Vico Software: 4D and 5D perspectives on BIM

Post on 20-May-2015

2.097 views 10 download

Tags:

description

Mark Sawyer (CEO of Vico Software) discusses 4D and 5D aspects of building information modelling.

Transcript of Vico Software: 4D and 5D perspectives on BIM

Status  and  Perspec.ve  on

4D  and  5D

Wednesday, December 14, 2011

Virtual  Construc.on...  Beyond  3D

Architect

Engineers

GC/CM

Subs

 Program  Design

 Performance

 Quality  Schedule  Cost  Safety

Owner  Opera:ons  Maintenance

Wednesday, December 14, 2011

Virtual  Construc.on...  Beyond  3D

Architect

Engineers

GC/CM

Subs

 Program  Design

 Performance

 Quality  Schedule  Cost  Safety

Owner  Opera:ons  Maintenance

3D

Wednesday, December 14, 2011

Virtual  Construc.on...  Beyond  3D

Architect

Engineers

GC/CM

Subs

 Program  Design

 Performance

 Quality  Schedule  Cost  Safety

Owner  Opera:ons  Maintenance3D+

3D+

Wednesday, December 14, 2011

Virtual  Construc.on...  Beyond  3D

Architect

Engineers

GC/CM

Subs

 Program  Design

 Performance

 Quality  Schedule  Cost  Safety

Owner  Opera:ons  Maintenance

4D

Wednesday, December 14, 2011

Virtual  Construc.on...  Beyond  3D

Architect

Engineers

GC/CM

Subs

 Program  Design

 Performance

 Quality  Schedule  Cost  Safety

Owner  Opera:ons  Maintenance

5D

Wednesday, December 14, 2011

Virtual  Construc.on...  Beyond  3D

Architect

Engineers

GC/CM

Subs

 Program  Design

 Performance

 Quality  Schedule  Cost  Safety

Owner  Opera:ons  Maintenance

6D

Wednesday, December 14, 2011

Virtual  Construc.on...  Beyond  3D

Architect

Engineers

GC/CM

Subs

 Program  Design

 Performance

 Quality  Schedule  Cost  Safety

Owner  Opera:ons  Maintenance

Integrated  5D

Wednesday, December 14, 2011

...but  Why  Tie  All  This  to  a  3D  BIM?

❖ Qty’s,  Task  Dura:ons,  and  Costs  are  Derived,  Not  Contrived

❖ A  Change  in  One  Place  Updates  Everywhere

CourtesySt. Joseph Health System

❖ Tighter  Project  Controls  and  Field  Integra:on

❖ Visual  Presenta:on  Equals  Rapid  Comprehension  in  Planning  and  in  the  Field

Wednesday, December 14, 2011

Real  Usage  Today

0

25

50

75

100

Progra

m

Design

Perform

ance

Coordinat

ion

Sched

uleCost

Safety

O&M

Wednesday, December 14, 2011

Real  Usage  Today

0

25

50

75

100

Progra

m

Design

Perform

ance

Coordinat

ion

Sched

uleCost

Safety

O&M

Wednesday, December 14, 2011

Real  Usage  Today

0

25

50

75

100

Progra

mDesi

gn

Perform

ance

Coordinat

ion

4D M

ovie

Sched

uleQty’s

Cost

Safety

O&M

Wednesday, December 14, 2011

0

25

50

75

100

Progra

mDesi

gn

Perform

ance

Coordinat

ion

4D M

ovie

Sched

uleQty’s

Cost

Safety

O&M

Wednesday, December 14, 2011

0

25

50

75

100

Progra

mDesi

gn

Perform

ance

Coordinat

ion

4D M

ovie

Sched

uleQty’s

Cost

Safety

O&M

Design-to-Construction

Construction-to-Owner

Wednesday, December 14, 2011

Design-­‐to-­‐Construc.on

❖ Data  fit  for  purpose• Design  Intent  vs.  Means  and  

Methods❖ Level  of  Detail

• Model  Progression  Specifica:on  (AIA  E-­‐202)

Wednesday, December 14, 2011

0

25

50

75

100

Progra

mDesi

gn

Perform

ance

Coordinat

ion

4D M

ovie

Sched

uleQty’s

Cost

Safety

O&M

A  guess  as  to  where  we  are  headed  next...

Wednesday, December 14, 2011

Q  &  A

Wednesday, December 14, 2011