Strom Response - ESB Networks Irish National Committee Training … · 2019-04-03 · Irish...

Post on 26-Jun-2020

1 views 0 download

Transcript of Strom Response - ESB Networks Irish National Committee Training … · 2019-04-03 · Irish...

Strom Response - ESB Networks

Irish National Committee Training Day

Stephen Treacy – ESB Networks

Jarlath Doyle – ESB Networks

2 esbnetworks.ie

Introduction

I. Introduction

II. Part A

• Recent Storm Events

• Historical Storm Events

III. Part B

• Storm Ophelia

J.Doyle & S.Treacy

3 esbnetworks.ie

Winter Storms – Nov 13 to Feb 14 (Darwin)

• “Shannon Airport reported its highest winter

mean windspeed in 31 years with 12.3 knots (23

km/h), while some stations in the South had their

highest mean windspeeds in 24 years. The

highest gust of the season was 86 knots (159

km/h) at Shannon Airport on the 12th February,

its highest for winter on record (68 years)” Met

Éireann Winter 13/14 Report

4 esbnetworks.ie

Winter Storms – Nov 13 to Feb 14

5 esbnetworks.ie

Poleset 200 –Cashla-Ennis

6 esbnetworks.ie

Poleset 200 –Cashla-Ennis

7 esbnetworks.ie

Tarbert-Tralee 2 [129 & 130]

8 esbnetworks.ie

Summary of failures & faults - Darwin

1. Collapse of seven transmission 110

kV Poles

2. Five other 110 kV OHL also tripped

out on earth faults across both

events

3. Severe damage to distribution

system

4. Approx. 260,000 ESB customers

were without power at peak

5. Immediate restoration work ~ 2

weeks

6. Full repair – 6 months

9 esbnetworks.ie

Historical Storm Events - Typical Siemens Tower Failure

10 esbnetworks.ie

Siemens 110kV Tower Failures

11 esbnetworks.ie

Historical Storm Events – 400 kV in Cahermurphy

12 esbnetworks.ie

13 esbnetworks.ie

Part B: Storm Ophelia

15 esbnetworks.ie

Storm Ophelia

At its peak 385,000 homes and businesses had no

electricity

– South West 224,000

– Dublin South and South East 55,000

– Mid West 59,000

– Dublin North/Dundalk 36,000

– North West 11,000

There were over 5,500 individual fault locations

It resulted in 11.7m Customer Hours Lost

J.Doyle & S.Treacy

16 esbnetworks.ie

Today

Safety Information Restoration

J.Doyle & S.Treacy

18 esbnetworks.ie

Before the storm…

Day -4: Thursday Forecasts

Day -3: 2pm on Friday - Emergency Plan Invoked

Day -2: ESB Networks Crisis Management Meetings

Saturday morning and evening (Request assistance from UK on Saturday

9am)

Day -1: 3pm Sunday

Networks Emergency Management Team Convene in Leopardstown

Met Éireann Advisory issued on Thursday afternoon:

A combination of a vigorous Atlantic weather system and the remnants of Hurricane Ophelia will pass close to

Ireland on Monday, and has the potential to be a high-impact event in parts of the country. There is a lot of

uncertainty as to the exact evolution and movement of this weather system during the coming four days, but

storm-force winds, outbreaks of heavy rain, and very high seas are threatened. Met Éireann will maintain a

close watch on the evolution and issue further advisories and warnings as these are warranted.

Saturday 14/10/17

Level Red for southwest & west (5 counties), orange for the rest of country.

Ex-hurricane Ophelia is expected to bring severe winds and stormy conditions on Monday. Mean wind speeds in excess of 80 km/h and gusts in excess of 130km/h are expected, potentially causing structural damage and disruption, with dangerous marine conditions due to high seas and potential flooding.

J.Doyle & S.Treacy

19 esbnetworks.ie

National Co-Ordination

● NECG convenes Sunday 15th 10am

● Closure of Schools

● Extension of Red Warning to entire country

● Safety and Information

● ESB is a leader in this area

J.Doyle & S.Treacy

Storm Ophelia

21 esbnetworks.ie

During Ophelia - Monday 16th October – Day 0

Safety

● Public Safety

– Stay Safe Stay Clear

– Contact us

● Staff Safety

● Wait until the wind has passed

Information

● NECG meeting @10am/2pm/4pm

● Network Storm Co-ord group meet 8am/2pm/7pm

● Forecasted customer outage of 450k

● Signal intent for the rest of the week

Restoration

● First fault at 07:45 Co. Cork

● No work during the storm - remote operations via Control Centre

● Work commenced at 4 pm

J.Doyle & S.Treacy

22 esbnetworks.ie

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

0

50000

100000

150000

200000

250000

300000

350000

4000002

01

7-1

0-1

6 0

6:0

0

20

17

-10

-16

09

:00

20

17

-10

-16

12

:00

20

17

-10

-16

15

:00

20

17

-10

-16

18

:00

20

17

-10

-16

21

:00

20

17

-10

-17

00

:00

20

17

-10

-17

03

:00

20

17

-10

-17

06

:00

20

17

-10

-17

09

:00

20

17

-10

-17

12

:00

20

17

-10

-17

15

:00

20

17

-10

-17

18

:00

20

17

-10

-17

21

:00

20

17

-10

-18

00

:00

20

17

-10

-18

03

:00

20

17

-10

-18

06

:00

20

17

-10

-18

09

:00

20

17

-10

-18

12

:00

20

17

-10

-18

15

:00

20

17

-10

-18

18

:00

20

17

-10

-18

21

:00

20

17

-10

-19

00

:00

20

17

-10

-19

03

:00

20

17

-10

-19

06

:00

20

17

-10

-19

09

:00

20

17

-10

-19

12

:00

20

17

-10

-19

15

:00

20

17

-10

-19

18

:00

20

17

-10

-19

21

:00

20

17

-10

-20

00

:00

20

17

-10

-20

03

:00

20

17

-10

-20

06

:00

20

17

-10

-20

09

:00

20

17

-10

-20

12

:00

20

17

-10

-20

15

:00

20

17

-10

-20

18

:00

20

17

-10

-20

21

:00

20

17

-10

-21

00

:00

20

17

-10

-21

03

:00

20

17

-10

-21

06

:00

20

17

-10

-21

09

:00

20

17

-10

-21

12

:00

20

17

-10

-21

15

:00

20

17

-10

-21

18

:00

20

17

-10

-21

21

:00

20

17

-10

-22

00

:00

20

17

-10

-22

03

:00

20

17

-10

-22

06

:00

20

17

-10

-22

09

:00

20

17

-10

-22

12

:00

20

17

-10

-22

15

:00

20

17

-10

-22

18

:00

20

17

-10

-22

21

:00

20

17

-10

-23

00

:00

20

17

-10

-23

03

:00

20

17

-10

-23

06

:00

Storm Ophelia - Customer Outage Volume

Outages Customers without SupplyJ.Doyle & S.Treacy

24 esbnetworks.ie

Safety

J.Doyle & S.Treacy

25 esbnetworks.ie

Restoration

J.Doyle & S.Treacy

26 esbnetworks.ie

Data Analytics – See what you can do…

Data Analytics team

deployed to the Control

Centre where they had

access to data from live

operations systems and their

own data tools

Then redeployed to affected

areas

J.Doyle & S.Treacy

Mutual Aid NIE 187

Northern PowerGrid 16

WPD 37

Manx 5

Scottish Power 20

UK Power Networks 24

Electricity North-West 38

ENEDIS (France) 27

Morrison Utility

Services15

Total 359

J.Doyle & S.Treacy

28 esbnetworks.ie

Information

Date Day Messages

15-Oct -1Public Safety Preparedness

16-Oct 0Public Safety Expectations Damage Assessment What will come tomorrow

17-Oct 1Public Safety Restoration Prioritisation Stakeholder Information What will come tomorrow

18-Oct 2Public Safety Estimated Restoration Times What will come tomorrow

19-Oct 3Public Safety Geographic Report What will come tomorrow

20-Oct 4Public Safety Updated ERTs Storm Brian

J.Doyle & S.Treacy

29 esbnetworks.ie

Information

J.Doyle & S.Treacy

31 esbnetworks.ie

Shoulders of Giants

• Resources

• Nothing gets done without people

• Army

• NEWSAC

• Contractors

• Organisation

• Staff Safety and Welfare

• Mobile drying units

• Daily Safety presentations & Safety Performance

• Food for depots

• Inductions in Training Centre

• Safety Briefings & Warnings to Public about fallen wires

• Stock of PPE

• Materials Management

• Emergency Management

• Responsibility splitting – stakeholder, operations, media, welfare, action log & lessons learned,

resources, information, communications, customer, safety

• Devolved Control & Splitting areas

• Daily SMT conference calls + SMT experienced in weather events

• Help, support and interest from other parts of ESB

• Customer and Stakeholder Management

• Leixlip Contact Centre open early

• Information management

• Managing politicians

• Regular media & stakeholder briefings

• Media

• Extent of media interest

• IT and Social Media

• New OMS

• Data Analytics

• Depot, Worksite & MPRN Apps

J.Doyle & S.Treacy

32 esbnetworks.ie

From Customers to Families

J.Doyle & S.Treacy

The Future

34 esbnetworks.ie

35 esbnetworks.ieJ.Doyle & S.Treacy

36 esbnetworks.ieJ.Doyle & S.Treacy

37 esbnetworks.ie

Continual Improvement

0

50000

100000

150000

200000

250000

300000

350000

400000

20

17

-10

-16

00

:00

20

17

-10

-16

04

:00

20

17

-10

-16

08

:00

20

17

-10

-16

12

:00

20

17

-10

-16

16

:00

20

17

-10

-16

20

:00

20

17

-10

-17

00

:00

20

17

-10

-17

04

:00

20

17

-10

-17

08

:00

20

17

-10

-17

12

:00

20

17

-10

-17

16

:00

20

17

-10

-17

20

:00

20

17

-10

-18

00

:00

20

17

-10

-18

04

:00

20

17

-10

-18

08

:00

20

17

-10

-18

12

:00

20

17

-10

-18

16

:00

20

17

-10

-18

20

:00

20

17

-10

-19

00

:00

20

17

-10

-19

04

:00

20

17

-10

-19

08

:00

20

17

-10

-19

12

:00

20

17

-10

-19

16

:00

20

17

-10

-19

20

:00

20

17

-10

-20

00

:00

20

17

-10

-20

04

:00

20

17

-10

-20

08

:00

20

17

-10

-20

12

:00

20

17

-10

-20

16

:00

20

17

-10

-20

20

:00

20

17

-10

-21

00

:00

20

17

-10

-21

04

:00

20

17

-10

-21

08

:00

20

17

-10

-21

12

:00

20

17

-10

-21

16

:00

20

17

-10

-21

20

:00

20

17

-10

-22

00

:00

20

17

-10

-22

04

:00

20

17

-10

-22

08

:00

20

17

-10

-22

12

:00

20

17

-10

-22

16

:00

20

17

-10

-22

20

:00

20

17

-10

-23

00

:00

20

17

-10

-21

16

:00

20

17

-10

-21

20

:00

20

17

-10

-22

00

:00

20

17

-10

-22

04

:00

20

17

-10

-22

08

:00

20

17

-10

-22

12

:00

20

17

-10

-22

16

:00

20

17

-10

-22

20

:00

20

17

-10

-23

00

:00

20

17

-10

-21

16

:00

20

17

-10

-21

20

:00

20

17

-10

-22

00

:00

20

17

-10

-22

04

:00

20

17

-10

-22

08

:00

20

17

-10

-22

12

:00

20

17

-10

-22

16

:00

20

17

-10

-22

20

:00

20

17

-10

-23

00

:00

Ophelia vs. Darwin

Darwin Opheia

J.Doyle & S.Treacy

Thank You