Taj Samudra

Post on 14-Feb-2017

42 views 1 download

Transcript of Taj Samudra

TAJ SAMUDRATAJ SAMUDRACOLOMBOCOLOMBO

““First time in the History of Taj Projects, First time in the History of Taj Projects, Renovation of magnitude of 90 Cr completed Renovation of magnitude of 90 Cr completed

in less than 6 Months in a running Hotel in less than 6 Months in a running Hotel achieving all 4 factors –Time, Budget, achieving all 4 factors –Time, Budget,

Quality and Safety.Quality and Safety.

This impossible task made possible with the This impossible task made possible with the best team effort of over 20 technical / non-best team effort of over 20 technical / non-

technical staff and 500 workers slogging day technical staff and 500 workers slogging day and night and with the Best ever cooperation and night and with the Best ever cooperation

from Operations team” from Operations team”