Post on 11-Mar-2022
Figure 10-120
Residual Visual Impact During Construction and Operation
– Ha Che (S)
Visual Envelope
Location of Visually Sensitive Receiver (VSR) and direction of main views
VSR
500M Study Area
Work Limit Boundary
North
1:5000
VSR7
VSR6
VSR4VSR5
VSR3
VSR1
VSR2
VSR9
VSR8
HC-VSR1Construction OperationSlight / Moderate
Insubstantial / Slight
Slight Slight Beneficial (day 1)Slight Beneficial (year 10)
UnmitigatedMitigated
HC-VSR2Construction OperationSlight InsubstantialInsubstantial Insubstantial (day 1)
Insubstantial (year 10)
UnmitigatedMitigated
HC-VSR3Construction OperationModerate ModerateSlight / Moderate
Slight (day 1)Slight Beneficial (year 10)
UnmitigatedMitigated
HC-VSR5Construction OperationSubstantial Moderate / SubstantialModerate / Substantial
Slight / Moderate (day 1)Slight Beneficial (year 10)
UnmitigatedMitigated
HC-VSR6Construction OperationModerate / Substantial
Moderate
Moderate Slight / Moderate (day 1)Slight / Insubstantial (year 10)
UnmitigatedMitigated
HC-VSR4Construction OperationSubstantial Moderate / SubstantialModerate / Substantial
Slight / Moderate (day 1)Slight Beneficial (year 10)
UnmitigatedMitigated
HC-VSR7Construction OperationSubstantial ModerateModerate Slight (day 1)
Slight / Insubstantial(year 10)
UnmitigatedMitigated
HC-VSR8Construction OperationSubstantial ModerateModerate Slight / Moderate (day 1)
Slight / Insubstantial (year 10)
UnmitigatedMitigated
HC-VSR9Construction OperationSlight InsubstantialSlight Insubstantial (day 1)
Insubstantial (year 10)
UnmitigatedMitigated
A3 Jan 2016 Jan 2016 Jan 2016 Jan 2016
Copyright – The Government of the Hong Kong SARMap reproduced by Permission of the Director of Land