Hydropower production and other river stakeholders requirements: How to manage with SHARE MCA supported by SESAMO and VAPIDRO ASTE software Project final meeting Aosta – Italy, 24th May 2012 Josef Schneider, Christopher Schreiber
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Introduction
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Sustainable hydropower has a major role to play in Europe’s energy future
• It is representing a key infrastructure for economic growth and welfare
• At the local and regional level, hydropower can have an enormous effect on communities and environment
Introduction
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• The balancing of conflicting interests and stakeholder involvement is essential
• Significant diversity of hydropower project types and sizes makes it difficult to establish general measures
• To meet the needs, greater understanding of the stakeholder conflict is needed
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• A key challenge is to integrate sustainability into the design and management of hydropower projects and to assess the alternatives
SHARE approach
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Water resource management - Sustainability of hydropower infrastructures
• Balance between economic and ecological needs
• To provide a transparent and inclusive process which endeavours to enable any interested party to be involved
SHARE approach and aim
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Data, comments and feedback were collected to adapt SHARE's approach & results to local and national background and to a concrete way of management
• Collaboration and stakeholder participation is the strength of this project
• Promoting and enhancing the dialogue with all stakeholders to increase both the visibility and impact of the project
Identifying decision-makers and stakeholders
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Which stakeholders are considered to be relevant in the investigation areas?
• Main stakeholders affected by hydropower: ► Hydropower producers, operators and developers
► Regional and local authorities
► NGOs, Organizations for environmental protection
► Fishing
► Tourism / Sports
► Interested individuals
► …
Stakeholders needs
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Method ►Tool: Online Questionnaire
►5 Languages: English / French / German / Italian / Slovenian
►Aim: initial assessment and coordination of different inputs and viewpoints received
Evaluation of stakeholders needs
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Environmental awareness Scale system for the detection of environmental
awareness (SEU-3), Schahn
Acceptance Scale items Prof. Schweizer-Ries
Active conviction Scale items Prof. Schweizer-Ries
Active action readiness SEU3 & Scale items Prof.
Schweizer-Ries & Experts
interviews
Ecology and Electricity Hydro Power Plants – general
Personal data • Gender
• Age
• Citizenship
• Education
• Stakeholder group
• Contacts to other stakeholder
• Your opinion
Ecological knowledge Self construction items
Energy and power
station knowledge Self construction items
SHQ
Results Questionnaire
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Analysis of the main factors, dependence of the stake holder groups
Permanent Technical Panel
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• PTP meetings and workshops ►Several regional and national
meetings in all participating countries
►Discussion about the SHARE tools and active participation of the stakeholders
►Workshops have been broadly advertised in the regions to ensure maximum possibility of representation from a variety of stakeholders
Permanent Technical Panel
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Results ►The exchange with the
stakeholders provided us with valuable feedback on our activities
►Opportunities to contribute to the elaboration of new tools
►Stakeholder dialogues to share experiences hold the potential for innovative solutions
Pilot Case Studies
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• SHARE approach and tools have been tested in 11 pilot case studies
• The local PTP is involved in these pilot case studies as both a steering committee and a pool of expert
• The feedback to the SHARE partners is used to improve the tools
Support by software tools
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Software tools developed during the project to support the multicriteria approach:
• Vapidro Aste
• Smart Mini Idro
• Developer and customizer: RSE
VAPIDRO-ASTE is a free GIS tool, developed by RSE (Italy) that
calculates the remaining hydropower potential in a watercourse and the
best locations of future plants, considering the Digital Elevation Model,
the measured flows and the present withdrawals.
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Assessment of the remaining hydropower potential in watercourses
Alpine Space Area
Testing detailed area
When creating a new project, the whole map of the Alpine Space is shown.
The user is able to select and area where to work on.
In the frame of the SHARE project, a VAPIDRO-ASTE a customized version
was produced. The version will be delivered including the Digital Elevation
Model of the Alpine Space area:
SHARE, Final meeting – Aosta – Italy, 24th May 2012
New project creation
Automatic river generation
VAPIDRO-ASTE is able to create
automatically the river network, departing
from the Digital Elevation Model and the
density factor
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Area selection, sub-basin computation
Power (kW)
Structural lenght
It is possible to view the discharge, energy and power tables an charts in reference to the selected river. The “x” axis is the progressive distance measured from the closure.
Energy (kWh/year)
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Installable power and energy
VAPIDRO ASTE is able to visualize the results on GIS, as a map with a coloured scale (heads, energy and power, cost, benefits, financial parameters)
Installable Power (kW)
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Installable power in a GIS map
VAPIDRO Hydropower Optimization Tool: tables and charts
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Hydropower Exploitation
Intake
Powerhouse
VAPIDRO Hydropower Optimization Tool: plants in the Map
Intake
Powerhouse
Intake
Powerhouse
Intake
Powerhouse
Intake
Powerhouse
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Hydropower Exploitation
• SMART Mini-Idro is a tool for technical and economical evaluation of mini hydro power plants
• Evaluates the energy production, benefits and financial aspects
• Supports the pre-feasibility project analysis
• Used in the frame of the SHARE project
SHARE, Final meeting – Aosta – Italy, 24th May 2012
SMART Mini-Idro
SMART Mini-Idro allows the input of the flow duration curve and considers the minimum environmental flow. Calculates the Power duration curve as function of the efficiencies and types of the selected turbine.
SHARE, Final meeting – Aosta – Italy, 24th May 2012
SMART Mini-Idro
SMART Mini-Idro calculates the costs of the plant based on correlation curves, the income from the sale of energy produced and the financial parameters:
SHARE, Final meeting – Aosta – Italy, 24th May 2012
SMART Mini-Idro
MCA
Integration of the software tools in SHARE`s MCA
SHARE, Final meeting – Aosta – Italy, 24th May 2012
Vapidro-Aste
SMART Mini-Idro
Questionnaire
Criteria Alternative 1 Alternative 2 Alternative x PTP/Stakeholder
Distribution of software tools
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Online seminars occurred regularly, depending on the evolution of SHARE's results
• PTP members can learn how to use the SHARE tools via tutorials, examples and trainings
• The stakeholder assessed the tools' efficiency and reliability
Communication tools
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• SHARE has a very informative web presentation which is used to communicate with all interested stakeholders: http://www.share-alpinerivers.eu/
• It is regularly updated and all news in relation to the project can be found there
Stakeholders involvement
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• To obtain detailed feedback from a diversity of views on the content and applicability of the “SHARE-approach”
• To ensure that the final tools and reports of SHARE are credible and useful to stakeholders
• To ensure that stakeholders understand how they can get involved and feel that their involvement is meaningful and has the potential to make a difference
Dissemination of best practices
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• To promote existing best practise examples from different countries participating in the SHARE project and their transfer to other regions
• Reports with description of best practices with examples and references: Handbook, technical reports (for example: MIF (minimum instream flow) definition and use for hydropower production)
Conclusion
SHARE, Final meeting – Aosta – Italy, 24th May 2012
• Increasing awareness of stakeholders for ecological, economic and social aspects
• The willingness of all stakeholders to integrate environmental concerns and economic costs and benefits in the planning process can mitigate negative effects and make hydropower a sustainable way for generating electricity
• The „SHARE approach” helps to make transparent decisions in this process
Thank you!