TH 13/101TH 13/101Design-Build ProjectDesign-Build Project
S.P. 7001-103S.P. 7001-103
October 30, 2009
Michael Beer, P.E.Mn/DOT Project Manager
PROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETING
DESIGN-BUILD INFORMATIONDESIGN-BUILD INFORMATION
Amber Blanchard, Mn/DOT Central OfficeAmber Blanchard, Mn/DOT Central Office
Design-Build Program ManagerDesign-Build Program Manager
Economic Stimulus Program (ARRA Funds)Economic Stimulus Program (ARRA Funds)
Design-Build Low BidDesign-Build Low Bid
Request for Qualifications (RFQ)Request for Qualifications (RFQ) Low Bid – Streamline processLow Bid – Streamline process High Quality TeamsHigh Quality Teams
Short-listingShort-listing StipendsStipends
Request for Proposals (RFP)Request for Proposals (RFP) Technical ProposalTechnical Proposal
Alternate Technical ConceptsAlternate Technical Concepts Price/DBE ProposalPrice/DBE Proposal
Conflict of InterestConflict of Interest
Approach Posted on Website:Approach Posted on Website:
www.dot.state.mn.us/designbuild/www.dot.state.mn.us/designbuild/
PROJECT INFORMATIONPROJECT INFORMATION
Michael Beer, Mn/DOT Metro DistrictMichael Beer, Mn/DOT Metro District
Project ManagerProject Manager
DISCLAIMERDISCLAIMER
What is discussed today is informational only; it is What is discussed today is informational only; it is meant to assist interested teams in the pursuit of this meant to assist interested teams in the pursuit of this project.project.
The ultimate contract requirements will be included in The ultimate contract requirements will be included in the Request for Proposals (RFP). the Request for Proposals (RFP).
There may be changes between now and the time the There may be changes between now and the time the RFP is issued.RFP is issued.
Project PartnersProject Partners
City of SavageCity of Savage
Scott CountyScott County
Federal Highway AdministrationFederal Highway Administration
Department of Natural ResourcesDepartment of Natural Resources
Design-Build ProposersDesign-Build Proposers
HNTB – Design-Build Contract DevelopmentHNTB – Design-Build Contract Development
Project InformationProject Information
http://www.dot.state.mn.us/designbuild/TH13-CR101/index.html
http://www.dot.state.mn.us/metro/projects/hwy13savage/index.html
Project DescriptionProject Description
General LayoutGeneral Layout RoadwayRoadway
LimitsLimits
ProfilesProfiles
Pedestrian crossingPedestrian crossing DrainageDrainage
Flood plainFlood plain Right of WayRight of Way
No additional R/WNo additional R/W BridgeBridge
VibrationsVibrations
Bridge LayoutBridge Layout
Project DescriptionProject DescriptionUtilitiesUtilities
NoiseNoise
Visual QualityVisual Quality
BoringsBorings
EnvironmentalEnvironmental Savage FenSavage Fen WetlandsWetlands Trout Stream – Eagle CreekTrout Stream – Eagle Creek
GeotechnicalGeotechnical Artesian ConditionsArtesian Conditions MuckMuck
Design-Build Design-Build General Discussion PointsGeneral Discussion Points
Co-Housing – not requiredCo-Housing – not required May require a design/construction office within 3 May require a design/construction office within 3
miles of the project. miles of the project. Key personnel onlyKey personnel only
DBEDBE Goal will be determined at RFPGoal will be determined at RFP Outreach MeetingOutreach Meeting
ARRA Funded ScheduleARRA Funded ScheduleTentative – Subject to ChangeTentative – Subject to Change
ACTIVITY ACTIVITY Due DateDue Date
Issue RFQ Issue RFQ Mid-NovemberMid-November
SOQ Due Date SOQ Due Date Mid-DecemberMid-December
Determine Short List Determine Short List Early January, Early January, 20102010
Issue RFP Issue RFP Late JanuaryLate January
Technical Proposals Due Technical Proposals Due Mid-MarchMid-March
First Notice to ProceedFirst Notice to Proceed Mid-AprilMid-April
Project CompletionProject Completion December, 2010December, 2010
TIGER Funded ScheduleTIGER Funded ScheduleTentative – Subject to ChangeTentative – Subject to Change
ACTIVITY ACTIVITY Due DateDue Date
Issue RFQ Issue RFQ Mid-NovemberMid-November
SOQ Due Date SOQ Due Date Mid-DecemberMid-December
Determine Short List Determine Short List Early January, Early January, 20102010
Issue RFP Issue RFP Mid-MarchMid-March
Technical Proposals Due Technical Proposals Due Late AprilLate April
First Notice to ProceedFirst Notice to Proceed Late MayLate May
Project CompletionProject Completion December, 2010December, 2010
Project GoalsProject Goals
Environmental ComplianceEnvironmental Compliance Minimize environmental impactsMinimize environmental impacts Protect the Savage Fen and WetlandsProtect the Savage Fen and Wetlands
QualityQualitySchedule & BudgetSchedule & BudgetStakeholder SatisfactionStakeholder Satisfaction
Maintenance of TrafficMaintenance of Traffic Business and Residential impactsBusiness and Residential impacts
SafetySafetyEmployment OpportunitiesEmployment Opportunities
Request for QualificationsRequest for Qualifications
Mn/DOT Single Point of ContactMn/DOT Single Point of Contact michael.beer@state.mn.usmichael.beer@state.mn.us
Questions ?Questions ?