v52-34
2011 Apegga Survey
16 - Section 14 - Capital Cost
License Agreement
Capital Investment and Drilling.pdf
EPC_Project_Interdepency and Work Flow (1).pdf
2013-03-19-InternationalLPGSeminar.pdf
WinterRel06-AmeriGas.pdf
When Models Fail.pdf
Argus-NGL-Americas.pdf
Asia Olefins & Aromatics Market Review and Outlook 2014.pdf
Kinetic Model and Simulation Analysis for Propane Dehydrogenation in an Industrial Moving Bed Reactor
Estimate water hammer loads.pdf
91015X5C.PDF
Capital Cost Estimate Class 3 -Onshore Guideline
Chemical Processing - March 2008 - Achieve Effective Heat Exchanger Control.pdf
Avoid Condensation-Induced Transient Pressure Waves
The future.pdf
Close Attention to ACCs During Commissioning Pays Dividends.pdf
Understanding-Engineering-Design.pdf