div class=trans-pagebuttonPage 1button div class=trans-image amp-img class=trans-thumb alt=Page 1: Steel Lintels - 020119 Steel I-Beam Engineeringpdf · REBAR AT TOP OF LINTEL WALL THICKNESS NOMINAL PS6-12+9 ALLOWABLE LOAD LINTEL PS6-8#7 ALLOWABLE SPAN LOAD NOTE ALLOWABLE src=https:reader035fdocumentsnetreader035viewer20220630145fce8e3734efaa0d106fc3c5html5thumbnails1jpg width=142 height=106 layout=responsive amp-img divp020119pdivdiv class=trans-pagebuttonPage 2button div class=trans-image amp-img class=trans-thumb alt=Page 2: Steel Lintels - 020119 Steel I-Beam Engineeringpdf · REBAR AT TOP OF LINTEL WALL THICKNESS NOMINAL PS6-12+9 ALLOWABLE LOAD LINTEL PS6-8#7 ALLOWABLE SPAN LOAD NOTE ALLOWABLE src=https:reader035fdocumentsnetreader035viewer20220630145fce8e3734efaa0d106fc3c5html5thumbnails2jpg width=142 height=106 layout=responsive amp-img divp020119pdivdiv class=trans-pagebuttonPage 3button div class=trans-image amp-img class=trans-thumb alt=Page 3: Steel Lintels - 020119 Steel I-Beam Engineeringpdf · REBAR AT TOP OF LINTEL WALL THICKNESS NOMINAL PS6-12+9 ALLOWABLE LOAD LINTEL PS6-8#7 ALLOWABLE SPAN LOAD NOTE ALLOWABLE src=https:reader035fdocumentsnetreader035viewer20220630145fce8e3734efaa0d106fc3c5html5thumbnails3jpg width=142 height=106 layout=responsive amp-img divp020119pdiv