Post on 28-Feb-2021
Phone: +91 8080806851
Email: info@savictech.com
Website: www.savictech.com
Profit Center Analysis
FS for New General Ledger
Financial Statement Analysis
Manufacturing Order Item Queries
Capacity Requirement
Manufacturing Order Operation
SOLMAN
Infrastructure Readiness
OS Installation
SAP ‐ OS Prerequisite
Solution Manager ABAP Installation
Solution Manager Java Installation
SLD Configuration
Solution Manager Configuration
Adding Satellite System
EWA Configuration
Sandbox Creation
Infrastructure Readiness
OS Installation
SAP ‐ OS Prerequisite
SAP Installation
Patching SAP, DATABASE to that of Production System
Production DB Backup
Restore on Sandbox System
ECC Upgrade on Sandbox
Checking the Hardware Requirements
Checking the Software Requirements
Checking the Source Release of the SAP System
Meeting the Operating System‐Specific Requirements
Upgrade of the Operating System and Database System if required
Checking the Software Update Manager Version Compatibility
Checking the Structural Requirements for ABAP
Execution of Software Update Manager
Quality Assurance and Testing
Downtime Minimization
Cutover Planning
Go‐Live and Post Go‐Live Support
SOH
Plan
Prerequisites
Dual‐Stack Split
Unicode Conversion
Landscape Designing
SAP HANA Appliance
Scale‐up
Increase the size of the hardware (main memory, number of CPUs)
Scale‐out
Several nodes (servers) are switched together for one database
Data are distributed over the main memories of these different nodes
Execution
Migration Options
In‐place migration
Copy, upgrade + migrate
Update & Migrate
Go‐Live & Post Go‐Live Support
SAP S/4HANA Conversion
Discover ‐ Understanding current landscape and thrid party integrations
Plan ‐ Planning the target landscape and software versions
Explore ‐ Documenting, prioritizing, and validating functional gaps between current software and S/4HANA
Changes to existing functions
Functions no longer supported
Functions that are no longer strategic
Realize ‐ Implementing Technical & Functional Changes
Deploy ‐ finalize the readiness for SAP S/4HANA and business processes for production go‐live
Go‐Live & Post Go‐Live Support
Project Duration
16‐20Weeks
*SAP Performance Benchmarking »
x10 Reduced
footprint
x7Increased
throughput
x1000Analytics
Speed
26%Annual Financial
Close Fewer Days
SAVIC rUpAntaraNa (S/4 Conversion)
SAP S/4HANA CONVERSION Choosing Your Path To SAP S/4hana
Types of Migration Path
Conversation of an existing SAP Business suite system to SoH with GST
SAP S/4HANA Conversion Steps
SAVIC migration templates helps clients to select right transition methodologies from current system to SAP S/4HANA in‐memory computing platform
Key simplifications and innovations
Optimized working capital
Increased visibility with real‐time stock
Better customer service
Reduced manufacturing cycle time
Decreased stock buffers
Lower procurement costs
Realtime monitoring of Prod. orders
No aggregates
Responsive user experience design
Improved operational decisions
Real‐time inventory management and material valuation
Accelerated material requirements planning
Advanced available to promise (aATP)
Integrated quality management
Industry to core –discrete industries and mill products(DIMP)
Effective order management and billing
Efficient procurement
Entire SAP S/4HANA Finance scope included
Consistent SAP Fiori user experience (UX) for SAP S/4HANA
SAP HANA Views / CDS & SAP Fiori User Experience
Pre‐delivered HANA Views
Flexible reporting
Quick Start and customizable
Easy‐ to‐use interface
Balance of General Ledger Account
*SAP Performance Benchmarking »*SAP Performance Benchmarking »
**This is an indicative pricing. Actual pricing will be calculated on HSAV value
starting from
35 lakhs INR **SAP S/4HANA Licenses Cost Approx. 200 SAP ECC users
Phone :+91 22 41312234/35/36info@savictech.comwww.savictech.com
PLEASE CONTACT
40.00Lakhs Onwards*
Above Conversion Service price based on fix scope for customer with Database Size < 1 TB *, Cloud Hosting Charges & Taxes Extra
* This is an indicative pricing. Actual price for Migration services will be arrived after detailed study & actual conversion complexity
“The license/ implementation service can also be procured separately.”