Sustainable Development: Practical Solutions to Real World
Problems Robert Roseen, PhD, D.WRE, PE
rroseen@geosyntec.com 603-205-8056
2014 Decision Makers Workshops: Construction and Clean Water Building Techniques and Technologies
that Protect Clean Water Marion, MA
April 16, 2014
The New Orleans Hurricane Protection System: What Went Wrong and Why-- 10 Lessons Learned from Katrina by the ASCE Hurricane Katrina
External Review Panel and the USACE Interagency Performance Evaluation Task Force
1. Failure to think globally and act locally-We must account for climate change
2. Failure to absorb new knowledge 3. Failure to understand, manage, and communicate risk-Need to take
rigorous risk based approach, 4. Failure to build quality in 5. Failure to build in resilience 6. Failure to provide redundancy 7. Failure to see that the sum of many parts does not equal a system 8. The buck couldn’t find a place to stop--Poor organization, lack of
accountability 9. Beware of interfaces: materials and jurisdiction 10. Follow the money-People responsible for design and construction had no
control of the monies.
Contentious issues require a commitment to listen carefully and work together for solutions
to be effective
Trust, Legitimacy and Relevance of Science
• Building trust can be accomplished by developing partnerships within local governments and stakeholders
• Through participation and familiarity in the process people will facilitate a deeper trust in science products.
Video by Laura James, Seattle, WA
Regulatory Drivers • Consent decrees and Long term control plans for CSO
separation • NPDES MS4 Phase I and Phase II has been largely an
issue of due diligence with respect to SWMP • TMDLs are based on WQ standards—due diligence
does not matter • 80% TSS Removal will not meet “no net increase
standard” • GI and LID will be needed to meet TMDL requirements
In the News…..
What is difference between these outcomes?
Negotiated plans using Green Infrastructure to reduce reliance on Gray Infrastructure
Green Infrastructure and Low Impact Development
Modeling designs after natural systems
Low Impact Development
• The environmental and water quality benefits of LID are well established,
• There are considerable economic, infrastructure, and adaptation planning benefits that are NOT WELL KNOWN from using LID-based strategies.
Benefits of LID and Green Infrastructure
Triple Bottom Line Analyses
Not All Costs are Equal
When implementing stormwater improvements, it is important to consider: who pays, how, and when. 1. Existing municipal programs and long-term
bonds 2. Stormwater Utilities—fees upon amount of
SW generated 3. Developer, Owner, Consumer
Economic Case Studies
Boulder Hills, Pelham, NH
2009 Installation of 1300’ of first PA private residential road in Northeast
Site will be nearly Zero discharge LID subdivision 55+ Active Adult Community Large sand deposit Cost 25% greater per ton installed
Conventional Site Design
LID Design
Avoided use of 1616’ of curbing, 785’ pipe, 8 catch-basins, 2 detention basins, 2 outlet control structures
Built on 9% grade 1.3 acres less of land clearing
17
Comparison of Unit Costs
6% savings on total cost of SW infrastructure for a ~zero discharge site
A Low Impact Development Approach at Greenland Meadows Greenland, New Hampshire Utilizing an LID approach that featured acres of porous asphalt and a gravel wetland, a cost-competitive drainage system was designed for a large retail development. The total impervious area of the development – mainly from rooftops and non-porous parking areas – is approximately 25.6 acres. This project had an estimated 26% cost reduction due to cost avoidance in associated drainage infrastructure (ponds and piping) with the use of Low Impact Development.
Greenland Meadows Commercial,
Greenland, NH • “Gold-Star” Commercial Development • Cost of doing business near Impaired
Waters/303D • Brownfields site, ideal
location, 15yrs • Proposed site >10,000
Average Daily Traffic count on >30 acres
Comparison of Unit Costs
26% savings on total cost of SW infrastructure for a ~zero discharge site
Portland, OR Tabor to the River:
Brooklyn Creek Project
• Program sought to rectify CSO, street and basement flooding
• The original cost estimate using gray infrastructure was $144 million (2009 dollars).
• Gray-Green design including a total of $11 million allocated for green solutions, the cost estimate for this integrated approach was $81 million.
• A savings of $63 million for the city
New York City, New York
Taking it to the next level…..jobs and added value
O&M Costs CSO
Control Scenarios
• GI will provided a 22% reduction in LTCP capital cost
• Funds for labor, supplies, and equipment
• Replacing energy demands of grey infrastructure
O&M burden shifts to people in replace of heavy energy demand
Economic Conclusions • Green Infrastructure is being embraced nationally due to reduced demand
on gray infrastructure • GI has value for social and economic in addition to environmental • LID may add expense on a per item basis • Project cost reductions were observed from 6% in residential developments
to as high as 26% in commercial projects. • Municipal use of GI reported cost reductions of 21% to as high as 44%. • Benefits extend to municipal, private, and commercial entities • Transfer of monies from infrastructure to jobs associated with the
maintenance activities. • From a sustainability perspective, a range of benefits includes reductions in
flood damage and increased resiliency of drainage infrastructure; • Reductions of 33 to 50% in energy demands for heating and cooling. • A 50% reduction in time to sale, and increased property values of 12-16%. • Other benefits were incentives in the form of rebates, cost-sharing, and tax
credits. IE. Impervious cover charge 26
The Need for Innovation
WHY DO WE CARE? • System performance
determines the degree and intensity of usage of a technology, and influence the cost of implementation
• Municipalities will be developing implementation plans for managing nutrients
• Improvements in performance could result in reduced cost of implementation
Design and Performance
Not all bioretention systems function equally
• There is a tremendous
amount of variety within design specifications and resulting performance that is not well understood
• Bioretention systems vary widely with respect to design features
Blue Line is at median INFLUENT concentration for all systems. Red Line is at median EFFLUENT concentration for all systems. Green Line, when present, indicates median EFFLUENT concentration of categories with particularly good performance.
NO3 Median INF = 0.36 mg/L Median EFF = 0.22 mg/L Median %RE = 14%
0.0100
0.1000
1.0000
10.0000
100.0000In
fluen
t
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
Influ
ent
Efflu
ent
N=35 N=10 N=10 N=14 N=10 N=29 N=3 N=7 N=3 N=23 N=8 N=9 N=8
All Systems 40-69%Sand Mix
70-100%Sand Mix
No CompostMix
CompostMix
Underdrain No InternalStorage
InternalStorage
<24 inMediaDepth
24-36 inMediaDepth
>36 inMediaDepth
Pre-treatment
No Pre-treatment
NO
3 Co
ncen
trat
ion
NO3 Box Plots
Bioretention-Gravel Wetland Hybrid Gravel Wetlands Bioretention
System Layout
32
VISR/WQV =0.1
33
Bio-
3 In
fluen
t
Bio-
3 Ef
fluen
t
Bio-
4 In
fluen
t
Bio-
4 Ef
fluen
t
GW In
fluen
t
GW E
fflue
nt
Bio-
5 Ce
ll 2
Influ
ent
Bio-
5 Ce
ll 2
Effl
uent
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.01
0.1
1
%RE
NO
3 Co
ncen
trat
ion
(mg/
L)
Nitrate Bioretention--STD Gravel
Wetland Bioretention-
ISR
An increase in performance efficiency of 50% is the
equivalent of a 33% cost reduction
Low Impact Development as a Climate Adaptation Tool and
Community Resiliency Mill Pond Rd after dam failure at Nottingham Lake, 4/18/2007
Increasing Impervious Surfaces
(Source, USGS, Reston, VA, 2007 )
Increase in Precipitation
Changing Trends
(Source, NOAA Climatic Data Center)
County Historic 100-Yr
NRCC 100-Yr % Incr.
Rock
ingh
am
6.4 8.8 27%
Stra
fford
6.3 8.2 23%
37
15 Highest Events Peak Recorded Discharges on Lamprey River
Current Flood Insurance Study 100-Year Flood = 7300 cfs Of 15 largest events since 1934: 8 have occurred in last 25 years 5 have occurred in last 15 years 3 have occurred in last 5 years
Rank Date Discharge (cfs)
Return Period 1
1 16-May-06 8,970 76-Year 2 18-Apr-07 8,450 38-Year 3 7-Apr-87 7,570 25.3-Year 4 22-Oct-96 7,080 19-Year 5 15-Mar-10 6,760 15.2-Year 6 20-Mar-36 5,490 12.7-Year 7 15-Mar-77 5,000 10.9-Year 8 15-June-98 4,720 9.5-Year 9 3-Apr-04 4,690 8.4-Year
10 30-Mar-83 4,570 7.6-Year 11 6-Apr-60 4,470 6.9-Year 12 11-May-54 4,070 6.3-Year 13 2-Feb-81 3,670 5.8-Year 14 31-July-38 3,530 5.4-Year 15 1-Apr-93 3,400 5.1-Year
Source: http://waterdata.usgs.gov/nwis
1Return Period based on order statistics and Wiebull plotting position of peak annual events
Costs from Presidentially Declared Disasters in NH
We can decide not to prepare, but we are then
choosing to increase our risk
Conventional Site Design
LID Design
Boulder Hills, Pelham, NH
Boulder Hills, Pelham, NH
Boulder Hills, Pelham, NH
Newmarket, NH Moonlight Brook
How do we actually
do this?
Commercial Street Reconstruction Porous Pavement
Provincetown, Massachusetts In 2012 Provincetown began the installation of over 5,000’ of the first “Porous Municipal Main Street”. The project addressed existing infrastructure problems with flooding and drainage along a main thoroughfare that has tremendous traffic during the busy tourist season. A high durability asphalt mix-design was chosen to meet the commercial traffic requirements. Through the use of widespread infiltration, the design seeks to manage stormwater and beach impairments which occur from the discharge of untreated runoff from many outfalls. Beach closures at these outfalls were eliminated in 2013 and numbered 18 in 2011, and 9 in 2012.
Provincetown
• Harbor is listed on the 2010 Integrated List of Waters as a “Category 4a” water body – TMDL for pathogens
• Heavy recreational and commercial use • Economic driver for the Town • Beach closures affect economy and public
perception
Source: w
ww
.provincetowntourism
office.org
• Year-round population of around 3,000 • Significant growth during the summer
– Seasonal population increases to approximately 30,000 – Summer tourism can bring in half a million visitors to Commercial Street
Image placeholder
Image placeholder
Image placeholder
Image placeholder
• Phase I: Winter 2012, Johnson to Winthrop Street, approx. 3,300 LF
• Phase 2: Winter 2013, Winthrop to West End, approx. 2,000 LF
• Project costs include: Stone bed and trench, Drainage replacement, 2 courses of porous pavement, New granite curbing, brick sidewalks and miscellaneous detail work
Porous Pavement Project (Continued)
Harbor Beach Closures
0
1
2
3
4
5
Beac
h Cl
osur
es
2011
2012
2013
12 7 8
Porous Pavement Standard Pavement
6 Closures in 2013
No 2013 Closures
2013 had a total of 15 closures at 10
locations
Does Impervious Cover Reduction Really Work?
Urban Watershed Renewal in Berry Brook Robert Roseen, Viktor Hlas, Tom Schueler, Tom Ballestero, Mark Voorhees,
Melinda Bubier, Joel Ballestero, James Houle, Dean Peschel, Bill Boulanger, David Burdick, Lorie Chase, Ann Scholz, Sally Soule, John Magee, Ben Nugent, Matt Carpenter, University of New Hampshire Stormwater Center, City of Dover,
University of New Hampshire, Cocheco River Watershed Coalition, New Hampshire Fish and Game, New Hampshire Department of Environmental Services
47
Funding Sources: NHDES 319 Watershed Assistance NHDES Aquatic Resource Mitigation Funds
48
Gravel Wetland DA=11.0 ac, Treated IC = 9.55 ac (86.8%)
Stream Restoration ~800 ft, including C, A and Aa - channel
Page Ave DA = 5.23 ac, Treated IC = 1.88 ac (36.0%)
Crescent Ave DA = 2.97 ac Treated IC = 1.5 ac (28.5%)
Wetland Expansion ~0.6 acres
Roosevelt Ave Upper Horne Street DA = 12.2 ac Treated IC = 3.7 ac (31%)
Glencrest Ave DA = 6.8ac Treated IC = 2.3 ac (33%) Lowell Ave
DA = 2.6 ac Treated IC = ac (43%)
Hydrology---Benefits of LID Retrofits
0.000
1.000
2.000
3.000
4.000
5.000
6.000
7.000
8.0000.00000
0.01000
0.02000
0.03000
0.04000
0.05000
0.06000
7/11/2011 10/19/2011 1/27/2012 5/6/2012 8/14/2012 11/22/2012
Prec
ip (i
n)
Disc
harg
e/Ar
ea (c
fs/a
c)
Date
Average Daily Flow per Watershed Area
Separation of hydrographs
for developed and
undeveloped watersheds
pre-constructions
Similarity of hydrographs
for developed and
undeveloped watersheds
post-LID installs
Shift towards pre-
development hydrology
POST-CONSTRUCTION LID
CONSTRUCTION PRE-CONSTRUCTION
Low Impact Development Hydrology
50
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0 0.005 0.01 0.015 0.02 0.025 0.03 0.035 0.04 0.045
Pn
Average Daily Flow per Watershed Area (cfs/ac)
Flow Duration Cuves by Time Period
Isinglass_Pre-LIDBB-Station_Pre-LIDIsinglass_Post-LIDBB-Station_Post-LID
Average daily area weighted flow duration curves for Berry Brook-Lower Watershed (Station, DA = 184.8 acres) and Isinglass River (DA = 73.6 sq.miles)
Extreme Storms—Less Frequent
Everyday Storms
Separation of hydrograph for developed and
undeveloped watersheds
Shift towards predevelopment hydrology
post-LID installs
2010 State Street Reconstruction Portsmouth, NH
• Award-winning CSO separation with GI in historic downtown
• Included tree filters, bioretention systems, and subsurface detention and filtration.
2009 Long Creek Watershed S. Portland, ME
• Surface Transportation ARRA Project
• First DOT PA road in the northeast-Sept 09
• 1500 feet of 6 Lane Highway Reconstruction
• 20,000 vehicles per day • 2% cost differential in
comparison with std build
52
2012 Cottages at Capstone, Durham, NH
• 600+ Bed Student Housing complex
• Located in drinking water supply area
• Watershed impaired for Nitrogen
• Included gravel wetlands, porous pavements
Acknowledgements Friends and Colleagues at the UNHSC • James Houle, CPSWQ • Thomas Ballestero, PhD, PE, PH, CGWP, PG • Alison Watts, PhD, PG • Timothy Puls Forging the Link Project Team • Todd Janeski, Virginia Commonwealth Univ • James Houle, CPSWQ, UNHSC Environmental Research Group • Michael Simpson, Antioch University New England • Jeff Gunderson, Professional Content Writer • Tricia Miller, Graphic Designer
Climate Change and Land Use Impacts on the 100-Yr Floodplain • Cameron Wake & Fay Rubin, EOS, University of New Hampshire • Robert Roseen, Ann Scholz & Tom Ballestero, UNH Stormwater
Center • Michael Simpson, Antioch University New England • Steve Miller, Great Bay National Estuarine Research Reserve • Julia Peterson & Lisa Townson, UNH Cooperative Extension • John Echeverria, Katherine Garvey & Peg Elmer, Vermont Law
School Commercial Design Partners • Joseph Persechino and Greg Mikolaities, Tighe and Bond • Brian Potvin, and Austin Turner of Tetra Tech Rizzo • David Jordan of SFC Engineering Partnership,
Acknowledgements
National Estuarine Research Reserve Coastal Training Program Coordinators: • Heather Elmer of the old Woman Creek NERR, • Christine Feurt of the Wells NERR, • Steve Miller of the great Bay NERR, • Tonna-Marie Surgeon-Rogers of the Waquoit Bay NERR, • David Dickson, National NEMO Coordinator; • LaMarr Clannon, Maine NEMO Coordinator; and Julie Westerlund of Northland NEMO. Municipal partners for sharing their valuable information and • Tom Brueckner, Engineering Manager at the Narragansett Bay Commission (NBC); • John Zuba, NBC Permits Manager; • Linda Dobson, Program Manager for Sustainable Stormwater Management at the
Portland Bureau of Environmental Services; • Bill Owen, P.E., Engineering Services with the City of Portland Bureau of Environmental
Services; • Peter Mulvaney, Sustainable Infrastructure Administrator for the City of Chicago
Department of Water Management. Volunteer municipal decision makers that participated in the development of this project.
Acknowledgements
Questions?