STATCOM - ADM Eng

Post on 19-Jan-2022

17 views 0 download

Transcript of STATCOM - ADM Eng

Partner company name

ADF Conference 2016

Jonas Persson

Comsys AB

September 16th 2016

STATCOM

Wednesday, September 21,

2016Comsys ADF Power Tuning 1

Partner company name

Powerisn’t perfect

Wednesday, September 21,

2016Comsys ADF Power Tuning 2

• STATCOM

• Introduction to STATCOM

• Hybrid STATCOM concept

• How-to-guide

• Selected References

STATCOM, System IntegrationAgenda

Wednesday, September 21,

2016Comsys ADF Power Tuning 3

Partner company name

STATCOM Introduction

Wednesday, September 21,

2016Comsys ADF Power Tuning 4

• Static synchronous compensator

• VSC based (Voltage Source Converter)

• Traditionally, reactive power only (all quadrants)

• If connected to energy supply, can generate active power

• Faster, more complex than SVC(Static VAR Compensator)

Partner company name

STATCOM Applications

Wednesday, September 21,

2016Comsys ADF Power Tuning 5

• Dynamic Reactive power usable for:

• Compensating cable capacitance

• Stabilize voltage

• DVR applications

• Flicker reduction

• Other grid applications

Partner company name

STATCOM: VSC

Wednesday, September 21,

2016Comsys ADF Power Tuning 6

• Converter part (green)

• Identical to what is being used in 2-level active filters and drive inverters (if using IGBT)

• Maximum IGBT blocking voltage typically 6500V

• IGCT is also an option

• Blocking voltage presents majorchallenge!

• Line filter (red)

• Image shows L-filter; in ADF always LC or LCL

• Scales perfectly with current and voltage

Partner company name

STATCOM: VSC:: High voltage

Wednesday, September 21,

2016Comsys ADF Power Tuning 7

• Voltage limits of converter

• With 2-level, maximum native line voltage <3kV

• Multi-level converter increases this to approx. 6.6 kV

• How to increase voltage tolerance?

1. Series connection(shown)

2. Transformer

Partner company name

STATCOM: VSC:: High voltage

Wednesday, September 21,

2016Comsys ADF Power Tuning 8

1. Series connection

• Series connection requires exact

concurrent ignition of IGBT

(depending on equivalent

inductance in connecting cable)

or single IGBT will take all the

voltage IGBT failure!

2. Transformer

• This is a “simple” solution but

may degrade efficiency; adding

transformer losses to converter

losses. Or?

Partner company name

STATCOM: VSC:: High voltage

Wednesday, September 21,

2016Comsys ADF Power Tuning 9

1. Series connection

• Series connection requires exact

concurrent ignition of IGBT

(depending on equivalent

inductance in connecting cable)

or single IGBT will take all the

voltage IGBT failure!

• Medium voltage series

connected IGBT: prohibitive

complexity!

Image courtesy of ABB. Used without permission

Partner company name

STATCOM: VSC:: High voltage

Wednesday, September 21,

2016Comsys ADF Power Tuning 10

2. Transformer

• Transformer is in itself an inductive component

• By custom-making the transformer, the secondary inductance can be utilized as part of line filter!

• ADF units are then equipped with custom LC line filter

• This is what we did on the first ADF P700

TRAFO1

PPC1-1MCC1 PPC1-2 PPC1-3 PPC1-4

YNyn 0

22.5kV/690V

2000kVA

8%

Dry

Y Y

PPC2-4 MCC2PPC2-3 PPC2-2 PPC2-1WCSC

YNyn 0

22.5kV/690V

2000kVA

8%

Dry

Y Y

Partner company name

STATCOM: LV STATCOM concept

Wednesday, September 21,

2016Comsys ADF Power Tuning 11

• Modular, 2x2 MVA solution

• 690V low voltage switchgear internally – easier to service

• 22 kV main connection

MCC1 PCC1-1 PCC1-2 PCC1-3 PCC1-4 WCSC PCC2-4 PCC2-3 PCC2-2 PCC2-1 MCC2

PP1

PP2

PP3

PP4

PP5

PP1

PP2

PP3

PP4

PP5

PP1

PP2

PP3

PP4

PP5

PP1

PP2

PP3

PP4

PP5

3 2

PP1

PP2

PP3

PP4

PP5

PP1

PP2

PP3

PP4

PP5

PP1

PP2

PP3

PP4

PP5

PP1

PP2

PP3

PP4

PP5

2 3

5 5

See

PP-M3

See MCC-

M2, M3, M4

5 5 5 5 5 5 5 5 5 5 5 5 5 5

See WCSC-

M4, M5

See MCC-M6

See MCC-M1

See MCC-M1

T

A

See

TA-M4

T

A

T

A

T

A

T

A

T

A

T

A

T

A

X10 X10 X10 X10 X10 X10 X10 X10 X10 X20 X10X10 X20

X30X30

See

PP-M1,M2

See

MCC-M1

See

WCSC-M1

X20

M4 M5

Partner company name

STATCOM: LV STATCOM concept (2)

Wednesday, September 21,

2016Comsys ADF Power Tuning 12

• We have supplied LV/HV hybrid

STATCOM up to 130 kV so far

• Scales well to at least 10 MVAr

(depending on voltage/project)

• For very high ratings, LV/HV

hybrid solution becomes

impractical

Partner company name

STATCOM: How-to-guide

Wednesday, September 21,

2016Comsys ADF Power Tuning 13

• Basic idea: stack enough P300 units and connect to large enough transformer!

• Size according to needed MVAr

• For flicker projects, rule-of-thumb is to size so that ADF reactive power exceeds load

• In most cases, custom Transformer/LC-filters are not needed

• Might be considered in some cases

• Special care must be taken with transformer, cooling and CT

Partner company name

STATCOM: How-to-guide: components

Wednesday, September 21,

2016Comsys ADF Power Tuning 14

• Building blocks:

• Regular ADF P300 units, or

• System integration components (PPM300, SCC2, etc; more on this later)

• Up to 6 modules per computer

• Up to 0.167 MVAr per module (690V Liquid cooled)

• In multi-master, max 15 units;

• 15 computer x 6 modules = 15 MVAr!

• Multi-master not necessary in all cases

• Only difference between separate components and complete products is packaging.

Partner company name

STATCOM: How-to-guide: transformer

Wednesday, September 21,

2016Comsys ADF Power Tuning 15

• Typically, Yyn or similar “straight” transformer must be used

• Cannot be used with non-symmetrical loads

• Unbalanced loads will overload such transformer

• For DPF and flicker projects, impedance is selected to give a reasonable short-circuit power

• For Harmonics projects, transformer must be custom-ordered – spectrum to be supplied to transformer mfgr

Partner company name

STATCOM: How-to-guide: switchgear

Wednesday, September 21,

2016Comsys ADF Power Tuning 16

• If using P300 units, dedicated switchgear may not be necessary

• If using gG (or similar fuses), ADF fuses protect connecting cable as well

• Again, short-circuit current must be taken into account

• For example, 4MVA @ uk=6% may give up to 100 kA

• In this case it may be better to divide into two separate transformers

• Take care to follow local regulation!

Partner company name

STATCOM: How-to-guide: CT

Wednesday, September 21,

2016Comsys ADF Power Tuning 17

• Normally use Open Loop configuration

• STATCOM projects typically pin-point load and/or facility

• All of Comsys STATCOMs have open-loop configuration!

• CTs might need to be custom ordered

• CTs placed on medium voltage do not always have 5A secondary

• In some cases, LEM current transducers must be used to maintain measurement precision

Partner company name

STATCOM: How-to-guide: cooling

Wednesday, September 21,

2016Comsys ADF Power Tuning 18

• Majority of Comsys STATCOM installations are liquid cooled

• For liquid cooling, system integration concept is presently only option

• P300W will re-appear

• Main difference is power density and overload-ability in flicker applications

Partner company name

STATCOM: (selected) Reference list

Wednesday, September 21,

2016Comsys ADF Power Tuning 19

Site Year Application Size Voltage

Höganäs 2007 EAF/Flicker 2x2 MVAr +

42 MVAr (THY)

22 kV

Dantysk 2015 Offshore wind farm (DPF) 4x1.5 MVAr 33 kV

Kville 2012 Wind farm/STATCOM (DPF) 2.5 MVAR 130 kV

Lingbo 2012 Wind farm/STATCOM (Flicker) 1 MVAr 33 kV

WDI 2012 Welding/Flicker 2.5 MVAr 20 kV

Sandvik 2010 EAF/Flicker 4 MVAr 10 kV

Global

Casting

2015 Casting/STATCOM (DPF) 4 MVAr 10 kV

Partner company name

Wednesday, September 21,

2016Comsys ADF Power Tuning 20

ADF – the shapeof power to come

Thank you for your time!

Partner company name

Wednesday, September 21,

2016Comsys ADF Power Tuning 21

Questions?

Partner company name

Comsys in brief

Wednesday, September 21,

2016Comsys ADF Power Tuning 22

Power

Quality

expert

Global

partner

Research

driven

Dedicated

to key

segments