The LHCb Experiment II Detector · Physics requirements for the detector - large acceptance for the...

Post on 25-Jul-2020

3 views 0 download

Transcript of The LHCb Experiment II Detector · Physics requirements for the detector - large acceptance for the...

The LHCb Experiment IIDetector

XXXIV SLAC Summer Institute, 17-28 July, 2006

Tatsuya NAKADACERN

andEcole Polytechnique Fédérale de Lausanne (EPFL)

T. Nakada SLAC Summer Institute, July 2006 2

1) IntroductionPhysics requirements for the detector- large acceptance for the both b and b final states- trigger sensitive on

hadronic, semileptonic and leptonic final states- efficient, flexible and robust trigger- lepton and hadron particle identification

e/μ/ / /K/p- good propertime resolution- good mass resolution

T. Nakada SLAC Summer Institute, July 2006 3

1

10

10 2

-2 0 2 4 6

eta of B-hadron

pT

of

B-h

adro

nATLAS/CMS

LHCb

Shifted IP point

LHCb Spectrometer

Good mass and eigentime resolution: VELO + tracking systemHadron identification: RICH systemL0 Lepton and Hadron pT trigger: Calorimeter and muon system

100 μb

230 μb

T. Nakada SLAC Summer Institute, July 2006 4

b-b correlation

Both b and b are in the spectrometer.

p p

parton-1 parton-2

b

b

b

bb

bb pair production kinematics

No

b

b

b

T. Nakada SLAC Summer Institute, July 2006 5

fpp @ LHC = 40 MHz simple first level trigger needed

Single pT trigger for μ, e, h

pT

pL

p p

muon system: low track density

e and h: calorimeter ET measurements

T. Nakada SLAC Summer Institute, July 2006 6

pT threshold can be set low: high b efficiency

However…. p > pmin

p < pmin

p > pmin

Fe

muon:identification

hadron:energy resolution

E/E 7 0%/ E

p pp pT > pmin

central detector

p p

p pL > pmin

forward detector

T. Nakada SLAC Summer Institute, July 2006 7

Momentum spectrum and decay distance for B mesons

average B decay distance in the detector ~1cmare larger in the forward region.

Good proper time resolution.

T. Nakada SLAC Summer Institute, July 2006 8

2) Status of the Experiment

IP8: LHCb pit

LHC

CERN

Brazil, China, France, Germany, Italy, Netherlands, Poland, Romania, Russia, Spain, Switzerland, UK, Ukraine, USA

600 people, 75 MCHF

T. Nakada SLAC Summer Institute, July 2006 9

LHC

<L> ~ 2 1032 (Lnominal = 1034), b = 500 μb ( inelastic = 80 mb), 1012 bb/107 sec Bu,d,s,c, b, b, and other b-hadrons

T. Nakada SLAC Summer Institute, July 2006 10

radiation protection wall

electronics huts withreadout electronics and CPU farm

LHC tunnel

<L> ~ 2 1032 (Lnominal = 1034), b = 500 μb ( inelastic = 80 mb), 1012 bb/107 sec Bu,d,s,c, b, b, and other b-hadrons

LHC tunnel

MuonCaloRICH-2OT/ITMagnetTTRICH-1VELO

T. Nakada SLAC Summer Institute, July 2006 11

LHCb Spectrometer

VELO

RICH1

TT

Magnet

OT

RICH2 Calo. System

Muon System

T. Nakada SLAC Summer Institute, July 2006 12

Beam pipe

25mrad Be cone

Al bellows

10mrad Be cone

10mrad stainless steel cone

Al exit windowof VELO tank

T. Nakada SLAC Summer Institute, July 2006 13

Magnet

assembled, positioned, aligned, and field map measured

Magnet is now operational

- the field was measured with a precision of 3 10 4 fulfils the requirement

- good symmetry between the two polarities:B/<B>~ 3 10 4 small “fake” P violation

T. Nakada SLAC Summer Institute, July 2006 14

VErtex LOcator 300 μm Si sensor as close as 8mm from the beam

-sensors

r-sensors

10o-20o stereo angle

84

mm

4 45o

sectors

~ 1m

beam axis

collision point

T. Nakada SLAC Summer Institute, July 2006 15

Si in secondary vacuumwith the Roman pot technology

Being loweredand

Installed at final position

vacuum vessel in its support

T. Nakada SLAC Summer Institute, July 2006 16

Detector Module

0�

20�

40�

60�

80�

100�

120�

140�

160�

IP r

esol

utio

n [μ

m]

1/pT [GeV/c]−1

0

250

500

750

0 0.5 1 1.5 2 2.5 3 3.5 4

B decay tracks

Impact parameter resolution

T. Nakada SLAC Summer Institute, July 2006 17

Outer Tracker and Silicon Tracker

~1.4 1.2 m2

Inner Tracker Outer TrackerTrigger Tracker

Silicon Tracker

T. Nakada SLAC Summer Institute, July 2006 18

All the detector module construction completed

Straw drift chambers

40μm Kapton XC-160+ Laminated Kapton-Al

Outer Tracker

connecting two small modules around the beam pipe

T. Nakada SLAC Summer Institute, July 2006 19

OT supporthanging structureinstalled

Module Support C-frame-prototype tested-all produced and delivered at CERN-ready for loading the modules

T. Nakada SLAC Summer Institute, July 2006 20

Trigger Tracker Inner TrackerSilicon Tracker

410 μm Si320 μm Si

~1.4 1.2 m2

500 μm Si

~130 45 cm2

Si ladder productionin progress

T. Nakada SLAC Summer Institute, July 2006 21

T1 T2 T3

VELO

TT

Typical event display:Red = measurements (hits)Blue = all reconstructed tracks

Average # of tracks in b-events: 34 VELO,

33 long, 19 T tracks, 6 upstream, 14 downstream

Total 106 reconstructed tracks

~ 20 to 50 hits assigned to each long track98.7% correctly assigned

long track efficiency ghost rate

T. Nakada SLAC Summer Institute, July 2006 22

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7Δp/p

[%]

0

200

400

600

800

0 20 40 60 80 100 120 140

p� [GeV/c]

B decay tracks

Proper time resolution ~ 40 fs

Bs Ds+

VELO + ST + OT + Magnet

momentum resolution

T. Nakada SLAC Summer Institute, July 2006 23

RICH

Two RICH with three radiatorsAerogelC4F10

CF4

RICH1 (25-300 mrad)

RICH2 (15-120 mrad)

T. Nakada SLAC Summer Institute, July 2006 24

RICH1 RICH2

Flat mirrors

Spherical Mirrors

Photon Funnel + Shielding

Central Tube

Support Structure

Magnetic Shield

Beam Pipe

HPDPhotodetectors

Spherical Mirror

Flat Mirror

Gas Enclosure

Prototype mirror

from CMA

(600 x 600 mm2)

T. Nakada SLAC Summer Institute, July 2006 25

1024 pixel (500μm 500μm) detector and bump bonded pixel readout electronics.

HPD

RICH1

RICH2

RICH1

80mm

120m

m

T. Nakada SLAC Summer Institute, July 2006 26

RICH-2 transport to IP8

T. Nakada SLAC Summer Institute, July 2006 27

PID for B and Bs KK reconstruction

Bs Ds suppression with PID for Bs DsK Comb. suppression with PID for B DK 0

T. Nakada SLAC Summer Institute, July 2006 28

Calorimeter System

SPD/PSScintillator-Pb-Scintillator

EcalShashlik

HcalFe-Scintillator tile

Production completed

25X0

5.6

T. Nakada SLAC Summer Institute, July 2006 29

frontE-cal installation completed

9.4%E

(0.83(0.83±±0.02)%0.02)% (0.145(0.145GeVGeV))/E/E

E-cal measured in test beam

T. Nakada SLAC Summer Institute, July 2006 30

Hcal installation completed

PS/SPDfibre connections

T. Nakada SLAC Summer Institute, July 2006 31

and being installed

T. Nakada SLAC Summer Institute, July 2006 32

Muon System

MWPC production

except 3-GEM at M1R1(high occupancy)

Projective readout based on MWPC’s

T. Nakada SLAC Summer Institute, July 2006 33

Infrastructure at the pit

construction of the chambermounting wall >50%completed

Fe filter and electronicstower ready

T. Nakada SLAC Summer Institute, July 2006 34

Current status of the pit (IP8)

SPD/PreshowerEcalHcal

Muonfilterelectro. tower

RICH-2

OTIT

dipolemagnet

RICH-1

VELO

T. Nakada SLAC Summer Institute, July 2006 35

Trigger and Online

All the detector data

Readout Network

CPU

CPU

… storagedevice

Level-0: medium pT trigger: 40 MHz 1 MHz

1 MHz @ 30kB/event

data logging2000 Hzcommercial

components

Calorimeter, Muon and Pile-up

Switch

...

CPU

CPU

Switch

...

CPU

CPU

Switch

...

running HLT

algorithms

T. Nakada SLAC Summer Institute, July 2006 36

Level-0: Muon, Calorimeter (e, h, , 0), Pile-up veto, Decision Unitprototypes.

Muon processor board

Calo selection board

Pile-up veto Decision Unit

T. Nakada SLAC Summer Institute, July 2006 37

1.3

1.1

4.0

4.5

2.6

2.8

3.6

Thresh(GeV)

Muon

0 local

Photon

Type

Di-muon

pTμ

0 global

Electron

Hadron

Hadron Muon ECal

Signal efficiency ~50%

Ouput Rate

~85% ~70%

700 kHz 200 kHz ~200 kHz

Level-0

efficiencies for offline selected events

L0 setting

T. Nakada SLAC Summer Institute, July 2006 38

CPU farm prototype

Force10 E1200 network switch

Tell1: LHCb common

readout board

Optical receiver card

Giga-bit Ethernet transmitter card

350 boards ~1800 “boxes” 3600 CPU’s

T. Nakada SLAC Summer Institute, July 2006 39

CPU farm: 1800 “boxes” = 3600 CPU’sStart with L0-info, VELO, TT, T and Muon

look for events withmedium pT tracks with large impact parametershigh pT muon tracksdi-muonhigh pT photon

Reject events as soon as possible.Later include Calorimeters and RICH

exclusive reconstruction of B decayssemi-inclusive reconstruction of B decaysexclusive D reconstruction

etc.

On tape:200 Hz B exclusive, 1.8 kHz D +di-muon+single-muon

T. Nakada SLAC Summer Institute, July 2006 40

ComputingC++ based LHCb complete software suite for

simulation, reconstruction, analysis, alignment and calibration, and high level trigger

are running under the uniform framework “GAUDI”LHCb computing model based on

- reconstruction, pre-selection and analysis at Tier-1- simulation at Tier-2All the computing aspects are periodically tested through“Data Challenges”

simulation and reconstructionjobs running atWLCG sitesin DC2006

On going!

T. Nakada SLAC Summer Institute, July 2006 41

Preparation for the first dataIn order to be ready for

1) pilot run @900 GeV in November 20072) first physics run @14 TeV in Spring 2008

we haveCommissioning Task Force

- Defining the mode of operation for data taking, and identifying, producing, implementing and testing all the tools necessary for this operation;

- Coordinating the commissioning the sub-systems;- Preparing the detector for steady data taking, through global

commissioning, including the pilot runPhysics Planning Group

- Optimizing physics output for a given running scenario andpreparing necessary tools

T. Nakada SLAC Summer Institute, July 2006 42

4) Conclusions• LHCb expects to take B physics a significant step further than the B

factories:- access to other b hadron species + high statistics- excellent vertexing and particle ID- flexible and efficient trigger, dedicated to B physicsMany channels with different sensitivities to new physics

• Construction of the LHCb detector is advancing well• Low luminosity (~1032) required for the LHCb experiment

will allow to exploit full physics potential from the beginning of theLHC operation, and we will be ready for the pilot run in 2007 andthe start of physics exploitationin Spring 2008