Post on 04-Dec-2021
UP
UP
UP
DN
2 3 4 5 6 7 8 9 10 11 12 13
D D
C C
B B
A A
B.3
1
B.4B.4
A.9
7.8 9.5
1AC4.3.2
1AC4.3.2
CHILD COLLAB209
CHILD COLLAB211
DIGITAL STUDIO203A
W R
ESTR
OOM
2T1
CHILDRENS205
STAIR 012S1
YOUNG ADULT206
FAMILY RR2T3
TELECOM2F1
MOTHER'S RM2T1.A
ELEC2L1
SHAFT 12SS1
CHILD STOR210
SERVICE ELEVATOR2E1
MEDIUM DANCE215
LG DANCE223
DANCE OFFICE224
MUSIC ROOM218A
LARGE (FITNESS) CLASSROOM222
LOCKER216
STORAGE2X3
STORAGE2X6
MUSIC ROOM218B
MUSIC ROOM218C
ELEC2L2
TELECOM2F2
SHAFT 22SS2
JC2J1
W R
ESTR
OOM
2T6
M RE
STRO
OM2T
5
STAIR 022S2
CHILD CLASSROOM221
LOCKER217
LG CL STORAGE2X4 TE
RRAC
E2X
5CHILD RR2T4
ECR SEATING201B
ECR LOBBY201
M RE
STRO
OM2T
2ECR RECEPTION
201A
COMMUNITY ROOM214
MAKER SPACE212
PROG. STOR2X2
2 MAINSTREET WEST2C1
ELEVATOR2E2
FACILITY STORAGE2X1
2AC4.3.3
2AC4.3.3
C2C3
C4C5
CDCC
CBCA
3AC4.3.3
3AC4.3.3
1AC4.3.3
1AC4.3.3
4AC4.3.2
4AC4.3.2
A.2 A.2
7.2
3AC4.3.2
3AC4.3.2
7.5
STAIR 032S3
TEEN COLLAB(AV)207
TEEN COLLAB208
CHILD STORAGE221B
7.4 7.6
1AC4.3.5
1AC4.3.5
2AC4.3.5
2AC4.3.5
B.7 B.7
20' - 0" 30' - 0" 30' - 0" 30' - 0" 35' - 0" 15' - 0" 13' - 0" 11' - 9 5/8" 14' - 8 3/8" 14' - 8 3/8" 11' - 9 5/8" 13' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0"
15' - 0" 15' - 0"
15' -
6"32
' - 0"
31' -
0"
8' - 2
"22
' - 10
"12
' - 0"
12' -
0"8'
- 0"
12' - 0"
30' - 0"
12' - 0"
8' - 0"
30' - 0"
8' - 0"
GREEN ROOM203B
CORRIDOR (2 EAST)2C2
1AC4.3.1
AC4.1.1
3 SHEE
T AC
2.1.2A
SHEE
T AC
2.1.2B
483' - 10"
MOTHER'S RM2T7
OPEN TO BELOW
OPEN TO BELOW
AC4.1.1
1 Sim
2AC4.3.1
AC4.2.22
4
AC1.2.2
2
AC1.2.2 3
2AC2.3.01
AC2.3.0
4AC2.3.0
5AC2.3.0
MUSIC WAITING218
NORTH NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
301 BATTERY STREET7TH FLOORSAN FRANCISCO, CA 94111415.227.0100smithgroup.com
Plot
Date:
A B
COMMUNITY CIVIC CENTERCITY OF SOUTH SAN FRANCISCO
EL CAMINO REAL & CHESTNUT AVE.SOUTH SAN FRANCISCO , CA 94080
PROJECT TRUE
9/3/20
20 8:
38:52
AM
FLOOR PLAN - LEVEL 2
AC2.0.2
Autho
r
10609.000
L. PAINT ALL EXPOSED SURFACES INCLUDING CEILINGS, HM DOOR, HMDOOR FRAMES, GRILLES, FIRE HOSE OR EXTINGUISHER CABINETS,EXPOSED PIPING, ETC. UON. TO MATCH WITH ADJACENT WALL ORCEILING WHERE IT OCCURS PER RCP, UON.
M.
ALL WALL BASE AT PARTITIONS TO BE AWB-2 UON. BASESSCHEDULED FOR PAINT SHALL MATCH WITH AWB-2 , UON.
N. ALL CARPETED SURFACES SHALL RECEIVE STRAIGHT BASE. HARDSURFACES SUCH AS VINYL OR RUBBER FLOORING SHALL RECEIVECOVE BASE.
O. COORDINATE CARPET DIRECTION WITH ARCHITECT PRIOR TOINSTALLATION. SUBMIT SEAMING DIAGRAM TO ARCHITECT PRIOR TOCARPET INSTALLATION.
P. COORDINATE STARTING POINT OF FLOOR AND WALL TILE WITHARCHITECT PRIOR TO INSTALLATION. SUBMIT DIAGRAM FOR REVIEWAND APPROVAL.
Q. ALL INTERSECTIONS OF FLOOR FINISH MATERIALS SHALL BELOCATED DIRECTLY UNDER CENTER OF DOOR, WHERE OCCURS,UON.
R. SEALANTS AND CAULKING ARE TO MATCH THE SURFACE IN WHICHTHEY APPEAR. GC TO COORDINATE WITH ARCHITECT PRIOR TOINSTALLATION.
S. RECEPTACLE COVER PLATE TO BE WHITE TYP, STAINLESS STEEL ONNON WHITE FEATURE WALL INCLUDING WOOD VENEER AND PANTRYBACK SPLASH.
T. ALIGN WALL REVEALS WITH ADJACENT FLOOR TRANSITION AND/ ORADJACENT CEILING TRANSITION - REF. RCP, ELEVATIONS, WALL ANDFLOOR FINISH PLANS FOR INFORMATION
U. MECHANICAL ENCLOSURE AND MECHANICAL PENTHOUSE SHALL BEPAINTED WITH UPGRADED EXTERIOR PAINT AND COATINGS.
V. ALL FINISH SHALL MEET OR EXCEED CLASS B FLAME SPREAD ANDSMOKE DEVELOPED INDICES.
A. REFER TO THE AC0.X SERIES SHEETS FOR ARCHITECTURALGENERAL NOTES, DRAWING, REFERENCE AND MATERIAL SYMBOLS,ABBREVIATIONS, AS WELL AS DIMENSIONING CONVENTIONS USEDON THIS SHEET.
B. REFER TO AND COORDINATE WITH STRUCTURAL, MECHANICAL,ELECTRICAL, PLUMBING, AV, AND SIGNAGE DRAWINGS FORADDITIONAL INFORMATION NOT SHOWN ON THIS SHEET.
C. FOR BASIC LIFE SAFETY AND CODE INFORMATION APPLYING TO THISPROJECT, REFER TO THE GC2.X.X SERIES SHEETS LOCATED PER THEPROJECT SHEET INDEX.
D. REFER TO THE "REFERENCE ELEVATION DEFINITIONS" LOCATED INTHE AC0.X SERIES SHEETS FOR ROOF ELEVATION DEFINITIONS.
E. REFER TO THE AC5.X SERIES SHEETS FOR ROOFING DETAILS.
F. ROOF ASSEMBLIES SHALL BE MINIMUM OF CLASS B FIRECLASSIFICATION, OR AS SPECIFIED IN THE PROJECT MANUAL.
G. ROOFING TPO, TYP. SEE SPEC 075423
H. CONTRACTOR TO NOTIFY ARCHITECT OF ANY CONFLICTS WITH WALLMOUNTED DEVICES INCLUDING LIGHT SWITCHES AND FIRE ALARMSTROBES WITH NON WHITE, ACCENT FINISH APPLIED WALLS.
I. CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FORDELIVERY LEADTIMES FOR ALL FABRICS AND OTHER CUSTOMFINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERYTIMES MUST BE CONFIRMED AND ANY EXCESSIVE LEAD TIME MUSTBE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TOALLOW FOR RESPECIFICATION IF NECESSARY.
J. FOR SURFACES WITH MORE THAN ONE FINISH NOTES, REFER TO THEELEVATION FOR EXTENT OF FINISH.
K. ALL WALLS AND GWB SOFFITS TO BE PAINTED PNT-0 UON.
GENERAL NOTES
SCALE: 1/16" = 1'-0"1 LEVEL 2 - FLOOR PLAN
ROOM # PROTOCOLS
Spaces are numbered using a three (3) digit identifier. Front-of-house spaces are those used by the public or building users. Back-of-house spaces are those typcially accessed by facilities personnel. Explanation below represents the phylosophy for both space types. Numbers are assigned starting at main entrances (or elevators) and working in a clockwise rotation, or linearly from east to west.
For front-of-house spaces2 01 .A| | || | Space or internal room option - 1 digit alpha| Space or suite number - 2 digit numericLevel number – 1 digit numeric
Ex. 110 111 112.A 112.B 201 202 203 311 312
For back-of-house spaces2 X A| | || | Space sequential number - 1 digit alpha| Room symbol - 1 digit alpha (see table below)Level number – 1 digit numeric
Room Symbol Table:Symbol Room DescriptionC CirculationE ElevatorsF Telephone/Data, IDFJ Janitorial ClosetsL Electrical roomsM Mechanical roomsP Enclosed ParkingS Enclosed StairsSS Major Mechanical ShaftsT ToiletsX Rooms that don’t fit above, ie. Storage
Ex. 1T1 1T2 1T3 1L1 1L2 1S1 1S2
SSF PERMIT SET BC#3 / BID SET 1 2020-09-04