Post on 28-Jun-2020
Stage 1 Plan
H
H
H
4.25
4.25
4.25
4.25
1
6.9910
10
1010
6.99
3030
3030
3030
30
30
30
30
30
30
30
30
30
30
30
30
30
30
26.99
6.99
25.99
10
10
10
10
6.99
11.99
3030
3030
3030
3030
3030
15
15
3030
3030
3030
30
1515
15
30
3030
15
11.99
4.25
4.25
4.25
4.25
1314
10.5
10.5
10.510.5
10.5
10.5
15
15
15
10.5
10.5
10.510.5
15
15.520
20 20
2020
20
12.5
12.5
12.5
12.5
12.512.5
12.5
12.512.5
12.5
11.99
16.99
16.99
14.5
15.5
30303030303030303030
9.99
15
15
23.99
23.99
10.5
10.5
12.5
12.5
12.5
12.5
12.5
12.5
14.5
1
135°
135°
135°
135°
90°
90°
135°
90°
90°
135°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90° 90°
90°
90°
90°
90°
90°
90°
135°
90°90°
135°
90° 90°
90°90°
90°
270°
90° 90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90° 90°
90°
90°
90°
90°
90°
90°
90°
90°
90°90°
90° 90°
90° 90°
90° 90°
135°
135°
135°
135°
90°90°
135°
90°
90°
135°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
90°
135°
90°
90°
135°
339
300m²
340
295m²
341
435m²
342
450m²
343
375m²
344
315m²
345
315m²
346
450m²
347
375m²
348
450m²
349
375m²
350
444m²
351
291m²
352
300m²
353
300m²
354
300m²
355
300m²
356
291m²
357
385m²
358
375m²
359
375m²
360315m²
361
375m²
362
315m²
363
315m²
364
375m²
365
315m²
366
375m²
367
465m²
368
295m²369
300m²
90°
90°
90°
90°
5.80 5.80
5.80 5.80
5.80 5.80
5.87
5.97
5.97
5.97
5.87
5.78
5.78
5.69
5.60
5.60
5.60
5.55
5.50 5.50
5.65
5.65
5.65
5.60
5.60
5.60
5.60
5.60
5.60
5.69
5.78
5.50
5.60 5.70
5.70
5.70
5.60
5.50
5.40
5.30
5.60
5.30
5.40
5.20
5.20
5.20
5.20
5.30
5.00
5.00
5.00
Forest Walk
North
Landings Boulevard
Conservation Reserve
Serp
entin
e Ri
ver
Rivers Edge
Forest Walk
Lagoon / Park
FutureRelease
FutureRelease
Osprey
Silkwood
Sandpiper
Sales Centre
Call 13 38 38fraserslanding.com.au
Sewer Line:
Manhole Manhole Connection Connection Valve Hydrant Deferred Powerdome and Connection
Universal Pillar
Lightpole Street Light Road Widening
Western PowerPadmount Site
GarageLocation
Lot Levels Road Levels Brick Paving Footpath Retaining Wall BollardCombinationSide Entry Pit
Grate
Drainage Services:
Manhole Manhole Connection Connection Valve Hydrant Deferred Powerdome and Connection
Universal Pillar
Lightpole Street Light Road Widening
Western PowerPadmount Site
GarageLocation
Lot Levels Road Levels Brick Paving Footpath Retaining Wall BollardCombinationSide Entry Pit
GrateLot Release Existing Residential
RoadReserve
Ashpalt Road Future Road Brick Paving ConnectionPowerdome and Connection
Universal Pillar
Street Light Western PowerPadmount Site
GarageLocation
FootpathRetaining Wall CombinationSide Entry Pit
Sewer Housing Connection
Sewer Manhole Lot LevelsDrainage Manhole
Grate
7.80
Electrical:
Manhole Manhole Connection Connection Valve Hydrant Deferred Powerdome and Connection
Universal Pillar
Lightpole Street Light Road Widening
Western PowerPadmount Site
GarageLocation
Lot Levels Road Levels Brick Paving Footpath Retaining Wall BollardCombinationSide Entry Pit
GrateManhole Manhole Connection Connection Valve Hydrant Deferred Powerdome and Connection
Universal Pillar
Lightpole Street Light Road Widening
Western PowerPadmount Site
GarageLocation
Lot Levels Road Levels Brick Paving Footpath Retaining Wall BollardCombinationSide Entry Pit
Grate
Manhole Manhole Connection Connection Valve Hydrant Deferred Powerdome and Connection
Universal Pillar
Lightpole Street Light Road Widening
Western PowerPadmount Site
GarageLocation
Lot Levels Road Levels Brick Paving Footpath Retaining Wall BollardCombinationSide Entry Pit
Grate
Lot Release Existing Residential
RoadReserve
Ashpalt Road Future Road Brick Paving ConnectionPowerdome and Connection
Universal Pillar
Street Light Western PowerPadmount Site
GarageLocation
FootpathRetaining Wall CombinationSide Entry Pit
Sewer Housing Connection
Sewer Manhole Lot LevelsDrainageManhole
Grate
7.80
Lot Release Existing Residential
RoadReserve
Ashpalt Road Future Road Brick Paving ConnectionPowerdome and Connection
Universal Pillar
Street Light Western PowerPadmount Site
GarageLocation
FootpathRetaining Wall CombinationSide Entry Pit
Sewer Housing Connection
Sewer Manhole Lot LevelsDrainageManhole
Grate
7.80
Lot Release Existing Residential
RoadReserve
Ashpalt Road Future Road Brick Paving ConnectionPowerdome and Connection
Universal Pillar
Street Light Western PowerPadmount Site
GarageLocation
FootpathRetaining Wall CombinationSide Entry Pit
Sewer Housing Connection
Sewer Manhole Lot LevelsDrainageManhole
Grate
7.80Lot Release Existing
ResidentialRoadReserve
Ashpalt Road Future Road Brick Paving ConnectionPowerdome and Connection
Universal Pillar
Street Light Western PowerPadmount Site
GarageLocation
FootpathRetaining Wall CombinationSide Entry Pit
Sewer Housing Connection
Sewer Manhole Lot LevelsDrainageManhole
Grate
7.80
Lot Release Existing Residential
RoadReserve
Ashpalt Road Future Road Brick Paving ConnectionPowerdome and Connection
Universal Pillar
Street Light Western PowerPadmount Site
GarageLocation
FootpathRetaining Wall CombinationSide Entry Pit
Sewer Housing Connection
Sewer Manhole Lot LevelsDrainageManhole
Grate
7.80
Brick Paving
Retaining Wall
FootpathLot Levels
Lot Release Existing Residential
RoadReserve
Ashpalt Road Future Road Brick Paving ConnectionPowerdome and Connection
Universal Pillar
Street Light Western PowerPadmount Site
GarageLocation
FootpathRetaining Wall CombinationSide Entry Pit
Sewer Housing Connection
Sewer Manhole Lot LevelsDrainageManhole
Grate
7.80
Forest Walk - Stage 1
Future Release
This plan is indicative only and is not to scale. Whilst all care is taken to ensure that this plan is correct, all areas are approximate only and may vary. Final designs may alter for reasons outside our control. Purchasers must rely on their own enquiries and the Contract of Sale. Sales status correct as at time of printing - May 2018.
Grate
Light pole
Bollard
Street Light Road Widening
Valve Hydrant Deferred
‘D’
Manhole Connection
Manhole
Manhole Connection
Connection
ValveHydrant Deferred
Powerdome and
Connection
Universal
Pillar
LightpoleStreet Light
Road Widening
Western Power
Padmount Site
Garage
Location
Lot LevelsRoad Levels
Brick PavingFootpath
Retaining WallBollard
Combination
Side Entry Pit
Grate
Call 13 38 38 for an appointment • fraserslanding.com.au
Stage 1 at Frasers Landing is the perfect place to build your first home. With family sized lots to accommodate room for a growing family, set amongst parks, schools, shopping and an outdoors lifestyle.
Build your family their dream home.
Cafes & Restaurants:• Nourishing the Soul Café
• Ugly Mugs Café
• Café One58
• Brighton Hotel Restaurant & Bar
• Redmanna Waterfront Restaurant
• Cicerello’s Seafood Restaurant
For the kids:
House& land packagesavailable
Sport & Recreation:• Serpentine River – fishing, crabbing, kayaking, boating
• Junior & senior soccer, netball and AFL clubs
• Tennis and cricket clubs
• Gyms and health clubs
• Parks and playgrounds
• Beach – under 6km away
Child Care• Goodstart Early Learning
Greenfields• ACE Early Learning Centre• Buggles Child Care Mandurah• World of Kids Fun-A-Rama
• Jack & Jill Child Care Centre
Primary• Dudley Park Primary School• Greenfields Primary School
• Riverside Primary School
Secondary• Coodanup College• Mandurah Catholic College• Foundation Christian College• John Tonkin College• Halls Head College
Community Initiatives:• Community Garden –
The Garden to Plate Project
• Karate Classes
• Men of The Trees
• Pottery in the Garden Workshops
• Art Classes – Watercolour / Craft
• Community Pilates & Yoga
• Heart & Soul Choir
Do youqualify for the$10,000 First
Home OwnerGrant?