CMI Section Meeting, 16 th September 2014 Team - summary of LS1 activities CMI Section Meeting, 16...

17
aw Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

Transcript of CMI Section Meeting, 16 th September 2014 Team - summary of LS1 activities CMI Section Meeting, 16...

Page 1: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

aw Team - summary of LS1 activitiesCMI Section Meeting, 16th September 2014

Anna Chrul (HNINP/CERN)

Page 2: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

II. 18th June 2014 and later… 18th June 2014 – last closure Re-openings/closures of interconnections for NC treatment Other activities (June-August 2014)

I. Short summary of LS1 activities The Team Openings/Closures of W-bellows Safety Relief Valves (DN200) Installation Thermal Screens Upgrade M-bellows Protections Consolidation Other Activities during LS1

Page 3: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

Short summary of LS1 activities

Page 4: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

The Team

Current status (since 1st September 2014): 2 Staff, 9 Collaborators

Max. during LS1: 36 persons (4 Staff, 2 FSU, 30 Collaborators)

2013-03

2013-04

2013-05

2013-06

2013-07

2013-08

2013-09

2013-10

2013-11

2013-12

2014-01

2014-02

2014-03

2014-04

2014-05

2014-06

2014-07

2014-08

2014-09

2014-100

5

10

15

20

25

30

35

Teams size evolution (Collaborators)

WUT NTUA Dubna HNINP

30th June 2014

Page 5: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

The TeamAn

drea

Mus

so

Anna

Chr

ulJose Manuel Gomes De Faria

SRV Activity Leader

DUBNAAlexander Ivanov(Andrei Bazanov)

DN200 Team

Lali Glonti (PH-UAT)Photo Archive

Alain Bastard W Opening & Closure

Activity Leader

NTUA Dimitrios Damianoglou(Kostantinos Razakias)

Team 1

Team 2

Team 3

WUT Michal Strychalski(Jacek Muszynski)

Team 1

Team 2

Team 3Graeme Barlow

Thermal Shields Upgrade Activity Leader

Adel Tebigui (FSU)Benjamin Pellet (FSU)

Page 6: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

W-bellows openingsThe task: 1695 ICs to open regular openings for the train and performed in parallel special openings “on request” + additional re-openings for NC treatment

And

rea M

usso - L

SC

May 1

7th, 20

13

Before: preparation of procedures and dedicated tooling, training on mock up in Bld.180.

The team: Collaborators from NTUA, Athens, GreeceCollaborators from WUT, Wroclaw, PolandCollaborators from JINR, Dubna, Russia+ support of PAEC TeamActivity responsible: Alain Bastard

Page 7: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

W-bellows closures

Quality:in total (based on opened NCR) 22 leaks on W-bellows (1.2%)!

5-6 6-7 7-8 8-1 1-2 2-3 3-4 4-50123456789

W-bellows leaks AO issues

Quality improvement (additional check list)

The task: 1695 ICs to close + 118 ICs to close after re-opening for NC treatment (WISH)

Page 8: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

Safety Relief Valves (DN200) installation

612 missing DN200 installed (sec.23, sec.45 - partially, sec.78, sec.81)

17 DN200 installed on cryo-magnets exchanged during LS12 additional DN200 installed for CryoBLM (sec.45 and sec.78)

The team: Collaborators from JINR Dubna, Russia; Activity responsible: Jose Manuel Gomes de Faria

Page 9: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

Thermal Screens UpgradeIn the dedicated workshop in Bld.183 ~1900 thermal screens sets were upgraded (a clamp installed instead of the welded lyra; hinge, aluminum bride and snap fasteners were added between the upper and lower shield)

The team:2 FSU + support of Dubna TeamActivity responsible: Graeme Barlow

M-bellows Protections Consolidation

~5000 pcs modified in Workshop (SMI2) ~100 pcs considered as radioactive – modified in Workshop Bld.109

~40800 inserts installed!The team:Collaborators from JINR Dubna, Russia; supervisor: Alain Bastard

In the tunnel ~8500 holes were punched in the cryostat’s thermal screens to prepare the installation of upgraded shields.

Page 10: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

Other activities during LS1 Non-standard openings: undulators QBUI.5L4 and QUBI.5R4; QBQM.4R2;

(NTUA, WUT)

Support for CryoBLM installation: QBBI.9R7 and QQBI.9L5 (WUT)

ELQA support (NTUA, WUT) Helium Spill Test in sec.45 (WUT) CRG Group support at Bld.180 (NTUA) Support for RP samples removal in sec.45 (HNINP)

Page 11: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

18th June 2014 and later…

Page 12: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

The last closure of LS1 (sec.45)

18th June 2014Pho

togr

aph:

Max

imili

en B

rice

Page 13: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

Re-openings/closures of interconnections for NC treatment

Since 18th June 2014 86 ICs were opened for NC treatment

69 ICs re-opened for leak detection 14 ICs re-opened for CryoTT fixing 3 ICs re-opened for ELQA

Future activities:

20 ICs to close (sec.34 and sec.45) ? ICs to re-open

sec.12 sec.23 sec.34 sec.45 sec.56 sec.67 sec.78 sec.81

11

22

11

19

13

0

9

1

ICs opened for NC treatment (after 18th June 2014)

Activities Sector 12 Sector 23 Sector 34 Sector 45 Sector 56 Sector 67 Sector 78 Sector 81

CRYO lockout Status UNLOCKED UNLOCKED UNLOCKED UNLOCKED UNLOCKED UNLOCKED UNLOCKED UNLOCKED

SMACC completed Done Done Done Done Done Done Done Done

P test Done Done Done Done Done Done Done Done

Leak loc. Done Done Done Done Done Done Done Done

Purge Done Done Done Done Done Done Done Done

ELQA Done Done Done Done Done Done Done Done

Flushing Done Done Done Done Done Done Done Done

ELQA + nQPS Done Done Done W37 Done Done Done Done

Non Conf Done Done W35-37 W36-39 Done Done Done Done

Cool Down start Done W36 W39 w40 W34 Done W35 Done

https://espace.cern.ch/en-dep-mef-lpc/LS1

Page 14: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

Other activities (June-August 2014)

Support for TE-MPE- installation of already manufactured protective metal covers over the nQPS racks;- manufacture of new covers for all DYPB and DYPQ racks in sector 34;- assembly of crates for containing of the 600A remove test system for the EE systems installed in the tunnel.

Re-organization of Bld.189 (the storage area for cryo-magnets

components)

DN200 cryostats painting

sec.78 – 2 vacuum sub-sectors (21 ICs)sec.45 – all DN200 installed during LS1)sec.34 – 1 ICsec.12 – 1 IC

Production of spare thermal screens (Bld.183)

166 sets of spare upgraded TS stored in SMS18

Activity was finished 17th July

Activity was finished 30th June

Activity in progressActivity in progress (~80% done)

courtesy Michal Strychalski

Page 15: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

CMI Section BBQ

Important Events

Last Closure

BBQ

Moussaka Lunch

cour

tesy

Ala

in B

asta

rd

Photos: T

homas M

antzafinis

Greek Fondue

Bigos Party

Page 16: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

GAB Champions 2013-2014 (Groupe Autonome du Basket)

in Geneva

Important Events

CERN Relay Race 2014, The best Team, Category: Open

Football Cup 2014, First Place

Page 17: CMI Section Meeting, 16 th September 2014  Team - summary of LS1 activities CMI Section Meeting, 16 th September 2014 Anna Chrul (HNINP/CERN)

2014/09/16 CMI Section Meeting

Thank you!