WATERVIEW CONNECTION PROJECT

WATERVIEW CONNECTION TEAM

SH16 Constructability

Aly Gleeson – Design Manager

CONSTRUCTABILITY FUNDAMENTALS

o Maintain existing number of traffic lanes during peak hour traffic

o Maintain pedestrian and cycle movement through the project area

o Bus shoulder movement to be maintained where possible

o Actively manage all works to meet daily & seasonal traffic conditions

o Maintain services such as Power, Water, Telecom etc…

o Minimise noise during works

o Safety

KEY CONSTRUCTION ELEMENTS

1. Stormwater Treatment -Wetland

2. Te Atatu Interchange

3. Whau Bridge Widening

4. Patiki Cycle Bridge

5. Causeway Construction

6. Causeway Bridge Widening

12

3

465

STORMWATER TREATMENT - WETLAND

TE ATATU INTERCHANGE

Site Compound

TE ATATU BRIDGES

WHAU BRIDGE

Te Atatu Interchange

City

CAUSEWAY CONSTRUCTION

GROUND IMPROVEMENTS – STAGE 1

GROUND IMPROVEMENTS – STAGE 2

Stage 3

POSSIBLE GROUND IMPROVEMENTS

GROUND IMPROVEMENTS – STAGE 3

Stage 4

CAUSEWAY CONSTRUCTION – PHASE 1

CAUSEWAY CONSTRUCTION – PHASE 2

CAUSEWAY CONSTRUCTION – PHASE 3

CAUSEWAY CONSTRUCTION – PHASE 4

CAUSEWAY CONSTRUCTION – PHASE 5

CAUSEWAY CONSTRUCTION – PHASE 6

QUESTIONS