EDAQ meetings NUSTAR DAQ architecture AGATA ancillary detector interface Data rates, etc. HISPEC/DESPEC HISPEC/DESPEC Electronics & Data Electronics & Data Acquisition Acquisition Department of Radiation Sciences nstitutionen för ärn- och partikelfysik epartment of uclear and Particle hysics ox 535 E-751 21 Uppsala weden HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

Transcript of ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates,...

Page 1: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

● EDAQ meetings

● NUSTAR DAQ architecture

● AGATA ancillary detector interface

● Data rates, etc.

HISPEC/DESPECHISPEC/DESPECElectronics & Data Electronics & Data

AcquisitionAcquisition

HISPEC/DESPECHISPEC/DESPECElectronics & Data Electronics & Data

AcquisitionAcquisitionDepartment of

Radiation Sciences

Institutionen förkärn- och partikelfysik

Department ofNuclear and ParticlePhysics

Box 535SE-751 21 UppsalaSweden

HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

Page 2: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

NUSTAR EDAQ related NUSTAR EDAQ related meetingsmeetings

NUSTAR EDAQ related NUSTAR EDAQ related meetingsmeetings

HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

● NUSTAR/SPIRAL2 ASIC meeting, Daresbury, 11-12 July 2005

● FutureDAQ workshop, GSI, 10-11 Oct 2005

● FAIR Front End Electronic Workshop, GSI, 11-13 Oct 2005

Page 3: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

NUSTAR EDAQ related NUSTAR EDAQ related meetingsmeetings

NUSTAR EDAQ related NUSTAR EDAQ related meetingsmeetings

HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

● NUSTAR/SPIRAL2 EDAQ working group meeting, GSI, 27 Jan 2006:

FEE and DAQ for FAIR and SPIRAL2 - looking for common ground, I. Lazarus, Daresbury

Data Acquisition @ GANIL, L. Olivier (hw), F. Saillant (sw), GANIL

Possible Synergy NUSTAR-SPIRAL2 FEE Instrumentation, L. Pollacco, CEA Saclay

A Concept: NUSTAR Slow Control, H.J. Wörtche, KVI Groningen

The NUSTAR facility, H. Simon, GSI

Next meeting at GANIL, 16 Jun 2006

Page 4: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

NUSTAR-DAQ scope

(a) “NUSTAR” DAQ systems: • couple different standalone “NUSTAR” DAQ simply.• foreseeing the necessary interconnects for triggers and control signals • modularity of the system (local triggers / event buffer capabilities )

(i) the systems are synchronized with common trigger(ii) standalone DAQ systems synchronized via timestamps

(b) Front-end electronics (FEE): • For the common NUSTAR DAQ system, specific frontend electronics

together with its digitization part is seen as part of the detector. • Only the control, trigger and data flow will be specified as interface

description by the common NUSTAR DAQ system.(c) Inhomogeneous DAQ systems: • flexibility of the host (here the NUSTAR) DAQ system is mandatory • integration efforts.

Slide by H. Simon, GSI

Page 5: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

RISING “why integration is needed”

Page 6: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Solution with new Time Stamp ModuleTITRIS (developer J. Hoffmann, GSI)

All 3 sub-systems ( GE/VXI, FRS/CATE, HECTOR ) : - run as independent DAQ systems- are triggered independently- produce their own local dead time- provide time stamp for synchronization in all events

Major Requirements of Time Stamp Module:- precision at least 100 ns- bin size 100 ns- 48 bit counter - provide synchronization over distances of at least 50 m between 3 TITRIS modules- VME module providing special daisy chained block transfer for the standard VXI readout

Slide by H. Simon, GSI

Page 7: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Ge (2 x VXI) FRS / CATE Hector

RES

MAN

STR8080

TI

MING

VXI

Event BuilderLynxOS PC

MVME

CPU

D2VB

VME

Time OrderingData Logging

Online Analysis

LynxOS PC

DT32

TCP

Event BuilderLynxOS PC

RIO3

TRIGGER

VMETI

MING

TCP

Event BuilderLynxOS PC

RIO3

TRIGGER

VMETI

MING

TCP

TCP

All sub-systems inside the dashed boxes are able to runas independent MBS systems.

Page 8: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

What should a common DAQ provide ?

• DAQ system: Generalized readout scheme for triggered and ‚triggerless‘ systems, FEE ‚templates‘

• Framework Interoperability between experiments

• Event format Common Analysis Clients

• Taping/Mass Storage

Slide by H. Simon, GSI

Page 9: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

??

FEE, FEC requirements …

• Synchronisation of standalone DAQ systems along the beam line

• Time distribution system (TDS)

• Firmware upload scheme• Slow control• Feedback loops

• Monitoring ! (Increasing complexity, no connectors, …) ??

Slide by H. Simon, GSI

Page 10: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Schematic of a NUSTAR experiment

FEE

Readoutand

time orderdata

NUSTAR ProcessorFarm

CommonNUSTAR DAQ

Data Merge

DataProcessing

“Spy” onFraction Of data

Others…

Detectors

Network to disks, tapes, Grid etc.

Gate

Slow Control PC

NUSTARSlow Control

USBI2CFireWireetc.

Standard networke.g. fibre Ethernet

NUSTAR Timestamp

Experiment

One experiment showing 3 standard interfacesto the NUSTAR Slow Control, Timestamp and DAQ

Slide by I. Lazarus, CCLRC Daresbury

Page 11: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Slide by I. Lazarus, CCLRC Daresbury

Flexibility from standard interfaces

FEE

Readoutand

time orderdata

NUSTAR ProcessorFarm

CommonNUSTAR DAQ

Data Merge

DataProcessing

“Spy” onFraction Of data

Others…

Detectors

Network to disks, tapes, Grid etc

FEE

Detectors

Experiment a (time order data in hardware or DSPs. Send to multiple output streams if necessary to handle high data rate/volume)

Experiment b (low rate, allow processor farm to do time ordering. Note common interface out of FEE and Time Ordering)

Gate

Gate

Optional bypassing of time ordering stage for low rate experiments.The advantage of a common interface standard (e.g. (10)Gbit Fibre)

Page 12: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Possible Synergy● EXL & (R3B)

– DSSD – .1/.5 mm pitch– Si(Li) – 20mm– CsI Calorimeter– .E.E+ToF+PSD

– Beam Tracking (High Ei)

● DiSPEC & HiSPEC– DSSD– Recoil-Decay-Tagging– DE+DE+…+DE+E+?– Position: X & Y– Beam Tracking (Low Ei)

● SPAGA– DSSD – .5mm pitch– Si(Li) – 5mm– CsI Spectrometer– .E.E+ToF+PSD

– Beam Tracking (Low Ei)

● MUSETT II– DSSD– Recoil-Decay-Tagging– DE(Gas).E+ToF– Position: X1,2 & Y1,2

Slide by L. Pollacco, CEA Saclay

Page 13: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Possible Synergy

● R3B – + ACTAR– + TPC

● R3B & EXL– Slow Neutrons

● HiSpec & R3B + AGATA

● ACTAR– +CsI– +DSSD

● SPAGA– Slow Neutron

● AGATA + SPAGA

● AZ4pi– DE.E+PSD+ToF

?

Slide by L. Pollacco, CEA Saclay

Page 14: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

AGAVA AGATA ANCILLARY VME

ADAPTERDeveloped by the AGATA ancillary detector working group (Cracow, Padova, LNL, Daresbury, CEA Saclay, JYFL,...)

– Interface between the ancillary detector electronics/acquisition and the AGATA GTS

– Interaction with the AGATA trigger (GTS) •keep relevant events•reduces the AGATA / ancillary data flow– Provides the GTS event number and clock

AGAVA can be used to connect AGATA to HISPEC!

Based on slides by Ch. Theisen, CEA Saclay

Page 15: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

The AGAVA interfaceHow does it work ?

GTSAncillary

Trigger Request

Val/Rej, Clock, Event Number

Val/Rej : combination of ancillary/Agata :“master”, “slave”, “mixed” modes

Latency times NOT A TRIGGER MODULE !

Slide by Ch. Theisen, CEA Saclay

Page 16: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Ancillary Front-end

VME interface

TriggerRequest

GTS supervisor

AGATA Merge

PSA

Ancillary MergeDATA

Pre-processingAgata promptsignal

Ancillary Readout

Clock counterEvent Number

Val/Rej

Digitizer

Tracking

Data analysis

The AGAVA interface

Slide by Ch. Theisen, CEA Saclay

Page 17: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

The AGAVA interface•Modes

– Common dead time– Parallel-like mode– Trigger-less (TDR)

•Readout – VME– VXI (Euroball-like)

•GTS Mezzanine•I/O

– Trigger request– Val/Rej; Busy– TDR Clock– Ethernet (also for mezzanine)

Slide by Ch. Theisen, CEA Saclay

Prototype ready summer 2006

Page 18: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Data rates: Data rates: HISPECHISPEC

Data rates: Data rates: HISPECHISPEC

HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

AGATA 6660 6 39600 6660 10 240 540 0.1 54 Digital

HYDE 1940 3 5820 3880 10 90 190 0.1 19

LYCCA 1800 3 5400 3600 10 60 130 0.1 13

Plunger 100 3 300 100 2 12 34 0.1 3.4 ?Neutron array 60 10 600 60 4 40 90 0.1 9 Digital

? ? ? ? ? ? ? ? ? ?

TOTAL 10560 51720 14300 382 854 85

Detector sub-system

Total nr of de-tector signals

Nr of pa-

rameters per de-tector signal

Total nr of para-meters

Total nr

of digit-izer

channels needed

Avg nr of detected

gammas or particles per reac-

tion

Avg nr of

para-meters per re-action

Avg nr of bytes per re-action

Max re-action rate

[MHz]

Max data rate

[MB/ s]

Type of FEE

Analog (ASI C)

Analog, Digital

Magnetic spectrometer

Page 19: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Data rates: Data rates: DESPECDESPEC

Data rates: Data rates: DESPECDESPEC

HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

DSSD 4096 4 16384 512 4 64 154 0.01 1.5

1152 7 8064 1152 5 105 270 0.01 2.7 Digital

Fast timing 48 3 144 48 5 15 40 0.01 0.4 ?

120 10 1200 120 2 20 50 0.01 0.5 Digital

60 10 600 60 2 20 50 0.01 0.5 Digital

TAS 16 3 48 16 5 15 40 0.01 0.4 ?

? ? ? ? ? ? ? ? ? ?

TOTAL 5492 26440 1908 219 554 5.5

Detector subsystem

Total nr of de-tector signals

Nr of pa-rameters per de-tector signal

Total nr of para-meters

Total nr of digit-

izer channels needed

Avg nr of detected

gammas or particles per

reaction

Avg nr of paramet-ers per reaction

Avg nr of bytes per re-action

Max re-action rate

[MHz]

Max data rate

[MB/ s]

Type of FEE

Analog (ASI C)

DESPEC gamma

Neutron array: 4π moderation

Neutron array: 1π

TOF

I someric moments

Page 20: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Data rates:Data rates:Beam tracking and Beam tracking and

targettarget

Data rates:Data rates:Beam tracking and Beam tracking and

targettarget

HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

403 3 1209 403 1 21 52 10 520

5 6 30 5 1 6 22 10 220 Digital

TOTAL 408 1239 408 27 74 740

Detect-or sub-system

Total nr of de-tector signals

Nr of pa-

ramet-ers per detec-tor sig-

nal

Total nr of para-meters

Total nr of digit-

izer channels needed

Avg nr of de-tected

gammas or

particles per re-action

Avg nr of

para-meters per re-action

Avg nr of bytes per re-action

Max re-action rate

[MHz]

Max data rate

[MB/ s]

Type of FEE

Beam tracking

and identi-fication

Analog, Digital

Active targets

Page 21: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

HISPEC/DESPEC Electronic HISPEC/DESPEC Electronic LOGbookLOGbook

HISPEC/DESPEC Electronic HISPEC/DESPEC Electronic LOGbookLOGbook

HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

http://www.agata.org/elog/nustar/http://www.agata.org/elog/nustar/

Page 22: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

LoppuLoppuLoppuLoppu

HISPEC/DESPEC meeting, GSI, 21 February 2006 Johan Nyberg

Page 23: ● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.

Ancillary Front-end

VME interface

TriggerRequest

GTS supervisor

AGATA Merge

PSA

Ancillary MergeDATA

Pre-processingAgata prompt signal

Ancillary Readout

Clock counterEvent Number

Val/Rej

Digitizer

Tracking

Data analysis

AGAVA - AGATA ANCILLARY VME ADAPTER

● Interface between the ancillary detector electronics/acquisition and the AGATA GTS● Interaction with the AGATA trigger (GTS)➔keep relevant events➔reduces the AGATA/ancillary data flow

● Provides the GTS event number and clock● Modes:➔Common dead time➔Parallel like mode➔Trigger-less mode (TDR)

● Readout:➔VME➔VXI (EUROBALL like)

Developed by the AGATA ancillary detector working group (Cracow, Padova, LNL, Daresbury, CEA Saclay, JYFL,...)

AGAVA can be used to connect AGATA to HISPEC!

Based on slides by Ch. Theisen, CEA Saclay