TEAM 8: GRAND RIVER RAPIDS
Team 8
Aaron Vanderhill Jim Barron Jeff Van Laar Tom Marshall
Outline Project Design Alternatives Preliminary Design Feasibility Design Norms Issues Questions
Project Primary Goal
Return the rapids to the Grand RiverGGR
Secondary GoalCreate a whitewater courseGRWW
Revitalize Downtown Area
Design Alternatives1. Removal of 5 beautification dams
Replace with natural rocks
2. Diversion Canal Go around 4th street dam
3. 4th Street Dam modification Removal of east side
4. Removal of 4th Street Dam
Preliminary Design Combination of alternatives 1 and 3
Replacement of downstream damsModification of 4th Street Dam
ReasonsMeets client’s needsImproves fish habitatOther alternatives not feasible
○ Sediment behind 4th Street Dam○ Would look unnatural○ Greater costs
Example of Stair-step Rapids
www. grandrapidswhitewater.com
Feasibility Many examples of other courses Sufficient flow in river Revitalization of downtown Safer than existing conditions
Video
Design Norms Cultural Appropriateness
Suitable to all parties Justice
Respect rights of fishermen and property owners
StewardshipNaturalize riverImprove fish habitat
Issues Modeling Cost estimates Acquiring data
Resources HEC-RAS model of Grand River
Model from GRWW
FTC&H
GRWW
Questions?