The last data taboo - DEVEX · PDF fileThe last data taboo DEVEX conference 19th May 2016...

Post on 11-Mar-2018

230 views 2 download

Transcript of The last data taboo - DEVEX · PDF fileThe last data taboo DEVEX conference 19th May 2016...

The last data taboo

DEVEX conference 19th May 2016

Jonathan Jenkins, Director NDB

Jocsiris Nava, Senior Petroleum Engineer, NDB

Abhi Kohok, Senior Reservoir Engineer, NDB

Victoria Turner, Subsurface Data Manager, Centrica PLC

What’s the fuss about

Improve

Asset

Stewardship

Gunther Newcombe OGA April 2016

Production Data 101

Focus on Allocation

Fluid Dynamics

Reservoir Engineering Handbook, Tarek Ahmed, Elsevier 2010

How confident are you in well allocation

figures?

Confident or Very Confident 45%

Unconfident or Very Unconfident 55%

An inkling of a problem…..

Reservoir Engineer typical survey results

Compliance

SOX

EuroSOX

(Directive

84/253/EEC)

Allocation

Methodology

OGA coming to get you

[You were meant to do it

this way]

Data Maturity

Production Data

Maturity Chart

Non-existentOrganization has no data governance approach, does not understand the need for governance and has no stewardship functions.

Ad hoc

Organization performs occasional, non-standardized stewardship activities but has no formal data governance approach.

Standardized

Organization has implemented some standard data governance practices and has standardized the stewardship role.

Committed

Organization has instituted formal data governance for all business units and has dedicated stewards for all business units.

Consolidated

Data governance and stewardship are coordinated across the enterprise, involving business and information technology and management in partnership.

5

23

4

1

Adapted from: Real-World Decision Support (RWDS)

Journal » Volume 1, Issue 33 - October 2006 Issue » Anne

Marie Smith: Data Governance Maturity - An Overview

It was 20 years ago today

Internal

Data

Flow

Production Data

Production Engineers Reservoir Engineers

Hydrocarbon

Accounting

A typical Production Data Listing

Multiple

locations

for same

data

A constructive tension

Task Modelling

Frequency Daily

Task Counting

Frequency Monthly

Supporting production

You

You

You You

2016 Aupec / NDB Data Maturity survey

1:20Support:Users

1:35Support:Users

1:43Support:Users

1:83Support:Users

Data folk – how Petroleum Engineers

like it

Data Management

(DM)

You, the Engineer

Information Technology (IT)

Information Services (IS)

Data folk – what you get

Information Management (IM)

Project PDM

You, the Engineer

Corporate DM

Information Technology (IT)

Information Services (IS)

Data folk – an ideal compromise?

Information Management (IM)

Project PDM

You, the Engineer

Corporate

DM

Asset Data Manager

Production Data Management – as is

Production

Data is in

excel hell

Image taken from www.clearpointstrategy.com

What’s wrong with spreadsheets?

Manual data entry error

Broken links to other sheets

Not stored centrally – c drive common

Poor collaboration

Non QC’d algorithms

Version Control non existent

Poor security

No compliance with regulator

Oil Volume Comparison

Well A Well BSimulation

Engineers

HCA

Simulation

Engineers

HCA

Production Data – an ideal model

Death by Process

Gather the

workflows..

Raw Data QC AllocationCharting &

InterfaceAnalysis Reporting

Master Workflow – Field A

Select tool….

Detailed analysis of PDMS software

PE tools in the market

xxx

xxx

xxx

HCA tools in

the market

Scoring Matrix

Tool A Tool C Tool D Tool ETool B

Two steps

1. Create a common data store

2. Automate the processes

Plot the data flow

excel spreadsheets

Follow Standards

Create links to

PDMS

Production

Datastore

‘tags’

Historian

Migrate to PDMS

• Historical Data

• QC

Workflow-1 in PDMS

Automate

Automate

Semi -Automate

Automate

PDMS data OFM data

Live

Continuous

Connection

Enabling a real-time dashboard

Where we are - Maturity Chart

Non-existentOrganization has no data governance approach, does not understand the need for governance and has no stewardship functions.

Ad hoc

Organization performs occasional, non-standardized stewardship activities but has no formal data governance approach.

Standardized

Organization has implemented some standard data governance practices and has standardized the stewardship role.

Committed

Organization has instituted formal data governance for all business units and has dedicated stewards for all business units.

Consolidated

Data governance and stewardship are coordinated across the enterprise, involving business and information technology and management in partnership.

5

23

4

1

Adapted from: Real-World Decision Support (RWDS)

Journal » Volume 1, Issue 33 - October 2006 Issue » Anne

Marie Smith: Data Governance Maturity - An Overview

Our journey

PDMS is the basis for better science

WELL RATE ESTIMATION EXTERNAL PROSPER MODELS

INPUT PROCESS OUTPUT

Fire -up Latest Prosper Model

Run Lift Model

Run IPR Model

Allocated Rates - qg

PI Process - Pth, Tth data

Well flowing bottomhole pressure (Pwf)

Estimated P*

Estimated Rates: Store & Plot

Use Prosper modelling to estimate rates?

PDMS forces set Roles &

Responsibilities

PDMS challenges our assumptions

Our Flow Meters

Historical data in EC

Anaysis of past data

Excel – the Return

Let in the Light

• Scale change time saving for

engineering processes

• Seconds to run reports, not hours.

• Improved Allocation consistency

between HAC and PE's

• New workflows now

PDMS – first step

i-field programme

$9m investment

Return of $31m in 8 months