- assembly is proceeding to check possible mechanical flaws 1)Small tilt along z (~2 mm): being...

3
- assembly is proceeding to check possible mechanical flaws 1) Small tilt along z (~2 mm): being investigated, maybe poor quality of the bearing ?
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    215
  • download

    0

Transcript of - assembly is proceeding to check possible mechanical flaws 1)Small tilt along z (~2 mm): being...

Page 1: - assembly is proceeding to check possible mechanical flaws 1)Small tilt along z (~2 mm): being investigated, maybe poor quality of the bearing ?

- assembly is proceeding to check possible mechanical flaws

1) Small tilt along z (~2 mm): being investigated, maybe poor quality of the bearing ?

Page 2: - assembly is proceeding to check possible mechanical flaws 1)Small tilt along z (~2 mm): being investigated, maybe poor quality of the bearing ?

2) Some elements showed magnetic properties

These were notice with a small rare earthsMagnet

The effect is tiny but not easy to quantify

Nonetheless some calculations have beendone by hane (John) and FEA (Holger Witte)Using B-H curves from literature

It seems that we have:a) 2 kgf on the gear wheelb) 25 kgf on the drum

BUT we need to assess the realB-H for the material used 1) SS316 seems much less magnetic than

SS304 after stress relief2) We are sending two samples (SS304/316)

to a lab in Dresden to check mu_r/B-H 3) After which a complete FEA should give us

the answer.4) Probably remachine some parts in SS316

This turned out to be all SS304 parts which underwent a heattreatment (stress relieved orwelded).

SS304 is “non magnetic” steelwhich can assume magneticproperties due to heat (welding)

2 kgf

10 kgf

Page 3: - assembly is proceeding to check possible mechanical flaws 1)Small tilt along z (~2 mm): being investigated, maybe poor quality of the bearing ?

Air system in progress (P. Lau) contacted Tim Hayler for space/air quality requirements in the MICE Hall

Electronics: in progress (M. Dawson, CEG)

Aiming at end of August:a) Complete mechanical b) Complete electronicsc) Merge a)+b)d) Urge a quench test in the solenoid without tracker