Water Street Promenade Engineering and Design ServicesJuly 16,2014
Education / Infrastructure / InnovationNovember 6, 2014
Reconstruction of Route 97Haverhill, MA
Presented ByChrister Ericsson, PE
Joseph Johnson, PE, PTOE
Agenda:• Project Limits• Tentative Schedule• What do I see…• What can be done…• What did I miss…What are your thoughts…
Project Limits
Silver Birch Lane
Research Drive
Tentative Schedule:• 25% Design – Winter 2014/2015• 25% Design Public Hearing – Fall 2015• 75% Design – Winter 2015/2016• 100% Design – Fall 2016• Final Submission – Winter 2016/2017• Construction Fall 2017 – Fall 2019
What do I see…
TrafficVolume• 13k to 18k ADT
Speed• Exceed Posted
What do I see…
Pavement
AccessibilityIssues
What do I see…
What do I see…Accessibility
Issues
What do I see…
Delay…45 seconds of it…
What do I see…Safety
Concerns
Crash RateHigher than Statewide and
District‐wide Average
What do I see…SafetyConcerns
What do I see…
SafetyConcerns
What do I see…
Neighborhoods!
What do I see…
Disconnect
What can be done…
Traffic• Volume• SpeedPavement
What can be done…
Accessibility
What can be done…
Disconnect Connect
What can be done…
Disconnect Connect
What can be done…Delay/Safety
Lake St
What can be done…Delay/Safety
Forest St
What can be done…Welcome to our neighborhood!
What can be done…Welcome to our neighborhood!
What can be done…Welcome to our neighborhood!
What can be done…Welcome to our neighborhood!
What can be done…Welcome to our neighborhood!
What can be done…Welcome to our neighborhood!
What can be done…Welcome to our neighborhood!
What can be done…Welcome to our neighborhood!
What can be done…Welcome to our neighborhood!
What did I miss…What are your thoughts…