Transmission Engineering NOTES:

Post on 05-Jan-2016

26 views 0 download

description

23. 01. 71. 71. 23. 02. 72. 72. 24. 24. Transmission Engineering NOTES:. 1. 2. 3. ICG HUB Suite 844 910 15 th St. SHEET ONE. ICG HUB Suite 844 910 15 th St. ICG Colo Level 3 1850 Pearl st. St. UCAR N. Classroom, Room 2208 1200 Larimer ST. Total to NCAR - PowerPoint PPT Presentation

Transcript of Transmission Engineering NOTES:

Transmission Engineering NOTES:

1.

2.

3.

UCAR leaseTwo fibers to 910 15th St. x-connected to Boulder hub x-connected to Center Green

SHEET ONE

06

05

800.01.07800.05.03

59

60

NE-

UCAR3070 Center Green

Boulder, CO 80xxx

NE- RR 0000.00.00

ICG HUBSuite 844910 15th St.

ICG BOULDER HUB1655 Walnut St

0001.02.06

UCARN. Classroom, Room 22081200 Larimer ST

Denver, CO 80202

RR 0000.00.00

52

51 01

02

8483

Ops Planning

Planning

Transm Engineer

Outside Plant

Mkt Planner

Name RevisionsDate

Operations

Transp Construction

Pri OPC NE/TID

Sec OPC NE/TID

C-NET NE/TID

REL Level

NE

Patch

10/01/02 WR.

Patch

0001.07.06

01

02

19225’219,513’

16400’

102.09ICG P.P.

OTDR TESTED – 12/24/02 & 1/29/020001.02.06

65

7172

71

ICG BOULDER HUB1665 Walnut St

NCAR Operations: 303-497-1200Jim Van Dyke – Office: 303-497-1251 Cell: 720-641-7195Chris Darren – 303-883-5921Dick Hall(inst. Fman)C: 303-884-9399

71

72

23

24

23

24

71

72

PatchPatch

800.02.08C01.11.01C01.11.02

23400’

ICG HUBSuite 844910 15th St.

ICG ColoLevel 31850 Pearl st. St.

7600’

800.03.03

7266

Patch

Patch

0001.07.06

UCARCG2-2042/R4-P1-1

UC Boulder - Engineering Bldg1111 Engineering Drive

72

71

72

71

BRAN.NCAR-Wht6

Patch

NE-

NCAR/UCAR1850 Tables Mesa Dr

Boulder, CO 80303

RR 0000.00.00

7069

7069

PatchUC Boulder - Engineering Bldg1111 Engineering Drive

BRAN.NCAR-Wht6

BRAN.NCAR-Wht5

72

71

7069Patch

Patch

UCARML-29/R1-P3-*

Patch

13,630’

29,170’

29,170’ 13,630’

Total to NCARMesa: 262,337’