Version 2.1
The company "Salavatneftekhimproekt" was founded in 1948 as a branch of "Lengiprogaz". The institute was developing the design documentation for industrial
project of Combine №18 (at present - PAO "Gazprom neftekhim Salavat") and the entire Salavat city. In the following, the Institute reorganized repeatedly, and in 2014 moved
from government holding to sole shareholder.
Business base today is :
About company
2
industrial engineering 3D - engineering civil engineeringindustrial design based on three-dimensional model
design of typical series civilian targets
design of oil refining and petrochemical production
field supervisionconstruction supervision by
performed design
1 – See more on page «History» (Appendix)
Goal and main objectives
3
GOALbe the first and largest regional design engineer
For this purpose we have developed a project management system, production modernization and employee incentive programs (2014-2015 years). This brings us to execute projects in quality and on time.
PROJECT MANAGEMENTTalented managers, with many years' experience, effectively
solve the control problems. Specialized software helps to control the daily progress of
product unloading
EMPLOYEE INCENTIVE PROGRAMME For reasons of motivate the staff, the Company has incentive scheme for employees. We are monitoring of
employee satisfaction by conditions at the workplace, wages and
organizational climate steady
HEAVILY INSTRUMENTATIONWithin modernization was
completed the office conversion and capital repair with a "forklift"
upgrade (purchased graphics workstations, servers, software
and office furniture)
Our advantage
Our advantage is our people. Highly professional technical staff accompanied with well-motivated to professional advancement candidates, young and ambitious graduates
4
High competitiveness is determined by technical equipment and software. We occur in abundance data systems office, to support this highly . The team includes finalists of AVEVA 2015, International Olympiad in 4G, the summer supercomputer academy in Lomonosov Moscow State University. We create industrial visualization, interactive real-time applications, develop 3D simulators, Emergency Response Assistance Plan, 3D models according to the requirements Ministry of Emergency Situations of Russia.
Modern technologiesWe are looking for people with extraordinary thinking
and leadership skills, with enormous potential and extraordinary ability to solve specific problems,
achieve their goals and make a personal contribution to the common cause. Their unconventional approach
to problem solving, provides an opportunity to see options for where can not see the other. This allows
done both a full range of design and engineering work, as well as specific projects (selection of the model
project, feasibility study etc.).
Specific projects
The company welcome degree of technical and chemical sciences. We develop creative activity of young professionals and collaborate with Topchiev Institute of Petrochemical Synthesis, RAS (Moscow). We form patent base of petrochemical industry processes. With one of the latest developments place a requisition on import-substituting Government program.
Scientific potentialExperience and knowledge of the
designers allow us give guarantees and minimize defects. The Company has developed a mentoring system. The team formed by best graduate
of Ufa State Oil University. On the basis of Ufa State Oil University
created common initiative to attract students to practice.
Integrated design
IT
«Salavatneftekhimproekt» keep company with cluster of the oil and gas sector in Bashkortostan
5
Common database
Single point of responsibility
Cluster combines "Salavatneftekhimproekt" and other leading market player of the region in the unified organization.
• cooperate cluster companies on joint project
• building a system of projects monitoring
• solely responsible before clients
It contains information about: • each cluster members
• skills and background • available software
Activities and the role of companies within the cluster is distributed depending on the profile. This allows to provide a full range of engineering services for projects of any complexity and scale.
22 engineering companies
7 000 engineers
~ 10 billion rub /y total revenue
Our team
6
Ufa State Petroleum Technological UniversityPERSONNEL
CAPACITY – 243Average work experience of engineers is 18 years. There are 2 employees with a doctorate (PhD) degree,4 employees with IFP School master degree.
43%
75%
Ufa State Aviation Technical University
Orenburg State University
other technical universities
personPERSONNEL CAPACITY 243comprising:Administration Department 14The management+ accounting department 15IT department 18Commercial department 5Piping and process engineering department 72Sanitary engineering department 14Business development department 2Costing engineering group 5Constriction engineering department 42Technical department 16Electrical engineering department 25
The employee university
3%
9%
45%
25%
Our office
450 workstation(number of employees – 243 person)
2 meeting area( + 1 training class)
7
Reception area
For the design and organization of workstation, we took into account the work features of each group of employees. Comfort and ergonomics have improved performance both design and functionality working groups. On the second floor is the administrative and management personnel with reception area.
Our office is located in a building with an area of 4500 m2 . In the period 2014-2015, we are implementing a modernization program: office block is being reconstructed and capital repaired with a full replacement of fixed assets (purchased new graphics workstations, servers, software, office furniture).
Our office
8
CafeteriaArchives
Technical support
Fire alarm system, security signal system, as well as access control system prevents the entry of unauthorized persons into the territory and allow to keep records of working time. The cafeteria has been organized in office, where employees come during their break with their meal. Also they can play table tennis during the breaks .
In 2014 we bought 200 graphic stations (2 * 24 ', CPU 3,7GHz, 8G RAM, GF760). There are IP telephony, electronic document management and archive in the office. Server equipment provides rapid deployment of resource-intensive workloads. Mobile shelving in the archive gives access to 283 451 units of working documents, calculations, drawings, estimates, expert report on the industrial safety.
Accrediting like clockwork (2014-2015 y)
• JSC «Bashkir soda company»
• LLC «Samaraneftekhimproect»
• JSC «Salavatneftehimremstroy»
• JSC «Rosneft»
• JSC «Gazprom»
• JSC «Gazpromneft»
9• JSC «NGK Slavneft»
• JSC «RussNeft»
• CHSC «Neftegazohimicheskie tehnologii»
• LLP «IK Gazgiproneftetrans»
• LLP «Kazzinc»
• LLP «Tengizchevroil»
• Foster Wheller
• ThyssenKrupp Industrial Solutions
• LLC «GSI-Giprokauchuk»
• UOP Honeywell
• JSC «Stroytransgaz»
• A.V.Topchiev Institute of Petrochemical Synthesis, RAS
High technical equipment has allowed us to obtain accreditation in the companies:
Major projects for 2012-2014
10
153 450 50
Hydrogen Production unit
"Bashneft" "Bashneft-
Novoil"
Production of alkylbenzene,
" Bashneft" "Bashneft-
Novoil"
Unit of regeneration spent sulfuric
acid,"Bashneft" "Bashneft-
Novoil"
Capacity,k t/y
Base project Foster Wheeler DuPont Haldor Topsoe
Unit of reformate
fractionationJSC «Gazprom
neftekhim Salavat»
820
PetroKhimEngineering
Work on hand
Sulfur production
11
Hydrogen production, Pressure Swing Adsorption
Tank battery
Gas compressor station
JSC «Gazprom neftekhim Salavat»
JSC «Gazprom neftekhim Salavat»
JSC «Gazprom neftekhim Salavat»
LLC «RN-Tuapsinskiy NPZ»
Project Client
We have incentives in maximal use of engineering resources. The flexible optimization system of employees number allows us to stretch ultimate load of company (potential influx of
engineers is + 200 pers. to the current personnel).
Work on handJSC «Salavatneftekhimproekt», 2015
12
Hydrogen Production unitProject
JSC «Gazprom neftekhim Salavat», JSC «Gazprom pererabotka»
Client
FOSTER Wheeler Base project
219 000 k м3/yCapacity
Work on handJSC «Salavatneftekhimproekt», 2015
13
Pressure Swing Adsorption unitProject
JSC «Gazprom neftekhim Salavat», JSC «Gazprom pererabotka»
Client
LINDE Base project
219 000 k м3/yCapacity
Steam yield
Major project JSC «Salavatneftekhimproekt», 2014
14
Hydrogen Production unit
Project
JSC «Bashneft»,JSC «Bashneft-Novoil»
Client
Foster WheelerBase project
153 k t/y (purity 99,9 %)Capacity
881-1136 k t /y (pressure - 15 kgf/cm2, temperature - 300 °С)
Major project JSC «Salavatneftekhimproekt», 2014
15
Gas compressor stationProject
LLC «RN-Tuapsinskiy NPZ»,JSC «Rosneft»
Client
70 mln. m3/y (8000 м3/h)Capacity
2 compressor (1611 m3/h) 2 drier (1611 m3/h)4 compressor (3222 m3/h) 2 drier (6444 m3/h)
Makeup:
air compressor building outdoor equipment inside communications -
length 190 m, height -13 / 20 m the network of water pipes and
sewage systems electricity network outdoor lighting network general plan
Designed project consist:
Major project JSC «Salavatneftekhimproekt», staff experience, 2013
16
«Pipe racks «Vostok-Zapad», work-in-progress construction project
Project
PJSC «TATNEFT»Client
• collection and analysis of up-to-date information about technological objects
• improvement of efficient resource utilization of pipe racks
• issuance accurate technical conditions
• informing of employee about structure, parameters and characteristics of technological objects
Completed work
Major project JSC «Salavatneftekhimproekt», 2013
17
Sulfuric acid alkylation unit + sulfuric acid regeneration
Project
JSC «Bashneft», JSC «Bashneft-Novoil»
Client
Sulfuric acid alkylation unit – STRATCO-DuPontSulfuric acid regeneration – Haldor Topsoe A/S
Base project
Sulfuric acid alkylation unit – 450 k t/y (ON = 96)Sulfuric acid regeneration – 180 k t/y
Capacity
Design experience. Hydrogen Production by Foster Wheeler basic design
18
ClientProject Capacity Base project
JSC «Bashneft», JSC «Bashneft-Ufaneftekhim»
Hydrogen Production unit 438 mln m3/y Foster Wheeler
JSC «Bashneft», JSC «Bashneft-Novoil»
Hydrogen Production unit 153 k t/y Foster Wheeler
JSC «Gazprom neftekhim Salavat»
Hydrogen Production unit 219 mln m3/y Foster Wheeler
Reference list. Hydrotreatment, 1/2
19
ClientProject Year made
JSC «SNHRS»Detailed design «Re-equipment. Setting of filters on MDEA
circulation line of process unit GO-4 of production department №11 in petroleum processing plan»
2014
JSC «SNHRS»Detailed design «Re-equipment. Setting raised faced flanged
end on pump pos.CN-13, 14 of process unit GO-2 of production department №9 in petroleum processing plan»
2011
Detailed design «Re-equipment. Setting condensate catcher on steam condensing unit of process unit GO-3» 2011
Detailed design «Re-equipment. Pump change pos. CN-6 of process unit GO-2 of production department №9 in petroleum
processing plant»2011
Detailed design «Re-equipment of process unit GO-4 of production department №11 in petroleum processing plan» 2011
Detailed design «Re-equipment. Pump change pos. CN-5 of process unit GO-2 of production department №9 in petroleum
processing plan»2011
JSC «SNHRS»
JSC «SNHRS»
CJSC «Petrochim Engineering»
JSC «SNHRS»
Detailed design «Re-equipment. Exchange of feed heat exchangers blocks pos.Т-6, Т-7/1, 2, 3, double heat
exchangers pos.Т-6/1 and heat exchanger pos.Т-18 of process unit GO-4 of production department №11 in petroleum
processing plan»
2014JSC «SNHRS»
20
JSC «Gazprom neftekhim Salavat»Detailed design «Re-equipment. Setting closed drain
system of reservoirs unit L-24-6-2 of process unit GO-2 of production department №9 in petroleum processing plan»
2010
JSC «Gazprom neftekhim Salavat»Detailed design «Reconstruction of pipe racks 7 «а» в осях 10-42 of process unit GO-4 of production department №11 in
petroleum processing plan»2005
"Installing the GO-4" Calculations of the recovery boiler on the basis of the recommendations of JSC SEPNU
"Orgneftehimenergo"2005
Detailed design «Work process improvement of exhaust heat boiler KU-201 of process unit GO-4 of production
department №11 in petroleum processing plan»2005
Development of working and design documentation of the complex L-24-21 hydrotreating capacity of 2 mln. t/ y 2005
Detailed design «Translation from water heating system to own heater system by steam condensate установки of
process unit GO-4 of production department №11 in petroleum processing plan»
2005
JSC «Gazprom neftekhim Salavat»
JSC «Gazprom neftekhim Salavat»
JSC «Gazprom neftekhim Salavat»
JSC «Gazprom neftekhim Salavat»
Detailed design «Re-equipment. Displacement of power junction box of process unit GO-2 of production department
№9 in petroleum processing plan»2011JSC «Gazprom neftekhim Salavat»
Reference list. Hydrotreatment, 2/2
ClientProject Year made
Reference list. The primary crude oil processing
211999
2005
2004
1992
1997
2008
2014
2005
2006
JSC “Gazprom neftekhim Salavat”
JSC “Gazprom neftekhim Salavat”
JSC “Gazprom neftekhim Salavat”
JSC “Gazprom neftekhim Salavat”
JSC “Gazprom neftekhim Salavat”
JSC “Gazprom neftekhim Salavat”
JSC "NK"Rosneft" - Novokuibyshevskiy NPZ"
JSC “Bashneft – NOVOIL”
JSC “Gazprom neftekhim Salavat”
Design the Karachaganak gas condensate distillation unit (ADU/VDU 4 MTA) including electric desalting unit
The list of activities for the CDU unit for AVT-4 to existing rules and regulations
Revamping of Crude distillation unit (ADU/VDU) with construction of electric desalting unit
AVT-4. change the binding of heat exchangers heating oil, condensation-refrigerating devices, columns K-1, K-2, K-3
Debottleneck of Crude distillation unit (ADU/VDU) with construction of electric desalting unit
Design of transfer pipes from the furnace P-2 to column K-5 (ADU/VDU) AVT-1
Revamping the crude distillation unit (ADU) AVT-9
Design the Vacuum ejector block of column К-6 (VDU) AVT-4
Conditioning the crude distillation unit (ADU) AVTM-9 to valid authorities regulations
ClientProject Year made
Reference list. Storage plants, 1/2
2010JSC “Gazprom neftekhim Salavat”
2010JSC “Gazprom neftekhim Salavat”
2010JSC “Gazprom neftekhim Salavat”
2006JSC “Bashneft – NOVOIL”
Technical upgrading. Design detail documentation the close drainage system of Storage plants L-24-6-2 (Diesel
hydrotreatment unit)
2010JSC “Gazprom neftekhim Salavat”
2011JSC “Gazprom neftekhim Salavat”
Revamping inhibiter Storage plant
Technical upgrading. Design detail documentation the close drainage system of Storage plants AVT-1, AVT-2, AVT-3
Design detail documentation for tank replacement
Revamping TCC Storage plant 10/32
Technical upgrading. Design detail documentation for remedial action of State Expert Evaluation Department of Russian Federation punch item № 139 26.08.11 Light-oil
products Storage plant “B”
ClientProject Year made
22
Reference list. Storage plants, 2/2
23
Design detail documentation for crude oil
Design detail documentation for LNG
2006JSC «Orenburgneft»Design detail documentation for debottlenecking Pokrovskoy oil treatment plant Storage plant
2005JSC “Gazprom neftekhim Salavat”
2005JSC “Gazprom neftekhim Salavat”
2005JSC “Gazprom neftekhim Salavat”
2005JSC “Gazprom neftekhim Salavat”
2005JSC “Gazprom neftekhim Salavat”
The Karachaganak stable gas condensate storage plant
Reconstruction of vessels Е-2/1, Е-2/2, Е-4/2, Р-1А, Р-3А, Р-1/2, Р-3/2 (park №1) of LNG storage plant
Design detail documentation for gasoline tanks
Design detail documentation for highly-flammable liquid Storage plant of Steam Cracking Unit
The Karachaganak stable gas condensate storage plant 1987JSC “Gazprom neftekhim Salavat”
1988JSC “Gazprom neftekhim Salavat”
ClientProject Year made
Reference list. Flare System Unit
24
Closed gas discharge system of ADUto flare unit 2006JSC “Bashneft – NOVOIL”
Replacement the flare unit 2006"Krasnoleninskiy NPZ" Ltd
Flare System Unit of the visbreaker 2008JSC “Gazprom neftekhim Salavat”
Flare System Unit of EB /Styrene production 2000JSC “Gazprom neftekhim Salavat”
Connect the main pipe to the gas discharge system of refinery units (AD/VDUs, AGFU, TC) 1982JSC “Gazprom neftekhim Salavat”
Flare System Unit of the acetic aldehyde unit 1981JSC “Gazprom neftekhim Salavat”
Flare System Unit of Refinery plant 1978JSC “Gazprom neftekhim Salavat”
ClientProject Year made
25
2008JSC “Bashneft – NOVOIL”The IU of sulfuric acid alkylation and spare sulfuric acid regeneration units
2009JSC “Bashneft – NOVOIL”The IU steam reforming unit
2011JSC “Gazprom neftekhim Salavat” Technical upgrading. Design detail documentation for remedial
action of State Expert Evaluation Department of Russian Federation punch item № 139 26.08.11 of Flare System Unit
2008JSC “Gazprom neftekhim Salavat” Recovery rack № ХI
2011JSC “Gazprom neftekhim Salavat” Recovery rack № 5
2013JSC “Gazprom neftekhim Salavat” The IU of PSA unit
ClientProject Year made
Reference list. Interconnecting utilities (IU), 1/2
Reference list. Interconnecting utilities (IU), 2/2
26
2008JSC “Gazprom neftekhim Salavat” Recovery rack № IV
The IU of the visbreaker 2005JSC “Gazprom neftekhim Salavat”
Recovery racks where new bitumen pipe routing JSC “Gazprom neftekhim Salavat” 2004
2004JSC “Gazprom neftekhim Salavat” Yhe IU of EB /Styrene production
2006JSC “Gazprom neftekhim Salavat” The IU of the HDPE unit
The IU of the automated railway tank loading station for light-oil product
1987JSC “Gazprom neftekhim Salavat”
JSC “Gazprom neftekhim Salavat” Revamping of the loading/unloading station (object № 715 «В») IU
2003
ClientProject Year made
Reference list. Loading/unloading station, 1/2
27
The automated railway tank loading station for light-oil product 2007JSC “Gazprom neftekhim Salavat”
Revamping the loading/unloading station for liquefied gas unit 2004JSC “Gazprom neftekhim Salavat”
2011JSC “Gazprom neftekhim Salavat”
Technical upgrading. Design detail documentation for remedial action of State Expert Evaluation Department of
Russian Federation punch item № 139 26.08.11 the loading/unloading station of refinery Storage plant
2011, 2013JSC “Gazprom neftekhim Salavat” Technical upgrading. The automatized unloading system
USN-150 and loading system UNG 6-100АС-02.04 (object № 715 «В»)
2006JSC “Gazprom neftekhim Salavat” Change-over on light-oil product of the loading/unloading station (object № 715 «В»)
2012JSC “Gazprom neftekhim Salavat” Revamping the loading/unloading station (object № 715
«В») of refinery Storage plant with construction of central control room
ClientProject Year made
Reference list. Loading/unloading station, 2/2
28
The truck tanker loading/unloading station for light-oil product 2003JSC “Gazprom neftekhim Salavat”
The truck tanker and railway tanker loading/unloading station for EB and styrene 2002JSC “Gazprom neftekhim Salavat”
The loading/unloading station of SC unit (EP-300) 1987JSC “Gazprom neftekhim Salavat”
Revamping the loading/unloading station for liquefied gas unit 1985JSC “Gazprom neftekhim Salavat”
2004JSC “Gazprom neftekhim Salavat” Extension of the loading/unloading station (object № 715 «В»)
2003JSC “Gazprom neftekhim Salavat” The truck tanker loading/unloading station for butyl alcohols
ClientProject Year made
Reference list. Pyrolysis projects, 1/2
Installation of the production of benzene. Additional equipment loading rack for loading pyrocondensate 1994JSC «Gazprom neftekhim Salavat»
Reconstruction of a process for producing MTBE. Environmental protection. Forecast consequences of
accidents1999JSC «Gazprom neftekhim Salavat»
29
Calculating the probability of an explosion on gas dehydration skid 2004JSC «Gazprom neftekhim Salavat»
Gas coolers spacing layout of pyrolysis furnace 2008JSC «Gazprom neftekhim Salavat»
Rigging up of the nitrogen system on pyrolysis furnaces 2010JSC «Gazprom neftekhim Salavat»
Replacement of regulating valves for raw materials, fuel, a couple of furnaces 2010JSC «Gazprom neftekhim Salavat»
The project of phased expansion of capacity from "EP-300" to "EP-380". Consulting services 2012-2016JSC «Gazprom neftekhim Salavat»
ClientProject Year made
Emergency response plan JSC «Gazprom neftekhim Salavat» 1992
Conversion unit of pyrolysis condensate to benzene. Commissioning and start-up complex 1993JSC «Gazprom neftekhim Salavat»
Conversion of liquid pyrolysis products. Production of petroleum resins 1989JSC «Gazprom neftekhim Salavat»
JSC «Gazprom neftekhim Salavat»Full design. Off-plot facilities. transfer system 1988
Benzene production. Commissioning and start-up complex 1991JSC «Gazprom neftekhim Salavat»
Production of polymeric petroleum resin (Arsolen) "Pyroplast-2" type. Commissioning and start-up complex 1991
30
JSC «Gazprom neftekhim Salavat»
Reference list. Pyrolysis projects, 2/2
ClientProject Year made
31
The complex of ethylbenzene and styrene. Inside communications 2005JSC «Gazprom neftekhim Salavat»
High-density polyethylene production. Commissioning and start-up complex 2010JSC «Gazprom neftekhim Salavat»
High-density polyethylene production. Chemical store 2007JSC «Gazprom neftekhim Salavat»
High-density polyethylene production. Nitrogen purification unit for butene containers in product shipping department of
«Monomer» plant2008JSC «Gazprom neftekhim Salavat»
The complex of ethylbenzene and styrene. Quantitative assessment of explosion hazard of technological objects
(butyl alcohol park, benzene park) 2007JSC «Gazprom neftekhim Salavat»
High-density polyethylene production . In-plant recirculation block by using cooling tower of «GEA» company 2008JSC «Gazprom neftekhim Salavat»
High-density polyethylene production. Off-plot facilities, transfer system 2010JSC «Gazprom neftekhim Salavat»
Reference list. Production of high/low - pressure polyethylene, butyl alcohol, ethylbenzene and styrene, 1/2
ClientProject Year made
Butyl alcohol production. Off-plot facilities 1982JSC «Gazprom neftekhim Salavat»
The complex of ethylbenzene and styrene. Off-plot facilities, transfer system 2004JSC «Gazprom neftekhim Salavat»
32
The complex of ethylbenzene and styrene. Butyl alcohol and HFL park. Ethylbenzene and styrene park. Midline park 1999JSC «Gazprom neftekhim Salavat»
Replacing the storage tanks of styrene in HFL park 1999JSC «Gazprom neftekhim Salavat»
The complex of ethylbenzene and styrene. Washing and steaming station. Sewage disposal plant 2002JSC «Gazprom neftekhim Salavat»
The complex of ethylbenzene and styrene. Emergency Response Assistance Plan 2004JSC «Gazprom neftekhim Salavat»
Reference list. Production of high/low - pressure polyethylene, butyl alcohol, ethylbenzene and styrene, 2/2
ClientProject Year made
We execute general designer functions for:
33
JSC «Bashneft», «Bashneft - Ufaneftehim»
ООО «Novo-Salavatskaya TEC»
JSC «Bashneft», «Bashneft – NOVOIL»
JSC «Orenburgneft»
JSC «SMP-neftegaz»
«Krasnoleninskiy NPZ» Ltd
JSC «Gazprom neftekhim Salavat»
JSC «Salavatneftehimremstroy»
3D potential
35
Technical support allows us to work with different projects grade
Basic software solution
Software has been set up on a 200 new graphic stations. Server equipment provides
rapid deployment of resource-intensive workloads.
Graphic stations
The development of three-dimensional model is carried out on all itineraries of design
Blanket cover
Tridimensional design• 15 licenses of AVEVA PDMS• concurrent working about 50 engineers
Fabrication and detailing all steel structures – faster and with better quality
The system of environmental calculation programs:• ecology• waste, noise• varnish-and-paint finish, welding, inventory, metalworking
The system of calculation of pipelines and equipment• Start - calculation of durability and rigidity of pipelines• Stars - calculation of thermal properties and phase
equilibrium composition of substances• Gidrosistema - thermal and hydraulic calculations• Passat - calculation of the strength and stability of vessels
and apparatuses• Izolyatsiya - calculation and selection of insulation
materials• Predklapan - calculation and selection of safety valves
AVEVA PDMS
TEKLA
Design-basis program of «Integral» company
Design-basis program of «NTP Truboprovod»
01
02
03
3D-model of production in the PDMS AVEVA contain a maximum of necessary information
36
Isolation
Estimate documents
Reports (custom specifications,
equipment schedule, etc.)
Isometric drawings
Calculation of durability and
rigidity of pipelinesProcess
engineering
Equipment templates
3D-model access is everywhere and at all times
3D models in the systems of TEKLA Structures with PDMS AVEVA eliminate clashes
37
3D-MODEL
DATA INUnits base, stencil of typical construction
DATA OUTdrawings, specifications, statements, reports
the generation and management of output data packets, which involved in the manufacture of components, provide the maximum accuracy to materialize engineer brainchild to ready industrial object
on the basis of three-dimensional model is carried out automated production of drawings and reports. Storage information in a single database ensures consistency between drawings, reports and 3D data
Clash control and error detection on the start-up design period (before construction stage) - reduce financial costs. Visual display the progress of construction and installation work
contributes to the effective management of the construction of facilities within the established calendar dates and amounts of funding
Application of 3D models on the construction phase
38
Application of 3D-models can significantly facilitate the work of specialists at the construction and operational stage
Advantage
If available construction schedule
• eliminating clashes prior to construction
• a visual representation of the design solution
• navigation on the project with the possibility of information obtaining
• publication of isometric drawing
• communication organization of schedule with three-dimensional model
• modeling the course of construction work
• monitoring of the construction process
The ability to create on the basis model of electronic archive, "binding" of detailed design and as-built documentation to model elements. Providing specialist of interested organization by information about the structure, parameters and characteristics of technological objects
Application of 3D models on PLC operation phase
39
EfficiencyThe possibility of operational decision-making and the provision of input data in modernization
Real time access
MonitoringCollection and analysis of current information about technological objects
Staff trainingCreating interactive 3D models for visualization of operation and maintenance of technological object
Three-dimensional simulation
40
ERAP
Hazardous Facility as required by EMERCOM1
FAS and Preventive Maintenance
training devices
We are developing a three-dimensional applications, and video presentations for staff training. In the simulator, our specialists simulate various emergency situations in the workplace. The training simulates the consequences of wrong actions of trainees. Use simulators in the course of training, advanced training and monitoring skills of employees. This will reduce the risk of accidents due the human factor.
We simulate possible emergency situations and visualize them on the 3D model. The integration 3D models of ERAP1, Hazardous Facility, FAS1 and Preventive Maintenance allows to organize joint work of the various groups of users in the event of occurrence, localization and liquidation of emergency situations. Use simulations for quick and coordinated work of the staff, the speedy elimination of accidents and minimizing their consequences.
1 – ERAP – Emergency Response Assistance Plan , FAS – fire alarm system, EMERCOM - Ministry of the Russian Federation for Civil Defense
3D potential in EPC-projects
41
Present
Future
4D = 3D model + time characteristic scheduling of installation and construction
works in the Primavera link of installation and construction works
schedule with 3D model integration and visualization of data in the
information system monitoring of the construction process preparation of reports (including video reports)
5D = 4D model + project costs analysis of the balance of the resource loading assessment value of work done price optimization of the project
Information-technology solutions based on 3D models allow to implement large-scale
investment projects and shorten the timeline to completion of the project
Implementation of these models may not only in the EPC-projects. This will require the
engagement and participation of the Customer
Russian Federation 123290,Moscow, Pervyiy Magistralnyiy tupik, 5A, Business centre «Magistral-plaza»
Keyword here Keyword here
Contacts
42
www.snhpro.ru
Russian Federation 453259,Salavat, Gagarinа street, 8
8 800 500 75 85
Appendix
Monitoring and evaluation effectiveness of the unit
Industrial design. Participation in stages
44
Feasibility study and selection of the model
projectSelecting licensor Detail project and State
Expert Evaluation Dept
On-site designer supervision
Procurement of equipment
Post-investment monitoringBase project
Justification of the project's compliance strategytechnological solutionsPreliminary assessment of the capital costsEstimation of the economyThe estimation of the implementation
Development of a model of the project (either alone or with the assistance of EPC / EPCM)
Development and approval of the structure of the software
Development and approval of the terms of reference to licensors
Analysis of availability of energy, raw materials and infrastructure
The choice of the licensor and the analysis of the original data or the base project
Clarifying assumptions of feasibility study including the economy and capital investments
Getting licensors authority to support the development of the basic design
Development of the basic engineering, including: • Filling up data sheets • Providing clarification • Regular monitoring of
the work of of the licensor
Development of the general plan of project realization (level L3)
The choice of technology and coordination of critical equipment
Clarification of the size of the economy and capital costs of the project
Detailization of plan of processing / sale of products
Formation of the list of possible suppliers and contractors
Performance optimization
Development of detail project for industrial buildings and structures of power plants, construction materials industry enterprises, enterprises engaged in environmental protection and environmental management (landfills, gas purification plants, sewage), road transport enterprises
Development of commissioning and start-up
Reporting and monitoring of project implementation
Project support in State Expert Evaluation Department
Providing of planned indicators + development of measures to increase efficiency
Development of special sections of project documentation: a list of measures to protect the environment, Environmental impact assessment, a list of measures for civil defense measures for the prevention of natural and man-made, the declaration of industrial safety of hazardous production facilities, fire safety declaration, the project construction organization;
Development of operational documents: plans for oil spill response, emergency response plans, technological rules
Development of technical projects for non-standard equipment
Development of projects - sanitary protection zones, the maximum permissible emissions, standards for waste and limits on their placing
History
45
1948
The Institute was founded to design the new huge petrochemical complex
JSC “Gazprom neftekhim Salavat” (previously JSC "Salavatnefteorgsintez")
and employee city SalavatThe branch of «Lengiprogaz»
Foundation
1974
The SNHP became branch of
«Bashgiproneftekhim»
Re-engineering
1992
Privatization of the SNHP
Re-engineering
2014
The SNHP became Joint stock company
Re-engineering
2015
The SNHP became Public Joint stock company
Re-engineering