ACG Commissioning Guideline Appendix D
Appendix D
Sample Functional Performance Test Checklists
NOTES TO APPENDIX D
This appendix contains sample functional performance test checklists for a number ofcommonly used HVAC systems. The information for each system includes the following:1. a description of the system including its ma!or components
". a table showing all modes of operation with the status or position of key
e#uipment in each mode$. a se#uence of operations and
%. the functional performance test checklist that corresponds to the preceding
information.
There is no intention in the appendix to pro&ide sample checklists for all possible systems
included in any design. These checklists are intended to pro&ide basic information about
each system so that the functional performance test checklists will logically follow fromit and they will illustrate a le&el of detail that is appropriate in good commissioning
practice and to suggest a practical format.
The sample functional performance test checklists are generic' thus they do not apply to
any specific pro!ect and so the list of test items is generic not specific. Commissioning
agencies must de&elop functional performance test checklists for e&ery system includedwithin the scope of any commissioning pro!ect and those checklists must include e&ery
mode of operation and se#uence of operation co&ering normal abnormal and emergency
conditions that could occur in the specific design.
There is a Table of Contents on the next page listing the sample checklists included in
this appendix.
AC( assumes no responsibility for how the material in this Appendix might be utili)ed
by users of the (uideline' the users assume full responsibility for any and all liability that
may arise from any reference to or use of this material.
*age +,1
8/18/2019 Water Pump Function
2/34
ACG Commissioning Guideline Appendix D
TABLE OF CONTENTS
Chilled -ater ystem..................................................................................................+,%
-ater /oop Heat *ump ystem................................................................................+,10
ake,up Air and 2xhaust ystem.............................................................................+,"3
*ackaged 4ooftop (as Heat5+6 Cool ystem.........................................................+,"$
Variable Air Volume ystem.....................................................................................+,"7
*age +,"
8/18/2019 Water Pump Function
3/34
CHILLED WATER SYSTEM
8T2 +2C49*T9;
The chilled water system is typical of one that may be installed in a large office building.
The system consists of:♦ $ chillers CH,1 through CH,$. Chiller CH,1 is smaller than CH," and CH,$.
♦ 1 plate heat exchanger H2,1. 9t is located between the condenser water system
*,13
♦ A modulating chilled water bypass &al&e controls the differential pressure across
the supply and return piping.
The chilled water distribution system ser&es cooling coils in air handling units. The
system has the following modes of operation:
♦ hutdown
♦ ff
♦ tart,up
♦ Bree cooling
8/18/2019 Water Pump Function
4/34
CHILLED WATER SYSTEM
+2 B *24AT9;
Shutdown Off Start-u Fr!! Coo"#n$Ch#""!r
%o&!rr#d!'
Ch#""!r
%o((u#!d'
P-)
8/18/2019 Water Pump Function
5/34
CHILLED WATER SYSTEM
2D2;C2 B *24AT9;
.1 This se#uence to be read in con!unction with the control drawings and points list.
." The ++C system shall determine when the chillers are to operate based on a
building demand program by monitoring the &arious space temperatures as wellas the outdoor air temperature.
.$ Heat exchanger H2,1 shall be initiated as the source of chilled water when the
outdoor air is cold enough to permit this. The ++C system shall start therespecti&e chilled water pump and cycle the condenser water pumps and the
cooling tower fans in stages in order to maintain the chilled water supply
temperature setpoint of %%EB.
8/18/2019 Water Pump Function
6/34
CHILLED WATER SYSTEM
.1% The ++C system shall modulate the pressure bypass &al&e between the CH-line and the CH-4 line based on the difference between the two as sensed by a
differential pressure transducer in order to maintain water flow through the
chillers and H2,1 at all times. The differential pressure setpoint shall be changedto suit the chilled water pump operating at the time.
.10 The ++C system shall cycle the cooling tower fans in se#uence as re#uired to
maintain the condenser water supply temperature set point. This set point is to beinitially set at @3EB but shall be confirmed with the chiller manufacturer to ensure
maximum chiller efficiency is maintained and no surging takes place.
.1? The ++C system shall monitor the cooling tower fansF current draw and shall
annunciate an alarm upon a fan failure..17 ++C system shall pro&ide a 10 second time delay before the low speed is
energi)ed when switching from high speed to low speed fan operation.
.1@ The ++C system shall monitor a sump water le&el switch in each cooling tower.The ++C system shall open the two way water make up &al&e located in the
Gasement echanical 4oom when the water le&el is below normal. The &al&e
shall close when the desired water le&el is reached..1 The ++C system shall monitor the current draw of the Cooling Tower Biltration
pump and annunciate an alarm upon pump failure.
*age +,?
8/18/2019 Water Pump Function
7/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
CHILLED WATER SYSTEM
SE;9ENCE OF OPERATION<PASS
FAILNOTE
Shutdown =od!< %h!at#n$ on"5 4!a4on'
− *lace the system into a seasonal shutdown modeI by manual command.
− Confirm that all 13 pumps
8/18/2019 Water Pump Function
8/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
CHILLED WATER SYSTEM
SE;9ENCE OF OPERATION<PASS
FAILNOTE
Start-u =od!<
− This mode applies when the building is occupied
8/18/2019 Water Pump Function
9/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
CHILLED WATER SYSTEM
SE;9ENCE OF OPERATION< Cont#nu!d PASSFAIL
NOTE
+ecreasing /oad:
− -hen C- temp Q
8/18/2019 Water Pump Function
10/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
CHILLED WATER SYSTEM
SE;9ENCE OF OPERATION< Cont#nu!dPASS
FAILNOTE
Fr!! (oo"#n$ =od! > thru h!at !?(han$!r< %o((u#!d or o&!rr#d! =od!4' %on(! !r da5'
− -hen A temp
8/18/2019 Water Pump Function
11/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
CHILLED WATER SYSTEM
SE;9ENCE OF OPERATION< Cont#nu!dPASS
FAILNOTE
Condensing water operation J decreasing cooling load:
− 4ele&ant when CH- temp stays below setpoint P 1.0EB
− -hen CH- temp Q
8/18/2019 Water Pump Function
12/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
CHILLED WATER SYSTEM
SE;9ENCE OF OPERATION< Cont#nu!dPASS
FAILNOTE
Ch#""!r =od! %o((u#!d =od!'
− e#uence written with CH," as lead chiller CH,$ as lag chiller
− Temper *,13 hardwire start from CH,$.
− CH,$
8/18/2019 Water Pump Function
13/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
CHILLED WATER SYSTEM
SE;9ENCE OF OPERATION< Cont#nu!dPASS
FAILNOTE
Check operation of:
− +aily ++C alternation of lead5lag CH,"$
8/18/2019 Water Pump Function
14/34
WATER LOOP HEAT P9MP SYSTEM
8T2 +2C49*T9;
The water loop heat pump system is typical of one that may be installed in retail
commercial or office buildings. 2ach ceiling,space mounted heat pump ser&es a specific)one of the building.
The system consists of water loop piping throughout the building with:
♦ water loop temperature control panel
8/18/2019 Water Pump Function
15/34
WATER LOOP HEAT P9MP SYSTEM
H!at Pu=4
Off %Shutdown' Start-u No d!=and H!at#n$ Coo"#n$
Fan ff n n n nCo=r!44or ff ff ff n n
R!&!r4#n$ 6a"&! , , , Heat Cool
2D2;C2 B *24AT9;
1.1 A9; -AT24 /*
."3 The main water loop circulates water "%57.
."1 The main water loop circulation pumps operate on a lead5lag5backup basis.
."" The packaged heat re!ecter shall be enabled from the main water loop controller based on the loop heat re!ection demand as sensed by the main water loop return
water temperature sensor. The local packaged heat re!ecter controls shall operatethe damper fan and spray pump to maintain setpoint as determined
8/18/2019 Water Pump Function
16/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
WATER LOOP HEAT P9MP SYSTEM
SE;9ENCE OF OPERATION<PASS
FAIL
NOTE
MAIN WATER LOOP
Start u =od!<
− 9nitiate water,loop circulation ++C start,up se#uence with *," as lead pump.
− Confirm that *," starts and runs.
− Confirm that water,loop flow switch confirms flow
8/18/2019 Water Pump Function
17/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
WATER LOOP HEAT P9MP SYSTEM
SE;9ENCE OF OPERATION<PASS
FAIL
NOTE
MAIN WATER LOOP %(ont@d'
Coo"#n$ =od!<
− Applies when water loop return temp.
8/18/2019 Water Pump Function
18/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
WATER LOOP HEAT P9MP SYSTEM
SE;9ENCE OF OPERATION< Cont#nu!d
H!at Pu=4< %(ont#nu!d'
Heat
*ump
9+
/ocationH*
n5ff
Ban
Auto5;
T+
*rogram
Heating Cooling
-ater,side Air,side -ater,side Air,side
9nlet utlet 9nlet utlet 9nlet utlet 9nlet utlet
Comments:
*age +,1@
Checks performed by: +ate: print name signature
*4M2CT:
ystem: /ocation:
Area er&ed: 2#uipment:
8/18/2019 Water Pump Function
19/34
MA:E-9P AIR AND EXHA9ST SYSTEM
8T2 +2C49*T9;
This make,up air and exhaust system is typical of one that may be installed in a
commercial5industrial building ser&ing a specific area of the building where there is aneed to supply 133K outside air to balance a significant exhaust air re#uirement.
2xamples of this are industrial shops kitchens boiler rooms etc.
The system consists of:
♦ ceiling mounted supply fan
8/18/2019 Water Pump Function
20/34
MA:E-9P AIR AND EXHA9ST SYSTEM
2D2;C2 B *24AT9;
1.1 CCD*92+ +2." ccupied mode shall be determined by the time,of,day
8/18/2019 Water Pump Function
21/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
MA:E-9P AIR AND EXHA9ST SYSTEM
SE;9ENCE OF OPERATION<PASS
FAIL
NOTE
Start-u<
− 9f A temp Q OOO EB confirm that heating coil &al&e
8/18/2019 Water Pump Function
22/34
PAC:A8ED ROOFTOP 8AS HEATDX COOL SYSTEM
8T2 +2C49*T9;
The roof top unit is typical of one that may be installed in a commercial5industrial5office
building ser&ing a specific area of the building.
The system consists of:
♦ packaged roof top unit
8/18/2019 Water Pump Function
23/34
PAC:A8ED ROOFTOP 8AS HEATDX COOL SYSTEM
2D2;C2 B *24AT9;
1.1 CCD*92+ +2." ccupied mode shall be determined by the time,of,day
8/18/2019 Water Pump Function
24/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
PAC:A8ED ROOFTOP 8AS HEATDX COOL SYSTEM
SE;9ENCE OF OPERATION<PASS
FAIL
NOTE
O((u#!d =od!<
− Confirm that B is ;
-hen heating is re#uired confirm that:
− A+ is positioned to minimum A setpoint
8/18/2019 Water Pump Function
25/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
PAC:A8ED ROOFTOP 8AS HEATDX COOL SYSTEM
SE;9ENCE OF OPERATION<PASS
FAIL
NOTE
9no((u#!d =od!<
-hen space temp. N night setback heating setpoint confirm that:
− A+ is tightly closed to A.
− Heating and cooling are both BB
− upply fan
8/18/2019 Water Pump Function
26/34
6ARIABLE AIR 6OL9ME SYSTEM
8T2 +2C49*T9;
The air handling system is typical of one that may be installed in a commercial5industrial
building ser&ing a specific area or floor of the building.
The system consists of:
♦ air handling unit
8/18/2019 Water Pump Function
27/34
6ARIABLE AIR 6OL9ME SYSTEM
+2 B *24AT9;
2#uipment hutdown ;ormal peration
;ormal Bire Bree)eBree
Cooling.Heating Cooling
;ight
Heating
utdoor
Air
+amper
Closed pen Closed odulating inimum odulating
4eturn Air
+amper pen Closed pen odulating odulating odulating odulating
4elief Air
+amper Closed pen Closed odulating odulating odulating odulating
HeatingCoil *ump
ff n n ff n ff n
Heating
Coilcontrol
&al&e
Closed odulating pen Closed odulating Closed odulating
B,1 ff n ff n n n n
Humidifier
enableClosed Closed Closed pen pen Closed pen
HD,1
control&al&e
Closed Closed Closed odulating odulating Closed odulating
Cooling
coilcontrol
&al&e
Closed odulating Closed Closed Closed odulating Closed
4B,1 ff n ff n n n n
*age +,"7
8/18/2019 Water Pump Function
28/34
6ARIABLE AIR 6OL9ME SYSTEM
2D2;C2 B *24AT9;
1.1 (2;24A/.% n a signal to start the supply and return fans open the return air dampers and
crack the outdoor air damper
8/18/2019 Water Pump Function
29/34
6ARIABLE AIR 6OL9ME SYSTEM
1.? VAV G62
.1 odulate the control damper to maintain the re#uired room temperature.
."
8/18/2019 Water Pump Function
30/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
6ARIABLE AIR 6OL9ME SYSTEM
SE;9ENCE OF OPERATION<PASS
FAILNOTE
9no((u#!d =od!<
Confirm that:
− upply fan
8/18/2019 Water Pump Function
31/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
6ARIABLE AIR 6OL9ME SYSTEM
SE;9ENCE OF OPERATION<PASS
FAILNOTE
War=-u<
− A+ stays closed to A until a&g. space temp N occupied heating setpoint.
− -hen a&g. space temp N occupied setpoint then A+ mo&es to min. A position OOOO K A
O((u#!d nor=a" =od!<
Confirm supply air temp.
8/18/2019 Water Pump Function
32/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
6ARIABLE AIR 6OL9ME SYSTEM
SE;9ENCE OF OPERATION<PASS
FAILNOTE
O((u#!d %nor=a"' =od!%(ont#nu!d'<
9f AT N
8/18/2019 Water Pump Function
33/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
6ARIABLE AIR 6OL9ME SYSTEM
SE;9ENCE OF OPERATION<PASS
FAILNOTE
Fr!!! =od!<
− n low temperature free)estat
8/18/2019 Water Pump Function
34/34
H6AC COMMISSIONIN8F9NCTIONAL PERFORMANCE TEST CHEC:LIST
6ARIABLE AIR 6OL9ME SYSTEM
SE;9ENCE OF OPERATION< Cont#nu!d
6A6 Bo?!4<
The VAV boxes shall modulate the damper and 4eheat HCV to maintain the ++C room setpoint during
day modeI and night modeI < different setpoints in each VAV box controller=.
imulate heating and cooling conditions.
VAV 9+ /ocation +ay ode ;ight ode Heating Cooling
Comments:
*4M2CT:
ystem: /ocation:
Area er&ed: 2#uipment: