XNORTEL NodeB Commissioning (12010)

Connection NodeB <-> PC (TIL Connection)

Connect Ethernet Cable (Cross) from PC to Port 2 CCM/iCCM at NodeB side

Set the IP address in PC

Open Internet Explorer and type address as below:

 Type in username and path.

Username is the login name for windowsPath is where the log file want to be stored

For the 1st time connection please follow the procedure as seen on the

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 2/19

For the 1 time connection please follow the procedure as seen on the

Software Download

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 3/19

Activate the new software: Activation and iBTS reset

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 4/19

Make sure the new software version activated

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 5/19

Acknowledge pop-up window as below

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 6/19

Acknowledge the 2 warning window by pressing OK 

BTS Re-connection

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 7/19

Change I&C parameter

Go to BTS

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 8/19

Click on button Send to iBTS

If pop window like below appear, just press YES

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 9/19

Acknowledge the 2 warning window by pressing OK 

BTS Re-connection

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 10/19

Check MS (MCA Status LED display) is green, if not or KO apply themaintenance operation.

Visually check that the information contained in the TIL board’s screencomplies with the BTS configuration:• Using information displayed at the bottom of the screen (refer to Figure 35):

• Check the Software Reference• Check the BTS type• Verify that the Serial Number is the same as the Serial Number given insection 2 of the report sheet

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 11/19

Example of TIL Screen

For TRM and CEM, check that:• SB (StandBy state) status is orange (board is in cold stand-by)

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 12/19

 This name must be equal to old_<NeId>.til with NeId=Serial Number of theBTS.

 As eg below old_451282.til

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 13/19

Change the I&C for PCM&IMA as below:

Click send to iBTS button

Change the I&C for IP Address. Refer to CIQ, below is an example :

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 14/19

Change site data. Refer to CIQ

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 15/19

Save I&C (new). This name must be equal to new_<NeId>.til with NeId=Serial Number of the

BTS.  As eg below new_451282.til 

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 16/19

BTS Re-connection

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 17/19

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 18/19

ICCM-EMOAM>BTS--------------------------------------------- Packaging -------------------------------------------------iBTS : Indoor (600mm) | | | | | | | | | | | | |

Logical slot | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |Physical slot | _ | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | __ | 10 || | | | | | | | | | | | |

------------------------------------------- Configuration -----------------------------------------------Radio Mode ............................ Unknown (STR1)

EXT ATM CONN .......................... NOT CREATEDNODEBCP ASU ........................... DISCONNECTED (connected)

OMCB ................................. DISCONNECTED (connected)

MIBState .............................. NOT BUILD (BUILD)

Flip-Flop ............................. Not actifVersion ............................... UNB04D220A0DDM master ............................ None (No DLU)

---------------------------------------- Hardware Snapshot ----------------------------------------------Slot | Type | HwRel | Serial Number | PEC | Module Name

5 | iCCM | 01 | NNTM75061N1T | NTUM25CS | MOD:ICCM2BOARD---------------------------------------------------------------------------------------------------------

3 | iTRM | 01 | NNTM75061LAQ | NTUM17AF | MOD:ITRM21007 | iCEM128 | 01 | NNTM75061LSK | NTUM00DG | MOD:ICEM21288 | iCEM128 | 01 | NNTM75061HS0 | NTUM00DG | MOD:ICEM2128

---------------------------------------------------------------------------------------------------------12 | GPSAM | 01 | NNTM75061K7V | NTUM24AF | MOD:GPSAM

---------------------------------------------------------------------------------------------------------0 | DDM | 01 | FORM03008924 | NTU747AF | MOD:DDM32100UMTS1 | DDM | 01 | FORM03008726 | NTU747AF | MOD:DDM32100UMTS2 | DDM | 01 | FORM03009020 | NTU747AF | MOD:DDM32100UMTS

------------------------------------ Slaves State management --------------------------------------------Slot | Type | Soft | Hard | Admin | ConfStat | OpState | UTime | L3 Connected

3 | iTRM | Soft ok | Disable | Unlocked | Config ok | Disable | XXXXXXXXX | L3 complete

7 | iCEM128 | Soft ok | Enable | Unlocked | Config ok | Enable | Synchro | L3 complete8 | iCEM128 | Soft ok | Enable | Unlocked | Config ok | Enable | Synchro | L3 complete

--------------------------------- OAM CallP and ATM Configuration ---------------------------------------Slot | Type | Declared To Callp | CCP AAL5 | AAL2 (0) | AAL2 (1) | AtmHandle

3 | iTRM | Not Declared | None | None | None | 0x10177 | iCEM128 | Not Declared | 0xffffffff | 0xffffffff | 0xffffffff | 0x10188 | iCEM128 | Not Declared | 0xffffffff | 0xffffffff | 0xffffffff | 0x1019

---------------------------------------- RF LINK Configuration ------------------------------------------Slot | Type | LHP reserve | FwdCemToAdder | FwdAdderToTrm | RvCemToTrm

3 | iTRM | YES | XXXXXXXXXXXXXXXXXXXXXXX | NO | NO

8/6/2019 XNORTEL NodeB Commissioning Procedure

http://slidepdf.com/reader/full/xnortel-nodeb-commissioning-procedure 19/19

7 | iCEM128 | YES | NO | XXXXXXXXXXXXXXXXXXXXX | NO8 | iCEM128 | YES | NO | XXXXXXXXXXXXXXXXXXXXX | NO

------------------------------------------- CCP informations --------------------------------------------Slot | Type | CCP Allocated | CCP State | CCP Status

7 | iCEM128 | XXXXXXXXXXXXXXXXXX | DISABLE | NOT ALLOC8 | iCEM128 | XXXXXXXXXXXXXXXXXX | DISABLE | NOT ALLOC

------------------------------------------- CEM BBUs Load Configuration ---------------------------------Slot | Type | BBU0 | BBU1

| | requested | current | requested | current7 | iCEM128 | UNKNOWN | DCH | UNKNOWN | DCH8 | iCEM128 | UNKNOWN | DCH | UNKNOWN | DCH

---------------------------------------------------------------------------------------------------------Cell Mapping not available in not built BTS !RF Cabling not available in not built BTS !

+-------------------------------------------------------------------------------+| Tx Propagation Delay |+-------------------------------------------------------------------------------+

| Local Cell Id | Ccm | Trm | Pa | Tx Splitter | Ddm | RFoutput to Antenna |+-------------------------------------------------------------------------------++-------------------------------------------------------------------------------+| Rx Propagation Delay |+-------------------------------------------------------------------------------+| Local Cell Id | Ccm | Trm | Ddm | Antenna To RFinput |+-------------------------------------------------------------------------------++-------------------------------------------------------------------------------+| Tx and Rx Total Propagation Delay |+-------------------------------------------------------------------------------+| Local Cell Id | Dl Main | Dl Div | Ul Main/Div | Local Cell State |+-------------------------------------------------------------------------------++-------------------------------------------------------------------------------+| Cell Delay Propagation Send to Cem State |

+-------------------------------------------------------------------------------+| Cem Slot | Local Cell Id | CellDelaySentToCem |+-------------------------------------------------------------------------------++-------------------------------------------------------------------------------+ICCM-EMOAM>________________________________________________________________________________________________