Post on 30-Dec-2015
TYPE, PLACE AND CONTENT OF THE CONDITIONS IN A PERMIT
BOYKO MALINOV
BULGARIA
HISTORY
DIRECTIVE REQUIREMENTSBULGARIAN LEGISLATIONPOTENTIAL INTERACTION INDUSTRIAL ACTIVITY-ENVIRONMENTEUROPEAN EXPERIENCEBULGARIAN VISION FOR MANAGEMENT SEQUENCEPILOT PERMITING – 14 PERMITS, LOOKING DIFERENTLY, EMS, GLOSSARY, INTERPRETATION
WHY DID WE NEED A METHODOLOGY?
PRIORITY OF THE PREVENTION BEFORE AFTERACTION
BROAD INFORMATION IS SORTED OUT
HEAVY LEGISLATIVE REQUIREMENTS TO BE REFLECTED
INSUFFICIENT EXPERIENCE IN THE AUTHORITY
PREDICTABILITY OF THE PERMIT’S REQUIREMENTS
SHORT DEADLINES FOR ISSUANCE OF PERMITS
WHAT DOES IT CONTAIN?
16 CHAPTERS
COMMON
SPECIALIZED
DECISION OUTLOOK
FRONTAL PAGE OF THE PERMIT
IMPORTANT COMMON CHAPTERS
SCOPE OF THE INSTALLATIONS
PERMIT’S BOUNDARIES – CHANGES IN THE INSTALLATIONS
INTERPRETATION OF COMPLIANCE – WATER, ENERGY, MATERIALS, ABATEMENT EQUIPMENT
IMPORTANT SPECIALIZED CHAPTERS
USE OF RESOURCES – WATER, ENERGY, MATERIALS
WASTE PRODUCTION AND TREATMENT
ACCIDENTS –PLANS
ABNORMAL OPERATION
CLOSURE OF THE OPERATION
EMISSIONS:- AIR- WATER-SURFACE AND GROUND- SOIL- NOISE
MANAGEMENT SEQUENCE
STANDARDS: IN AND OUT
RESPONSIBLE EQUIPMENT – HEAT/WATER EXCHANGERS, ABATEMENT
CONTROLED PARAMETERS
MAINTAINANCE OF THE OPERATION / REPAIR WORKS
MONITORING
REGULAR CHECK OF COMPLIANCE WITH THE STANDARDS (INTERPRETATION)
CORECTIVE MEASURES
RECORDS AND REPORTS OF THE COMPLIANCE
INTERACTION WITH OTHERS
GUIDANCE FOR SITE-SPECIFIC BAT DETERMINATION
GUIDANCE ON THE FILLING OUT THE APPLICATION
EMS GUIDANCES
EPER IMPLEMENTATION GUIDANCE
ANNUAL REPORT GUIDANCE
WASTE WATER PERMIT GUIDANCE
WASTE TREATMENT/TRANSPORTATION GUIDANCE
MONITORING GUIDANCES
TYPE, PLACE AND CONTENT OF THE CONDITIONS IN A PERMIT
END