreetMap contributors, and the GIS User Community

PROJECTBREAKDOWN

MAP

PRO

JEC

TS S

CH

EDU

LES

AND

CO

STS

ARE

ACC

UR

ATE

AS O

F D

ATE

SHO

WN

I-5986 CUMBERLAND, HARNETT, JOHNSTON COUNTIESI-95UPDATED - 12/3/2020

μ

STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST

I‐5986AI‐95 BUSINESS/US 301 (EXIT 56) TO SR 1002 (LONG BRANCH  ROAD ‐ EXIT 71). WIDEN TO EIGHT LANES.

6 15.5UNDER 

CONSTRUCTIONFY 2019 FY 2019 $30,400,000 $265,300,000

I‐5986BSR 1002 (LONG BRANCH  ROAD ‐ EXIT 71) TO I‐40 (EXIT 

81).  WIDEN TO EIGHT LANES.4 & 6 10.1

LETTING TO BE COMBINED WITH I‐5878 AND I‐5883.

FY 2020 FY 2022 $42,100,000 $700,000 $70,800,000

I‐5986BASR 1001 (LONG BRANCH  ROAD ‐ EXIT 71) TO I‐40 (EXIT 

81).  CLEARING FOR UTILITIES.4

CLEARING FOR UTILITIES

FY 2020 $144,000

I‐5986CINSTALL BROADBAND FIBER ALONG I‐95 FROM SOUTH CAROLINA LINE TO VIRGINIA STATE LINE.

1, 4 & 6  LETTING TO BE COMBINED 

WITH R‐5777D. FY 2021 $27,667,000