Training for BSC Remote Commissioning Mode
英文目录标题 :35-40pt
颜色 : R153 G0 B0
内部使用字体 :
FrutigerNext LT Medium
外部使用字体 : Arial
中文目录标题 :35-40pt
颜色 : R153 G0 B0
字体 : 黑体
英文目录正文 :28-30pt
子目录 (2-5 级 ) :20-30pt
颜色 : 黑色内部使用字体 :
FrutigerNext LT Regular
外部使用字体 : Arial
中文目录正文 :28-30pt
子目录 (2-5 级 ):20-30pt
颜色 : 黑色字体 : 细黑体
Contents
• Introduction to the BSC Remote Commissioning
Mode Value Analysis and Application Cases
• Traditional Mode VS Remote Commissioning Mode
Flow Support
• Risks and Corresponding Measures
• FAQ & Coordinator Information
HUAWEI TECHNOLOGIES CO., LTD. Page 3Huawei Confidential
Introduction to BSC Remote Commissioning Mode
OSS room
OM network
BSC remote commissioning
BTS
BAM
LAN Switch
LMT
BTS
BSC
BSC traditional commissioning
BTS
BAM
LAN Switch
LMT
BTS
BSC
BTS
BAM
LAN Switch
LMT
BTS
BSC
BTS
BAM
LAN Switch
LMT
BTS
BSC
Region 1
Region 2
Region 1
Region 2
BSC Onsite Engineer
TD/BSC remote Engineer
TD/BSC Engineer
TD/BSC Engineer
BSC Onsite Engineer
HUAWEI TECHNOLOGIES CO., LTD. Page 4Huawei Confidential
Value Analysis and Application Cases-1/3 Values:
The OSS network is established first, which integrates the network management and the operations (network design/configuration, problem settlement, commissioning, and maintenance). The network reconstruction is avoided. The work efficiency is improved because no engineer is required to stay in the BSC equipment room for a long time to cooperate in the separate deployments.
The requirements for the skills of the commissioning engineers are reduced; therefore, the human resources allocation is flexible. The insufficiency of the engineers with higher technical skills is solved to meet the requirements of the delivery. The commissioning progress is accelerated and the project delivery becomes quicker. The commissioning costs are reduced, providing the prerequisite for reducing the costs of cooperation quotations.
Case 1: In the Reliance CDMA project in India, some regions adopt the remote commissioning mode.
Compared with the traditional commissioning mode, the human resources requirement is reduced by 30%. Engineers are not required to work in different BSC offices; therefore, a large amount of time and cost are reduced.
Service QuantityBSC Service Quantity (5 BSCs + about 400 BTSs)
Remote Commissioning Local Commissioning
Human Resources Requirements
1 Malaysian engineer + 3 local engineers1 Chinese engineer + 5 local engineers
Total (person) 4 6
When the commissioning scale is large:The demand on human resource decreases prominently.
When the commissioning scale is large:The demand on human resource decreases prominently.
HUAWEI TECHNOLOGIES CO., LTD. Page 5Huawei Confidential
Value Analysis and Application Cases-2/3 Case 2: In the project of China Mobile Qinghai Branch, one equipment room (2 BSCs + 100
BTSs) adopts the remote centralized commissioning mode. Compared with the traditional commissioning mode, the requirement for high-end engineers is reduced by 50%. On the BSCs performed with centralized design and centralized data configuration, the network modification is less, while the work allocation is clearer.
Service Quantity BSC Service Quantity (2 BSCs + about 100 BTSs)
Commissioning Mode Remote Commissioning Local Commissioning
Human Resources Requirements BSC Remote End BSC Local End BSC Local End
1 high-end engineer of
Huawei
1 low-end engineer of
the partner
2 high-end engineers of
the partner
Travel work time (person/day) 0 1 2
BSC commissioning work time
(person/day)
7 7 14
Estimated work time for BTS
deployment (person/day)
6 6 12
Total work time 27 28
The requirement for high-end engineers is reduced.The travel work time is reduced.The travel work costs are reduced.
The requirement for high-end engineers is reduced.The travel work time is reduced.The travel work costs are reduced.
HUAWEI TECHNOLOGIES CO., LTD. Page 6Huawei Confidential
Value Analysis and Application Cases-3/3 Case 3:
In the Reliance GSM project in India, the remote commissioning mode is adopted. Compared
with the local commissioning mode, the human resources requirement is reduced by 50%.
The engineers can deploy BTSs in the remote and centralized mode. The Engineers are not
required to work in different BSC equipment rooms for a long time; therefore, a large amount
of time and cost are reduced. Experience: There are about five types of simplified BTS configuration. The BSC data and BTS data script are
delivered to the remote engineers of each Circle, and then delivered to the onsite engineers
after some modification for the software installation and data loading. The A/Abis/Ater interfaces adopt the optical transmission, greatly reducing the connection error
probability in the hardware installation. For the internal cabling of the cabinet, the cabling
drawing is printed for the sub-contractors. Generally, if they operates based on the drawing, no
mistake will be made. The customer's preparation for transmission is made slowly. Separate deployments of BTSs are
conducted. The remote engineers can work in the maintenance room.Service Quantity
BSC Service Quantity (196 BSCs + 36000 BTSs)
Remote Commissioning ModeLocal Commissioning
Mode
Human Resources Requirements
(Chinese + local) (Chinese + local)
Total (person) 40 71
The human resource demand is reduced by a half.The human resource demand is reduced by a half.
HUAWEI TECHNOLOGIES CO., LTD. Page 7Huawei Confidential
High skill requirements for
BSC local engineers.
High skill requirements for
BSC local engineers.
Low skill requirements for
BSC onsite engineers.
Low skill requirements for
BSC onsite engineers.
High skill requirements for
BSC remote engineers.
High skill requirements for
BSC remote engineers.
Hardware Unpacking Check
Hardware Installation
Quality check and reconstruction of the hardware installation
Power-on Check
Configuring the IP address
Hardware Inspection and Acceptance
Software patch upgrade
HLD/LLD Data Negotiation/Creation
Data configuration for BTS deployment
Traditional Mode Commissioning Task
The OSS network is established.
Remote Commissioning Mode
Trunk Continuity Check
Software Installation
Hardware Power-on
Software commissioning
Configuring the cell data
Service test
Acceptance tests
Traditional Mode VS Remote Commissioning Mode
The commissioning of multiple BSCs can be performed at the same
time.
OnsiteOnsite
RemoteRemote
HUAWEI TECHNOLOGIES CO., LTD. Page 8Huawei Confidential
Flow SupportUnique difference with earlier projects: The OSS network is established first. Establish the OSS network first: When the remote commissioning mode is adopted, after
the BSC equipment hardware installation and before the software commissioning, the OM
channel is required, which connects the network management center and the BSC
equipment room. In this way, the engineers can remotely control the BAM and perform
commissioning on the BSS. (The M2000 may be established or not.) Before the equipment promotion, prepare the following guides and documents to support
the service implementation.
No. Flow Support Contents
1 Updates the TD engineering service guide: Add the contents of the OSS network to be established first.
2 Update the engineering implementation points of each product: Add the contents of the OSS network to be established first.
3 Update the main planning template of the engineering project: Add the contents of the OSS network to be established first.
4 Output the specific operation contents and guides of the BSC onsite engineers.
HUAWEI TECHNOLOGIES CO., LTD. Page 9Huawei Confidential
Risks and Corresponding Measures
No. Risks Corresponding Measures Responsible
Person
Completion
Deadline
1 How to
persuade the
customer
In the main plan of the project in the bidding stage: Add the contents of the
OSS network to be established first. When the bidding is successful, the TD
discuss with the customer about the establishment of the OSS network in
the implementation plan. Advantages: The commissioning time is reduced. The customer can
perform centralized management on the network. It is the practice of the
industry. (In the project of Ericsson, the OSS network is established first.)
Onsite Project
Team
Before the
Deployment
2 The project
team establishes
the OSS
network first.
The TD communicates with the project manager and the project team
members, and then approves the remote commissioning. The headquarters
provide the support for the remote commissioning mode.
Onsite project
team/Headquart
ers
Before the
Deployment
3 Delivery
Assurance
Add the first delivery of network management equipment in the TD work
guide.
Headquarters
coordinator
Before the
Delivery
4 Network
management
commissioning
capability (OM
networking
design)
The big Representation Offices have wireless engineers with installation
and commissioning skills of network management. For new employees, the
network management training is required. Provide training to the wireless engineers in the Representation Offices and
make sure that each Representation Office has wireless engineers with
commissioning skills. HeadquartersM2000Product Department support
M2000Product
Department
/Training
Department
Routine
How to ensure that the OSS network is established first.
HUAWEI TECHNOLOGIES CO., LTD. Page 10Huawei Confidential
FAQ-1
Can the remote commissioning mode reduce
costs? Is it necessary?Q
A
1. By establishing the OSS network first, the centralized network design and
operation management and unified network data planning are realized;
therefore, the rework and reconstruction due to unreasonable data configuration
can be reduced.
2. The network adjustment parameters and precautions can be executed
uniformly, avoiding the interaction in scattering commissioning mode and
solving the problem that scattering deployment of BTSs takes too much time.
3. The human resources, especially the high-end engineers, can be allocated flexibly, thus dividing the human resources into different levels.
4. The centralized commissioning does not require the engineers to travel among multiple BSC offices to provide instructions.
HUAWEI TECHNOLOGIES CO., LTD. Page 11Huawei Confidential
FAQ-2
Is there any communication problem in the
cooperation between the remote and local
engineers in the remote commissioning mode?
Q
A1. Generally, there is no communication problem with the local
staff.
2. The network management has information collection capability
and can help locate the problem.
3. In the overseas project, the local staff who are trained with priority can be allocated to the network management. The language communication problem can be solved.
4. The local engineers have the STEP by STEP guides for reference, which can solve these problems to some extent.
HUAWEI TECHNOLOGIES CO., LTD. Page 12Huawei Confidential
FAQ-3
Is there any problem in the interconnection
data negotiation when the local end engineers
communicate with the customer in the remote
commissioning mode?
Q
A 1. Generally, the interconnection data will be negotiated by
the regional TD, remote engineers, and the customer.
2. Other problems can be negotiated by the local end
engineers and the customer. The BSC onsite engineers have
the basic skills.
HUAWEI TECHNOLOGIES CO., LTD. Page 13Huawei Confidential
FAQ-4
The remote commissioning mode requires less
human resources. Is there any problem in the
cutover during which more human resources
are required?
Q
A1. In the network transfer scenario, multiple BTSs controlled by a
BSC are transferred at the same time. The project team must have
designated mobile workforce to handle the problems in the network
transfer. In this case, the human resources requirement can be meet
by borrowing the engineers from other regions. - In normal cutover,
there are similar problems.
2. In the new deployment scenario, the BTSs are added gradually, so there is no risk.
HUAWEI TECHNOLOGIES CO., LTD. Page 14Huawei Confidential
FAQ-5When the OSS network is being established, the customer needs to borrow the transmission cables to establish the network management. How to solve the problem if the customer does not agree to borrow the transmission cables in advance?
Q
A
1. Describe the advantages of establishing the OSS network first in the whole
project to the customer with the typical applications.
2. On the stand of the customer, describe the advantages of establishing the OSS
network first for monitoring the whole project.
3. Explain to the customer that this mode is the practice of the industry. (In the
project of Ericsson, the OSS network is established first.) If the mode is
described in the implementation plan for the bidding, explain this plan to the
customer.4. If the GSM BSC6000 adopts the remote TC configuration and the
OSS is not established yet, after the BSC operates normally, the BSC remote
engineer can configure the remote maintenance channel and connect the Ethernet
port on the SCU board of the remote TC to the remote GOMU. Then A interface
connection is realized and the BTS data can be configured. For details, contact
Yan Jinping (44371).
HUAWEI TECHNOLOGIES CO., LTD. Page 15Huawei Confidential
FAQ-6
The OSS network hardware is provided, but the IP planning of the customer is not completed for use. How to solve the problem?
Q
A
Overall solution: Firstly, find the reason why the IP planning is not
completed. Secondly, determine the means to stimulate the IP
planning based on the relationship with the customer.
1. If the customer is a new operator who lacks the skills to perform the IP planning or has many other things to do, when we make the IP planning with the customer, we can provide the draft and then submit it to the customer for approval.
2. If the customer intentionally delays the IP planning and is unwilling to make the IP planning, we need to discuss with the service manager or the customer manager, and take measures to push forward the IP planning.
HUAWEI TECHNOLOGIES CO., LTD. Page 16Huawei Confidential
FAQ-7
Experiences in establishing the OSS maintenance networkQ
A
1. Apply for an IP address segment from the customer. The data communication engineers plan the IP address of each router and BSC. If the routers and switches are old devices or are provided by the customer, urge the customer to provide the usable switch ports.If the customer rejects the request, ask the onsite data communication engineers to assist the customer in providing the switch ports.Explain the reasons of establishing the OSS maintenance network first for the customer. The OSS network can monitor the BSCs and train the customer during the commissioning process to facilitate the Huawei engineers to locate the problem remotely.2. If the routers and switches are newly deployed and provided by Huawei, apply for the E1 transmission links used by the OSS maintenance network in advance, confirm the positions of the routers and switches and the power supply ports in advance (check whether the routers and switches use 220 V or -48 V power supply), clarify the structure of Huawei BSC maintenance network, provide the types of the routers, switches, and E1 interface cards of the routers, ask the data communication engineers to provide the configuration scripts of the routers and switches, and instruct the engineers to load the scripts to the routers and switches.
HUAWEI TECHNOLOGIES CO., LTD. Page 17Huawei Confidential
Coordinator Information
If you have any question, please contact:
Wireless Network General Engineers' Office
Yan Jinping (00044371), Mobile: 13603000207, E-mail:
yanjinping@huawei.com
Zhang Yongqiang (00121922), Mobile: 13502888109, E-mail:
zhangyongqiang@huawei.com
Jiao Yan (00032033), Mobile: 13048961000, E-mail:
jiaoyan@huawei.com
Thank youwww.huawei.com