GuideExamplesforDesignofConcreteReinforcedwithFRPBars
Casillas Reales. Ajedrez con Mijail Tal (2009) - Libro. Juan Sebastian Morgado (82)
Funciones de Celadores - Temario (4)
An Investigation of Stress Wave Propagation Through Rock Joints and Rock Masses (2010) - Thesis (327)
Análise de Estab e Recalques de Um Aterro Sobre Solo Mole. Estudo de Caso - Paper (18)
A Quantitative Analysis of the Implementation of the Last Planner System in Brazil - Paper (8)
Achieving Rapid Construction Using Lean Principles - Paper (9)
Advances in Laboratory Geophysics Using Bender Elements (2006) - Thesis (382)
A Survey on the Last Planner. Impacts & Difficultues for Implementation in Brazilian Companies - Paper (11)
2D FEM Analysis of Earth & Rockfill Dams Under Seismic Condition (2010) - Paper (12)
Thesis - Hard Binding Copy
Thesis Final Report Ravi Printed-libre
wangguanglun313237-200809-5
Barlish_asu_0010N_10983
bimwhitepaper11909-12628709628602-phpapp02
CIB Salford Building Information Modelling Literature Review on Model to Determine the Level of Uptake by Organisation
Cib2008_ranking Construction Project Characteristics
Last Planner en Mejoramiento de Construcción Aporticada. Lean Construction (2007) - Informe de Práctica (107)
BIMGuidelines VS1!6!2012
Chess Informant - Beliavsky & Mikhalchishin - Defensa Siciliana (B88)